TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.

Slides:



Advertisements
Similar presentations
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Advertisements

Development of the Electrical Power System in the Northwest Dependence on hydropower - Atlas p. 101 Early non-federal projects - Skagit, Elwha Federal.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Andy Wood Univ. of Washington Dept. of Civil & Envir. Engr. Statistics related to the merging of short and long lead precipitation predictions in the continental.
US Army Corps of Engineers BUILDING STRONG ® Weather, Runoff, and Water Quality Summary Water Year 2010 Steven B. Barton, P.E. Chief, Reservoir Control.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
Temperature and Flow Dynamics of the Klamath River Technical Memorandum 7 Leon Basdekas Mike Deas Watercourse Engineering, Inc nd Street, Suite B.
Northwest River Forecast Center Seasonal Volume Outlook Using Ensemble Streamflow Prediction for the 2012 Water Year Steve King, Sr. Hydrologist Northwest.
Northwest River Forecast Center Seasonal Volume Forecasts Using Ensemble Streamflow Prediction for the 2011 Water Year Steve King, Hydrologist
Alan F. Hamlet Andy Wood Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington September,
Seasonal Volume Forecasts Using Ensemble Streamflow Prediction for the 2007 Water Year Kevin Berghoff, Hydrologist Northwest River Forecast Center.
NWS ~ NorthWest River Forecast Center Seasonal Volume Forecasts Using Ensemble Streamflow Prediction for the 2006 Water Year Kevin Berghoff, Hydrologist.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Alan F. Hamlet Andy Wood Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington September,
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Southwest Hydrometeorology Symposium Tempe, AZ September 28, 2011 Kevin Werner NWS Colorado Basin River Forecast Center : A Year of Extremes.
John M. Volkman June 13, 2003 Either/Or? Is it Hydropower or Salmon in the Northwest?
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Hydro Power 102. Hydroelectric Models in the Northwest.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Alan F. Hamlet, Nathalie Voisin, Dennis P. Lettenmaier, David W. Pierce Center for Science in the Earth System Climate Impacts Group and Department of.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
2016 Long-Term Load Forecast
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
2015 Fire Season Considerations and Outlook SWCC Predictive Services Updated May 18, 2015.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
NON-TREATY STORAGE AGREEMENT “Introduction to Operations and the Non Treaty Storage Scenarios” Presenter: Jim Gaspard.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
TAS Quarterly Meeting Further Investigation of Load and Energy Shapes for use in the 2026 Common Case November 4-5, Tom Miller- TAS Vice Chair.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
NW Loss of Load Probability James Gall Power Supply Analyst
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Hydro Modeling Improvement for TAS Approval May 4, 2017
MWG Recommended Hydro Improvement March 7, 2017
(April, 2001-September, 2002) JISAO Climate Impacts Group and the
Kevin Berghoff, Senior Hydrologist
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Kootenai Basin Spring/Summer Operations for 2016
Jamie Austin, PacifiCorp
Outline Modeling Issue 2017 Modeling Goals
MWG Recommended Hydro Improvement March 14, 2017
Modeling Assumptions for 2033 High Renewable PCM
Long-Range Hydropower Forecasts for the Columbia River, Colorado River, and Sacramento/San Joaquin Systems Alan F. Hamlet, Andrew Wood, Nathalie Voisin.
MWG Recommended Hydro Improvement March 7, 2017
Hydro Modeling Improvement for TAS Approval May 4, 2017
Recommended Hydro Improvement April 11, 2017
Jamie Austin, PacifiCorp
Study Results Drought Scenario Study
Presentation transcript:

TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair

Overview Compare unimpaired Run-Off Compare Hydro generation Compare Load Shapes Wind vs. Water Year Northwest Export to California Perspective Summary 2

Unimpaired Run-Off The chart show 85 calendar years of unimpaired run-off at The Dalles – Unimpaired Run-Off: Natural flow without regulation (dams), municipal or agriculture use Observations: – Annual peak flow: Jun – 2 nd highest flow: May – 3 rd highest flow: Jul – 4 th highest flow: Apr 3 Northern CA run-off: Average 23.6 MAF Median 21.5 MAF Clearly June is the peak flow month Black dash line: Coincident Avg Shape (11 Years) +/- 5 years around annual average Monthly rank order (sorted) then avg/un-sorted

