Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.

Slides:



Advertisements
Similar presentations
1 NIST NwHIN Testbed. 2 What's NwHIN The nationwide health information network is a set of standards, services and policies that enable secure health.
Advertisements

Joint Exchange / Interop Work Group Test Workgroup John Donnelly Aug 1, 2012.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Hutman September 5, 2012.
California Trust Framework Pilot Request for Funding Informational Webinar 24 June 2013.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
Nick Vennaro, NHIN Team (Contractor), Office of the National Coordinator for Health IT Michael Torppey, CONNECT Health IT Security Specialist (Contractor)
360Exchange (360X) Project Provider Directory Workgroup 09/07/2012.
Bidder’s Conference January 7, 2014 State of Vermont Agency of Human Services Pharmacy Benefits Management (PBM) RFP.
Carnegie Mellon Sponsored Programs and Research Compliance System (SPARCS) Kick-Off Meeting March 6, 2013 Presenters: Ann Mathias, Office of Research Integrity.
Outsourcing IAM in North Carolina
A Primer on Healthcare Information Exchange John D. Halamka MD CIO, Harvard Medical School and Beth Israel Deaconess Medical Center.
NextGen Interoperability – Leading the Charge Presenter – David Venier DISCLAIMER: The views and opinions expressed in this presentation are those of the.
PSU CS 106 Computing Fundamentals II Product Life Cycle & SW Product Life Cycle HM 9/3/2007.
Public Health Reporting Initiative January 11, 2012.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
EsMD Background Phase I of esMD was implemented in September of It enabled Providers to send Medical Documentation electronically Review Contractor.
Cross Domain Patient Identity Management Eric Heflin Dir of Standards and Interoperability/Medicity.
Collaborative Direct-- Status Update December 6, 2013 Don Jorgenson Inpriva, Inc.
Initial slides for Layered Service Architecture
Agenda Teams Responsibilities Timeline Homework and next steps.
Automate Blue Button Initiative Push Workgroup Meeting January 7, 2013.
0 Harmonization Process, Work Plan, and Schedule Chicago IL. March 5, 2007 HITSP Project 2007 Work Plan and Schedule Contract HHSP EC.
K-12 Web Content Development Process
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin/John Donnelly Sept 26, 2012.
Department of Defense, Project Update On-Line Representations and Certifications Application (ORCA) Presented to the SPS All Users Conference November.
© Copyright 2011, Alembic Foundation. All Rights Reserved. Aurion: Health Information Exchange Technology Today Alembic Foundation OSCON 2011 July 27,
Reference Toolkit – What is a “reference” toolkit? – What is the status of the generation 2 Reference Toolkit? – How Big? – Tracking it. We need to understand.
1 Collaboration and Concept Exploration Nationwide Health Information Organization (NHIO) Gateway March 28, 2007.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman Aug 22, 2012.
Larry Wolf, chair Marc Probst, co-chair Certification / Adoption Workgroup March 19, 2014.
Data Access Framework (DAF) S&I Initiative Update June 19 th,
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Defining the 2016 CAS-2 cycle Timeline Slides used by the CAsC Committee on its July 23 rd T-con to establish the timeline for the main activities related.
SAIF Effects on Interoperability Reviews WG Baris E. Suzek May, 11, 2010.
S&I Framework Provider Directories Initiative All Hands Meeting 10/7/11.
ENL1819T Progress Report Confidence in Our Success.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Judith Huntman/Joe Lamy Aug 15, 2012.
S&I Provider Directories Initiative Revisions to Initiative Charter July 1, 2011.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup Wednesday June 13,
Security, Privacy Access openPASS Open Privacy, Access and Security Services Project Status Report July 1, 2008.
Service Component Registry and Repository (SCRR) April 26, 2007 Lico Galindo 2007 Exchange Network National Meeting.
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012.
Lab Results Interface Validation Suite WG July 28, 2011.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting May 9, 2011.
Ensuring Conformance & Interoperability NHIN Testing Leslie Power, NHIN Testing Lead (Contractor) Office of the National Coordinator for Health IT WEDNESDAY,
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
HITPC - Information Exchange Work Group Meaningful Use Stage 3 Subgroup 2: Care Coordination and Patient and Family Engagement Co-Chairs: Jeff Donnell.
Electronic Submission of Medical Documentation (esMD)
Joint Exchange / Interop Work Group Test Workgroup Joe Lamy/Judith Hutman/Eric Heflin Sept 19, 2012.
Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012.
© 2016 California Association of Health Information Exchanges Licensed under a Creative Commons Attribution Share-Alike 3.0 LicenseCreative Commons Attribution.
Standards & Interoperability (S&I) Structured Data Capture (SDC) FHIR Profile IG SWG.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 29, 2011.
Provider Directories Tasking, Review and Mod Spec Presentation NwHIN Power Team April 17, 2014.
2015 Edition Certification NPRM Non API Group Report Out May 5, 2015 Architecture, Services, and APIs Arien Malec, co-chair David McCallie, co-chair.
Lab Results Interface Validation Suite Workgroup and Pilots Workgroup Vision, Charter, NIST Collaboration, July 8,
Public Health Reporting Initiative July 25, 2012.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
HIT Standards Committee NwHIN Power Team Dixie Baker, Chair July 20,
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011.
S&I Framework Provider Directories Initiative All Hands Meeting 09/23/11.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting July 18, 2011.
Director’s Progress Review Closeout Meeting
Director’s Progress Review Closeout Meeting
Change Request for Project Planning Centralized Electronics Records Repository (CERR) NM DoIT PCC Presentation Presented by: Pete Chacon Leo.
Next Generation Task Force
Presentation transcript:

Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012

Roll 2 NameOrganizationRepresentation Nick VanDuyneNYeC State Ivan HandlerIL John DonnellyNJTask Group Co-Chair - IWG Marty PrahlSSA Federal agency Dennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDykeVHA Kevin BradyNIST David Tao, Dan HuberSiemens EHR Vendor Dave Cassel, Rob KlootwykEpic Bill Howard, Charles ParisotGE Jeff Cunningham, Tim DunningtonICA HIE vendor Mike LaRoccaIntersystems Vladi Reznikov, Jennifer PuyenbroekCONNECT PMO Matt Bell, Tom Wilson, Kathy LinAxolotl Teddy GedamuMedfx Melissa OwensMarshfield ClinicHealth System Steve LeightyMedVirginia Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve MichaelIHIE Anuj DesaiInterop WG Eric HeflinTHSATask Group Co-Chair - Exchange Mariann YeagerExchange Ed O'Connor, Judith HutmanNitorONC Testing Contractor Dennis Wilson, Alisa Ray, Sue Rieber CCHIT ATCBs and Testing SMEs Jim St. Clair IHE USA Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs Traci Mapps SLI Global Solutions Kyle Meadors, Timothy Bennett Drummond Group Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard

Roll Call – Admin Announcements – Eric (5 mins) ‘Round-the-Room for Harmonized Specs – Eric (10 mins) Phased Approach to Harmonization for Remaining Specs – Judith/Ed (10 mins) ‘Round-the-Room for Phasing Approach – Eric (10 mins) Test Execution and Test Architecture – Ed (10-15 mins) Definition of Done – Ed (5 mins) Test Case Metrics – Ed (7 mins) Open Discussion – All Wrap Up - Eric RFP Schedule Review - Eric Agenda 3

Harmonized PRL (PD/QD/RD/MP/AF) Tests Are Drafted No objections were received and are now candidates for “done” status Future changes are possible, but will be incorporated into the next phase of test cases design and implementation We will do a ‘round-the-room next on the status RFP Has 5 respondents Bidder interviews have been conducted top few vendors Analysis is nearing completion Announcements 4

‘round-the-room Do you object to the harmonized test specifications (presented over the last few weeks) being considered final? The scope of this question is the harmonized specifications for Patient Record Lookup (aka Patient Discovery, Query for Documents, and Retrieve Documents + Messaging Platform and Authorization Framework).

Harmonization Phases Phase 1 – SOAP Send/Receive Phase 2 – Direct Send/Receive Phase 3 – Secondary Methods, Service Discovery, & Provider Directories Parent Use Cases (Done) Test Case harmonization (Done) Tests: Mess & Auth Framework (Done) Tests: Patient Discovery (XCPD, PIX, PDQ), Query for Documents, Retrieve Documents (Done) Test Execution Guides (Done) Parent Use Cases Test Case harmonization Tests: Direct Applicability Statement (Done) Tests: Direct XDM/XDR-Bridge (Done) Tests: Direct Certificate Discovery (Done) Test Execution Guide Parent Use Cases Test case harmonization Tests: Web Services Registry (Done) Tests: HPD+ Tests: Document Submission (Done) Tests: Administrative Distribution (Done) Test Execution Guides Unified Test Process – Has Been Proposed

Phase II Work Plan: Direct Test Specs BodyStatus * Parent Use Cases Done Test Case harmonization -Top-down (use case) -Bottom-up (spec based) tests In Process Tests: Direct Applicability Statement Done Tests: Direct XDM/XDR-Bridge Done Tests: Direct Certificate Discovery Done Test Execution Guide -Combine Mod Spec Phase II (messaging) -Phase III (cert discovery) documentation Not Started * More detailed status is should be posted on the Wiki

Phase III Work Plan: Secondary Specs Secondary Methods, Service Discovery, & Provider Directories BodyStatus Parent Use CasesIn Process Test case harmonizationNot Started Tests: Web Services Registry -Bottom-up (spec based) test package is complete Done Tests: HPD+ -Top-down (use case) test package is complete Not Started Tests: Document Submission -Bottom-up (spec based) test package is complete Done Tests: Administrative Distribution -Bottom-up (spec based) test package is complete Done Test Execution Guides -Doc Sub and Admin Dist draft guides exist In Process

‘round-the-room What are your thoughts about the phased approach for harmonization? Feedback is needed, especially if you or your organizations to the proposed approach.

Test Case Execution Manual: Step-by-step instructions are included in written test packages Draft tracking worksheet for execution methods What tests are the best candidates for tooling? soapUI as a component, review different uses of it Other utilities/components to research? What about the conformance checklists?

Refresh on Reference Toolkit concept Check-in on feedback to high-level Toolkit architecture Assumptions on prioritization at utility level Message simulation for High test cases in PD/QD/RD Proof of concept of lightweight orchestration (BDD layer) Integration of NIST content tools (c32 then CCDA) Ideas/volunteers for utilities, modules, or approaches? Architecture Review 11

Tracked through status (Unsorted, Untargeted, Research, in- Development, Peer Review or Pilot, Final) and Priority (High, Medium, Low, Zero) Written tests priority x ease/benefit of execution x importance of spec/functionality = Overall Priority* Test Execution Metrics 12 PDQDRDM&ADirectHPD+/ WSR Doc Sub Adm Distro EUA +MR Total High (Active/Done) 12 (5) 21 (18) 8 (4) 70* (0) 31 (19) 4 (0) 6 (0) 4 (0) 10 (0) Total Possible: Execution tracker will be fleshed out with numbers for medium/low/zero priorities and detailed methods over time

Open Discussion

RFP released — July 2nd Questions received by 6 organizations Answers distributed — July 13th Bids due — July 20th Expected award — August 15th Contract start — TBD RFP Schedule Review 14 We are here