Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
FONT IP intra-train feedback prototype status
IPBSM status and plan ATF project meeting M.Oroku.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Roundup of Week at ATF Mikey Davis 19 April /26.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
Laserwire: high resolution non-invasive beam profiling
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Tolerances on magnetic field along the beamlines from accelerator physics point of view Tentative, suggested for discussion at IRENG07 WG-D meeting, August.
March Trip Plan Mikey Davis 01 March /7.
Towards a ground motion orbit feed-forward at ATF2
Feed forward orbit corrections for the CLIC RTML
Present Status of Orbit Stabilization at SPring-8
Presentation transcript:

Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak

2 Laser-wire Setup Detector e-e- ATF-II Extraction Line New IP

3Operations Operations during March – June No operations during Autumn Goal of 1 micron laser-wire scan Full characterisation of laser-wire

4Results Many scans between 0.9 and 1.5 um Non-Gaussian shape as expected from laser

5 Consistent Picture Not always so good Beam drift ―much improved now due to linac feedback Bpm orbit subtraction in progress BPM LWIP BPM Mover e-e-

6 Signal to Noise Background low under normal ATF2 operation Required squeeze in βat Laser-wire IP increases Laser old and can be unstable -> lower energy

7 Signal Correlations Background correlation varies from week to week Hardware improvements for laser normalisation

8 Variation in Background

9 Laser Characterisation Characterise using scaled up focus Scale this measurement to laser-wire IP Two axis – astigmatic – project vertical sigma

10 Orbit Jitter Subtraction Orbit jitter subtraction currently doesn’t improve Method being revised Correction is small compared to poor correlations

11 Current Operations Recommissioning laser-wire since last year Investigation of signal correlations Investigation of orbit correction Improvements in signal characterisation Increased precision

12 Future Operations Goal of 1 micron laser-wire scans a reality Consistent data needed for publication Operations confirmed until March Possible operations until Summer 2013 Current incarnation will finish this summer New laser source required for further operations Resolution aspect of laser-wire study complete High repetition rate and intra-train scanning underway at DESY