Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
1 A Tool for System Simulation: SIMULINK Can be used for simulation of various systems: – Linear, nonlinear; Input signals can be arbitrarily generated:
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
1 Mixers  Mixers plays an important role in both the transmitter and the receiver  Mixers are used for down frequency conversion in the receiver  Mixers.
Performance of SPIROC chips in SKIROC mode
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
Beyond S-Parameters © Agilent Technologies, Inc Aerospace and Defense Symposium 2007 EuMw 2007 Agilent Workshop Page M6- 1 Hot S22 Measurements.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Collimator BPM electronics – Results from the lab, SPS and LHC
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Damping ring oscillation simulation R. Apsimon. Assumptions Synchrotron oscillation causes revolution period to oscillate around a nominal value. –This.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
Some feedbacks from DRS data analysis (very preliminary) F. Scuri - I.N.F.N Sezione di Pisa RD52 – Collaboration Meeting – Pavia, March 12, 2013 F. Scuri.
1 MGPA Linearity Mark Raymond (Dec.2004) Non-linearity measurements in the lab hardware description method results.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
DREAM December 07 BGO Data Analysis based on QADC Signals L. La Rotonda, E. Meoni, A. Policicchio, G. Susinno, T. Venturelli Calabria University & INFN.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Path Length Difference Study R. Apsimon. Assumptions Assume input signals vary sinusoidally (good approximation after BPF). Input signal arrives at a.
FONT5 digital feedback boards
Roundup of Week at ATF Mikey Davis 19 April /26.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
NanoBPM Progress January 12, 2005 Steve Smith.
Monitoring glitches in the frequency divider
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
Firmware Update 29/03/2017 Rebecca Ramjiawan.
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
Revised ATF Shift Plans
Phase Monitor Electronics: Output vs
Analysis of Oct. 04 Test Beam RPC Data
Status of Phase Feedforward Tests
EMCal Recalibration Check
Problems with the Run4 Preliminary Phi->KK Analysis
T2K Run8 MUMON Summary.
Presentation transcript:

Calibration summary Nov-Dec 09 R Apsimon

10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information to be had from this data, no point putting up the calibration plots P1P2P3 Cal e e e-3 Cal e e e-3

19 Nov 09 FONT5 board sent off to UK for repairs, so using the FONT4 boards. P3 has a broken strip and so the data for this was unusable and therefore not shown.

3 procs on 3 BPMs single-bunch

P1 3-bunch mode

P2 3-bunch mode

Summary P1P2 Single-bunch2.4739e e-3 3-bunch2.2339e e e e e e-3

03 Dec 09 Strange nominal optics this week. Due to malfunction lattice file also not saved by control system. Running with 3 processors on 3 BPMs in 3-bunch mode for this shift.

P1

P2

P3

Summary P1P2P3 3-bunch2.7237e e e e e e e e e-3

11 Dec 09 Using Machine LO, but it was jumping around a lot, causing the sampling to jump. Still trying to analyse the data from this set, but very difficult to remove the pulses sampled off-peak. How much time is worth devoting to ana

17 Dec 09 FONT5, 4 processors on 3 BPMs. P2x and P2y for comparison. ZV6X for y-cal, ZH4X for x-cal. P2x channels were not sampling on peak and are on different ADC clocks, so the calibration constant is only approximate.

Y-calibration

P1 y calibration

P2 y calibration

P3 y calibration Haven’t yet investigated why this constant is so low.

Analysis on P2x Assumptions: –Sum and Diff signals gaussian within ±2.8ns –Sigma ~ 2.8ns Method –Add point either side of peak. This value approx. peak value within 1 sigma, maximum error ~ ±25%

Sum of points either side of peak

Gauss fit to sum signal

Estimation of peak position Using the assumptions stated earlier, can estimate how far the sample is off peak. –Won’t bore you with the maths… On diff peak, the line is very ratty at first, this is because the quadrature component makes the apparent position of the peak change, so method not reliable in this region.

Estimated peak position

Calibration constant Integrating across pulse, so calibration constant should tend to not as it does if sampling the peak. Taking into account the estimated peak positions and my peak value estimation, this constant will be multiplied by 1.128/1.262=0.894, which will give a “theoretical” calibration constant of

P2x calibration This calibration is in good agreement with the “theoretical” value

Enlarged diff for P2x, bunch1 Note the top 3 positions appear to have a peak about midway between the 2 samples and the lower 3 positions’ peaks are varying due to the quad component

Enlarged sum for P2x, bunch1 Note the sum pulses are much closer to being on peak and all the pulses appear to be the same shape, implying the same peak

Bench test results LO at 14dBm, input: 650Mhz sine wave at 0dBm, split 2 ways with 1dB attenuation on arm into input A, no attenuation on arm into input B. Also displaying results from previous bench test

Bench test results 7dBm LO 650MHz input 14dBm LO 650MHz input 14dBm LO 700MHz input Proc 1Diff out26.6mV29.9mV44.3mV Sum Q5.38mV5.94mV7.98mV Sum I5.18mV5.94mV8.28mV Proc 3Diff out23.9mV26.96mV38.3mV Sum Q5.38mV6.08mV8.34mV Sum I5.18mV6.00mV8.70mV