DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia.

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
SBS Hadron and Electron Calorimeters Mark Jones. SBS Hadron and Electron Calorimeters Mark Jones Overview of GEn, GMn setup Overview of GEp setup The.
Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Beam Position Monitors MICE CM Harbin January, 2009.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
Deeply Virtual Compton Scattering on the neutron Malek MAZOUZ LPSC Grenoble EINN 2005September 23 rd 2005.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
DVCS – Hall A Study of the Background Noise HUGS 2008 Florian ITARD.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
SPI-ACS EM MeasurementsCornelia Wunderer, MPESPI-Team Meeting, Paris, SPI - ACS EM Scientific Measurements August 19 - September 4, 1998 at.
3 rd Angle Projection A 3 rd Angle projection is a 2D drawing of a 3D object. It shows three views the side view is drawn first. The plan view is drawn.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Chapter 5 : Power Supplies Visit for more Learning Resources.
ACTIVE DIVIDER for anode currents up to 10 microamps
Perimeter.
Mini-drawers, FE-ASIC , Integrator
Electronics for RPC Upscope
Pictures and comments from Vitali Smirnov August 2010
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Stephen Pate New Mexico State University September 1999
Translate 5 squares left and 4 squares up.
What about −(−6) ? What quantity is in the box?.
Presentation transcript:

DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting December 2008 Monastir, Tunisia

3D overview

Data Acquisition Position XY- Table DVCS Stand 75cm

Calorimeter: Plan View

Elastic Calibration: Target to Calo = 5.6 m No double cantilever

Full Extension: Target to Calo = 6.24 m Double cantilever

Cable Passage, Light Isolation Removable floor-plates 75 cm HV, LV, DC: Flat ribbon cables to main patch Signal: RG58

E Calorimeter Cabling

E Patch Panel

XY-Table in LED Calibration Position, 3m Black Box and XY-Table move separately  Requires crane  XY-Table cable

XY-Table, Detail New XY arms for 39x48 cm 2 motion.

XY-Table in LED Calibration Position Black Box and XY-Table move separately  Requires crane  XY-Table cable

Blue Light

Blue Light, with Ballasts

Calo Blocks Add another square annulus to secure PMT base.

SICCAS

ATLAS and “MOD” R7877 PMTs Same pinout? Different shape. 100 PMT on order

E General View

E General View / Patch Panel