Averaging Monthly Shape Issue: With weather dependent systems the peak can occur on one of several month. Hydro flow is no different, a simple average or median of the data will distort - compress the fundamental shape. The, unimpaired run-off, peak flow on the Columbia River occurs on during May or Jun based on 86 years of water year data 4 The average flow for May and June is 87% and 90% Averaging results in the loss of 10% of the peaking flow for the peak month Averaging reduces monthly volatility

Compare 2008 and 2009 Flow 5 Unimpaired Run-Off (No regulation of flow) Typical peak flow occurs in Jun and around 30.5 MAF 2008: Peak flow of 31.6 MAF; Summer flow in-line with historic 2009: Peak flow of 25.7 MAF; Lower summer flow 2009 is not in the 11 years around long-term flow

NW Forecasted Hydro Generation 6 Hydro generation from the 2014 Biological Opinion for the Core Projects on the Columbia River – Coulee – Bonneville (11 Projects) for 79 years of operation ( ) Observations: – Annual peak Gen: Jun – 2 nd highest Gen: May – 3 rd highest Gen: Jul – 4 th highest Gen: Apr Calendar year 2008 and 2009 is not included 2014 Bio Opinion

Compare Hydro Generation 7 In favor of 2008In favor of 2009 John Fazio (NW Council) recommends 2008 as the best year to represent normal Hydro generation in the NW For NW, a clear spring peak in June while 2009 has a muted peak For NW, 2008 normal Jul-Sep generation while 2009 has a muted -2,250 aMW For CA, the 2009 has more generation in the Q3 and Q4 For CA, 2009 has a more pronounced generation in the spring coinciding with spring run-off Northwest Hydro generation is 4.11 times that of California’s.

Impact of Modeling 2009 over The net change in Hydro gen: -48 aMW Significant reduction in NW Hydro Jun-Sep (below normal 2008) Relative monthly change in CA Hydro is minor when compared to the NW West wide the monthly impact of using 2009 over 2008 is significant 5 months where the net swing is greater than 1,500 aMW The net swing in: Jun: -2,300 aMW Jul: -3,200 aMW Aug: -2,300 aMW

Load Shape 2008 has a uniform seasonal shape 2009 has a muted June 9 Not a primary concern Growing load with monthly peak and demand eliminate any non-conforming seasonal shape Background: Monthly load f (CCD) & peak f (day-day temp) CEC uses %

California Monthly Wind Stable annual generation with monthly volatility greater than the annual 2008: Median spring/summer 2009: Above median spring 10 CA peak wind gen May-Aug

Northwest Monthly Wind Stable annual generation with monthly volatility greater than the annual 2008: Peak wind in Jun coinciding with peak Hydro 2009: Peak wind in Mar and below median in spring 11 NW peak wind gen Apr

NW Export Shape to CA The operating range on the Core Columbia River generation has narrowed starting in 2011 The hourly export shape to CA has also narrowing starting in Charts: Average hourly weekday shape to California (Path 65 & 66)

Perspective WECC modeled Hydro generation is 2.2 times that of modeled Wind/Solar (From 2024 WECC 1.4 dataset) Selecting a reasonable Hydro year has a greater impact on transmission flow that modeled Wind/Solar 13

Summary NW HydroNormal Hydro gen Clear spring peak (Jun) Normal summer gen Muted spring run-off: -10% Week summer gen Q3 -2,250 aMW CA Hydro2008 is lower than 2009Closer to normal but still a below normal Net Monthly HydroThe normal NW Hydro shape out weighs the negative impact of CA Hydro Significant negative impact to gen: Jun-Sep Improved gen in Apr Load ShapeGrowing load with monthly peak and energy instead of annual results in this being a secondary issue NW WindAnnual gen high: 11.7%Annual gen low: -4.5% Monthly Strong spring w/spike in JunWeek spring CA WindAnnual gen high: 7%Annual gen high: 3.3% Monthly Close to medianHigh in spring

15 Kevin Harris (503)

Modeled Solar WECC 1.5 On average California Solar serves 10% of it’s load 16