The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.

Slides:



Advertisements
Similar presentations
Introduction. OzPoz is the fiber positioner for FLAMES, a multi-object spectroscopic facility on the VLT. It can feed light from as many as 140 objects.
Advertisements

GLAO instrument specifications and sensitivities
Echelle Spectroscopy Dr Ray Stathakis, AAO. What is it? n Echelle spectroscopy is used to observe single objects at high spectral detail. n The spectrum.
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
Phase Shifts of Sinusoidal Graphs. We will graph sine functions of the following form: The amplitude A =  A  The period T = 22  The phase shift comes.
An Echidna-style positioner for DESpec Will Saunders 8 March 2011.
Spectroscopy Techniques and Projects at 1.2-m UK Schmidt Telescope
6dF Data Release 2 The good, the bad and the ugly Will Saunders AAO 27/04/05.
Memorandam of the discussion on FMOS observations and data kicked off by Ian Lewis Masayuki Akiyama 14 January 2004 FMOS Science Workshop.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
AAO Fibre Instrument Data Simulator 10 October 2011 ROE Workshop 2011 Michael Goodwin Tony Farrell Gayandhi De Silva Scott Smedley Australian Astronomical.
Time-Series Forecast Models EXAMPLE Monthly Sales ( in units ) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Data Point or (observation) MGMT E-5070.
INSTRUMENTATION/ OID / L. Pasquini/ 1 ____________________________________________________________ FLAMES COORDINATION AND INTERFACES. FIELD CORRECTOR.
Discussion - Survey Design Survey product equation: #fields = fld/nt x useable x (%xnights/yr) x years = 4 x 0.5 x (0.75 x 13 x 18) x 3 = 4 x 0.5 x 175.
The 6dF VPH Upgrade and other instrumental issues Will Saunders, Martin Ostreich, Allan Lankshear, Brendan Jones, Mick Kanonczuk, Kristin Fiegert, John.
6dF workshsopATNF May 30th dF: Observing, data reduction & dataflow Q.A.Parker Macquarie University/AAO.
Time Series Analysis Predicting future sales from past numbers.
Practical applications: CCD spectroscopy Tracing path of 2-d spectrum across detector –Measuring position of spectrum on detector –Fitting a polynomial.
6dFGS data quality: comparison of pipeline and IRAF redshifts Lesa Moore Macquarie University AAO 6dF Workshop 2005.
The 6dF Galaxy Survey - The Target Samples Will Saunders Anglo-Australian Observatory.
Status of LAMOST ZHAO Yongheng National Astronomical Observatories of China.
Windows Server 2008 R2 Oct 2009 Windows Server 2003
Jan 2016 Solar Lunar Data.
Evaluation of 6dF Data Lesa Moore Macquarie University
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Chapter 11 – Project Dashboard
2016 FIT FOR PERFORMANCE Weight Control Program
Nuffield Free-Standing Mathematics Activities Music Festival
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Sentinel-2 Status Update
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule

Step 3 Step 2 Step 1 Put your text here Put your text here
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
©G Dear 2008 – Not to be sold/Free to use
Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Belem Climate Data Table
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Chapter 11 – Project Dashboard
Charlie Haffey Norwood Public Schools
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline

2013 Safety Group Advantage Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Pilot of revised survey
X-ray high resolution spectra in the VO: the case of XMM-Newton RGS
Presentation transcript:

The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory

Feb 2001: 6dF delivered to UKST May 2001: first useful 6dFGRS data June 2001: 6dF declared commissioned Aug 2001: runz useable Sept 2001: acquisition improved Nov 2001: merged sample adopted Dec 2001: 6dFDR workable Dec 2001: much photography Feb 2002: R-arm failure Mar 2002: Robot repair and recalibration Mar 2002: mirrors coated Mar 2002: first fibre repairs Apr 2002: adaptive tiling adopted Jul 2002? Spectrograph VPH upgrade Sep 2002? First data release Salient Dates

Data Reduction Uses 2dFDR. Many teething problems adapting to 6dF data Now working very reliably, public version issued. Automated fibre identification using known gaps Outstanding concerns: sky subtraction imperfect (as per 2dF) wavelength calibration could be improved need to splice V and R spectra only tramline extractions for now

Acquisition Serious problems throughout first year. Guiding uses 4 x 7 fibre guide bundles. Fibres too fragile, many (~50%) broken during commissioning and since. Usually 2-3 useable, not enough Repairs impossible, redesign completed and remanufacture in progress. May move to 75um fibres from current 100um

Fibre breakages Very sensitive to accurate robot calibration ~30 fibres (10%) broken during commissioning normal breakage rate 1/week March/April breakage rate much larger due to imperfect calibration after R-arm failure Now much better, aim is max 2 fibres/lunation Many fibres damaged, poor throughput or fringed. Only one field plate in use currently while other undergoes repair. Repairs very difficult and slow but improving Field Plate 1: 120 fibres, Field Plate 2: 90 fibres

Robot Positioning Accuracy mostly excellent. Problems with homing of encoders on startup caused instability and loss of few nights data. Current uncertainty in precise robot plate scale at level many manual fibering interventions required. Configuring time 1 hour (with all fibres!), little effort made to tune up. New appointment Martin Oestreich will watch over mechanics.

Quality Control Initially very erratic - just trying to sort out problems preventing data being taken at all. Many small changes to spectrograph alignment, focus, wavelength range. Very little feedback possible prior to 6dFDR Now more stable but still need real-time S/N calculator to determine exposure times Biggest problem acquisition. No astronomer present for bulk of 6dFGS observations poor feedback loop timescales 6dF complex and delicate instrument, must expect variable quality at some level.

Spectrograph Upgrade Current peak efficiency ~8% (cf 2dF 5%) 6dF camera overfilled by spectra at ends of slit and ends of wavelength range. Existing reflection gratings good but still only 65% efficiency at peak. Will shortly switch to VPH gratings, 580V (3900A- 5600A) and 425R (5350A-7650A) at same resolution. Should reduce losses for both reasons, hope for 50% efficiency gain. Mirrors coated March 2002 but no efficiency gain.

Survey Progress 2001 May11 Jun17 Jul 0 Aug19 Sep19 Oct19 Nov20 Dec Jan13 Feb 0 Mar25 Apr47 May42 Total 232 6dFGS progress has been erratic with many interruptions due to other programs and instrumental problems. However, the rate at which fields are observed has continually increased. The last two months have had excellent weather, and have achieved record numbers of fields despite only having one field plate for May. However, both field plates have large numbers of broken fibres. 20,000-25,000 galaxies observed. Relatively few additional targets due to priority weighting

Data Quality 6dF capable of taking excellent data - average S/N > 10/pixel in both V and R in 1 hour + 1/2 hour, objects/frame with >1000 electrons/pixel in V. Poor acquisition, robot calibration, seeing or transparency can easily halve S/N or worse No real-time S/N calculator developed yet. Large fraction of data compromised by either observational or instrumental problems. Data quality and consistency generally improving. Concern over whether quality is good enough for D n -σ.

Data Reduction Progress reliable 6dFDR package only available Dec /3 of data reduced 1/5 of data put through runz Further work needed to splice V and R data Velocity dispersion techniques not yet in place Completeness very variable, 60%-95%.

6dFGS prospects Minimum 1100 fields to observe in 3 years => 28/lunation => required average 4/clear night Spectrograph upgrade may allow extra field/night, or better higher S/N. Ways to streamline observing and/or trim the sample extremely desirable Doing better than 2dFGRS