L-band test stations in End Station B Richard Swent.

Slides:



Advertisements
Similar presentations
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
ILC Marx Modulator Development Program G.E. Leyh, Stanford Linear Accelerator Center.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
By Reza Esfandiari, SULI Program Mentor: Carsten Hast August 14, 2009.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Klystron Modulator for Proton Driver
Design Status of IOT for ILC
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
S. FUKUDA LCPAC RF-Systems for STF S. Fukuda Accelerator Laboratory Content Introduction Status of STF and Plan forFY2006 LLRF Summary.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Operational experience of high-power RF at Diamond Light Source
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
L-band test stations in End Station B Richard Swent.
A 500 MeV S-band Low Cost Electron Beam Source for ILC Keep Alive Source Goal: MeV, 3 nC, ~ 1 mm on ILC Ti Target Wei Gai, ANL.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
KEK Marx-Modulator R&D
CBETA Technical Review
Water Cooling issue (Klystron Cooling)
Chris Adolphsen Sergei Nagaitsev
DRFS and Low Energy 10 Hz Option
General presentation about recent status of DRFS
PS System for DRFS PS System for Diode-type klystrons
Toshiba 10 MW Multi-Beam Klystron (MBK)
X-band Facilities and High Gradient Tests Stands Around the World
Klystron Power Supplies for ILC
Linac LLP Outline LINAC Long Lead Procurements
Presentation transcript:

L-band test stations in End Station B Richard Swent

Modulator and Klystron Testing We need to test two modulators and two klystrons for the ILC project We are testing 2 modulators designs for reliability and cost-effectiveness 2 Klystron designs are being evaluated for reliability and efficiency The RF produced will not be used for anything, just measured and dissipated

2 ILC-class modulators One, “Marx”, made at SLAC One, “direct switch”, coming from Diversified Technologies (DTI) in Mass. Both must meet ILC specs: 120 kV at 140 Amps 1.7 msec pulses at 5 Hz 29 kjoules per pulse

Station Equipment Each test stand has –Modulator w/ Power Supply –Oil Tank with: Water Load Filament Xfmr Klystron (Vertical now, horizontal later) –Instrumentation and Controls Each test stand will run independently, 24/7, with summary data archived for trends, detailed data for every fault

End Station B West End This is the part of End Station B where we will put 2 new test stands.

Shielding Wall Removal of the shielding wall is required before any new installation can proceed. This is what the area looked like at the beginning of 2007.

Shielding Wall Removal

Marx Modulator Preliminary testing in B015 Delivery to ESB later this year

DTI Modulator Status unknown—DTI ran out of money before the modulator was completed, and they did not get the follow-on SBIR grant they wanted.

Klystrons: 2x 5 MW outputs Toshiba klystron Being built, will arrive in October SLAC Sheet Beam Being designed, should arrive in Spring 2008

Loads and tanks Each tank can hold a vertical klystron, a water load, and a filament transformer Water loads will be able to take the full output of a modulator in the absence of a klystron Most tank parts have been received. Some small modifications are needed.

Water Loads OldNew

Electrical Power – Phase I S N

LCW Phase I We need 400 gpm of water for two test stands. Regulator and controls will be outside, with pipes emerging behind the clean room. Tie-in will occur in early September.

Floor Plan

Controls and LLRF Commercial instruments have been ordered: –Frequency source –Function generators –Booster amplifiers –Peak power meter (not ordered yet, but soon) Custom LLRF hardware is being built, based on existing designs: –IQ modulator –Pulse width controller –RMS detectors

Schedule Wall removal August 2007 Water Cut-InSeptember 2007 Marx Modulator Oct 2007 DTI Modulator?? Tanks and Water LoadsJuly 2007 Toshiba KlystronOct 2007 Sheet Beam KlystronSpring 2008