Topics for discussion WWFPC01, CERN, Geneva, 23-24 June 2015.

Slides:



Advertisements
Similar presentations
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
Eric Montesinos Challenges in
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UKNF RF: Status Cockcroft Institute (Dept. Engineering, Lancaster University, UK) January.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Fundamental Power Coupler at CERN WWFPC01, CERN, Geneva, June 2015.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
RF surface aspects at power couplers Wolf-Dietrich Möller Fundamental Power Coupler Workshop June 23 – 24, 2015, CERN, Geneva.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1.3GHz Input Coupler for ILC
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Manufacturing process, validation and factory test
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra.
LIU-SPS RF Power upgrade | 09 December 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
CERN SPL Fundamental Power Coupler Progress report SLHiPP-4 meeting, 2014, CERN, Geneva Eric Montesinos, CERN-RF SLHiPP-4, May, CERN, Geneva Eric.
AMICI WP5.2: Harmonization - Material and Component Reference
WP5 Elliptical cavities
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
T5.2: Harmonization - Material and Component Reference
Complementary ISTC Projects #3888, 3889p
FCC R&D WP5 Cavity Fabrication Status May 2017 M
TTC - JLab - Bob Laxdal - TRIUMF
FPC & HPRF status Couplers mounting (FPC, HOMS & FA)
Hosting Orsay Walid KAABI
World-Wide Fundamental Power Coupler meeting #3
Manufacturing of the IFMIF series power couplers
FKPPL and FJPPL Joint Workshop
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
HIE-LINAC status report
Nick Walker (DESY) EU GDE Meeting Oxford
Performance Recovery at CEBAF
European Coordination for Accelerator Research & Development
V. Veshcherevich Cornell University
World-Wide Fundamental Power Coupler meeting #5
Presentation transcript:

Topics for discussion WWFPC01, CERN, Geneva, June 2015

WWFPC 2016 meeting date WWFPC01, CERN, Geneva, June Yearlu meeting hosted at CERN June hour per talk including discussion ! 2 days Tuesday-Wednesday (+ visit 0.5 day) Mandatory to be present the 2 days No remote participation Discussion oriented Exchange of detailed information between experts only (SRF + NRF) On invitation only, max 20 participants, round table discussion

List of invitees for WWFPC 2016 meeting WWFPC01, CERN, Geneva, June LabName CERNEric Montesinos KEKEiji Kako DESYWolf-Dietrich Möller CEAGuillaume Devanz BNLSergey Belomestnykh SLACChris Adolphsen ORNLMark Champion JLABRobert Rimmer FNALSergey Kazakov CornellVadim Veshcherevich IPNOSebastien Bousson LALWalid Kaabi IHEPChina IBSKorea ANLMike Kelly LabName

Topics for discussion Design ◦maximum power per coupler ? ◦multi coupler per cavity ? Construction ◦choice of material and of techniques of fabrication ◦Coating ◦Is superficial oxidation/discoloration a problem ? (*** identification Walid) Ceramic ◦Ceramic ? ◦Sputtering: TiOx – TiN ? Control of the process ? Qualification (*** Sergio/Fritz) ◦New ceramic without treatment ? (KEK/CERN) ◦Gray deposit ? How to qualify ? (*** Sergio/Fritz – Wolf-Dietrich - Walid) Series production ◦fabrication, cleaning, handling and assembly ◦Series production by industrials: modification of the processes, industrial alternative proposals,... WWFPC01, CERN, Geneva, June

Topics for discussion Cleaning and assembly ◦What clean room is really needed ? ◦For FPC alone? ◦For FPC onto cavity? ◦How to test the effect of cleanliness ? ◦Definition of a cleanliness test programme ? Specific constraints for operation reasons ◦NO brazing-welding-soldering between liquid coolant and vacuum (proven EBW should not be on the list) ◦NO liquid cooled couplers ◦Do you have the same constraints ? ◦Do you have statistics linked to these constraints ? WWFPC01, CERN, Geneva, June

Topics for discussion Tests ◦RF test boxes ◦Amplifiers for tests ◦Prototype processes versus series processes ◦What margin do we need between pre-series and series ? ◦Do we need vacuum gauge for series production FPC ? Diagnostics ◦R&D and prototyping ◦Operation in accelerators Statistics ◦Couplers operated in accelerators ◦Degradation of characteristic over time of operation ◦How to share these information ? WWFPC01, CERN, Geneva, June

World Wide Program ? How to organise it ? Who can do what ? Who want to do what ? WWFPC01, CERN, Geneva, June