L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results At IPHC MS, XS, LG.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
SSD Tasks and Costs Howard Matis October 14,
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
1 FTK Rear Transition Module Mircea Bogdan The University of Chicago March 9, 2015 Production Readiness Review.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HFT face-2-face F.Videbaek Brookhaven National Lab.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
MS IPHC-LBL phone meeting, July 10, Ladder Testing at IPHC and LBL.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
PXL timing There are two asynchronous systems. STAR PXL RDO L0 trigger L0 detectors Physics collision Trigger processing TCD distribution 1.5 us TBD RDO.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Face to Face Meeting – March 2012 Sarah Morgan
10/month is the present production rate 2 FTE + sporadic contributions
QXF schedule and milestones
Presentation transcript:

L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing

L. Greiner2IPHC-LBNL Phone Conference 05/2012 STAR Topics Two power bus cable design and status Power regulator testing cable design and status Ladder testing results post IPHC visit (MS) General project progress. Discussion

L. Greiner3IPHC-LBNL Phone Conference 05/2012 STAR Two power bus cable design Design and layout are complete. Gerbers have been sent to Rui at CERN PBC shop. LBNL PO has been placed. Waiting on delivery date.

L. Greiner4IPHC-LBNL Phone Conference 05/2012 STAR Two power bus cable design (cont) Outer and Inner driver board design and layout complete. Outer driver board has been sent for fabrication (10 pieces) to CERN PCB shop.

L. Greiner5IPHC-LBNL Phone Conference 05/2012 STAR Power Regulator Test Cable Power regulator cable test schematic is complete. Power regulator cable layout is underway. We will be producing these PCBs locally, not in the CERN PCB shop.

L. Greiner6IPHC-LBNL Phone Conference 05/2012 STAR PXL Project News Preparation for DOE yearly review at BNL in July Primarily a project progress review with significant technical content. A set of documentation for the PXL detector CD-2/3 is available at Additional documentation for this review will be posted soon. New Virtex-6 based RDO motherboards. Design is complete and testing has finished 3 PCB architecture, new connectors, cables, 9U VME physical format. Full complement of 10 assembled boards have been ordered for the prototype run RDO. Expected delivery in 3 weeks. Significant Progress in mechanical structures. See pictures next slide

L. Greiner7IPHC-LBNL Phone Conference 05/2012 STAR Hardware progress

L. Greiner8IPHC-LBNL Phone Conference 05/2012 STAR Discussion Topics Ladder testing results. Implications of instability in thresholds and noise. Any other suggested testing? Are these effects understandable through the analysis of the sensor design? Ultimate 2 submission schedule. Monthly phone conferences – propose a schedule. (2 nd Tuesday of every month?) Please check your recurring meetings)