Project Review P09711- Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME), Chukwuma.

Slides:



Advertisements
Similar presentations
Design Brief Example Your Name Here This is similar to what we use on the Cisco.com team.
Advertisements

A Systems Approach To Training
Requirements Specification and Management
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Guide to data collection A look at why now… and why us.
ONIT Consulting LLC Who’s on your project? Q9 Initiative Presented by: Anna Gabara.
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
SAMPLE THE MANAGER’S COMMUNICATION HANDBOOK A Practical Guide to Build Understanding, Support, and Acceptance WELCOME!
Modeling the Process and Life Cycle CSCI 411 Advanced Database and Project Management Monday, February 2, 2015.
Mission Statement: The aim of this project is to improve the meat marinade tumbler transport in the Wegmans Culinary Innovation Center. Currently, meat.
WASTE AUDITING 101. What Direction Are You Going?
Steps, Tools, and Techniques
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen.
Manufacturing Work Cell Redesign for Sentry Group of Rochester (02001) Kyle HagadornJacob Feldman Julie AllenChris Isaacson Carolyn StrockErik Tracy.
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
Overview of Phase 4 Performance Validation Methods and Techniques.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
Team Members: Brian Barnes Jason Featherman Matt DeWitt Chris Blanchard.
Just-In-Time “Eliminate Waste”.
EDGE™ Systems Level Design Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME),
EDGE™ Detailed Design Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
EDGE™ Project Overview Presentation P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME),
Palletizing the Easy Way
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
S/W Project Management
There are three types of specification
Systems Analysis And Design © Systems Analysis And Design © V. Rajaraman MODULE 14 CASE TOOLS Learning Units 14.1 CASE tools and their importance 14.2.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Understanding Information Systems. Information System (IS) An IS is a combination of people, hardware, software, computer networks, and data that organizations.
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
Wegmans: Flip-Label Project Team Members: Brandon Sbordone (ME), George Kilger (EE), Ben Bouffard (EE), Ian Baker (ME), Charlie Nicolosi (ME), Helen Jervey.
ERP IMPLEMENTATION LIFE CYCLE KASHIF SHAMIM. Enterprise resource planning ERP covers the technique and concepts employed for the integrated management.
Scanner Run Jared Wilkin Chris Good. A Children’s Game.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Webster Visualize Webster Financial Team Visual Scrumware Joe Andrusyszyn Mark Bryant Brian Hannan Robert Songer.
Macintosh Print Controller Team SDMay03-08Advisor Dr. James Davis Abstract The Macintosh Print Controller project attempts to solve a process productivity.
Unit 2- Assignment 1 P1, P2, M2 BTEC Level 3 Business.
Abstract Introduction Project Requirements End Product Description Proposed Technical Approach Approach and Considerations Team Members: Travis Djuren.
Systems Life Cycle A2 Module Heathcote Ch.38.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Testing Considerations Because of potential life threatening consequences resulting from device malfunction, it is critical that the device be fully tested.
Nameplate Inspection System May03-07 Team MemberEstimated Effort Ben Weatherman175 hours Jacob Powell175 hours Paul Slifka185 hours Dejan Leginovic190.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
Artificial Intelligence in the Robotic Industry By Dalia Elzeny Jason Renaud.
Answering the Edexcel Medicine Paper 14 th June 2011.
TTI Performance Evaluation Training. Agenda F Brief Introduction of Performance Management Model F TTI Annual Performance Review Online Module.
第 11 組 MIS 報告. Phases of any information system ~ recognition of a business problem or opportunity ~ recognition of a business problem or opportunity.
1 visit: New Product Development Strategy.
New Product Development Strategy. Key Steps in New Product Development.
Lecture 1: Introduction – Graduation Projects Topics to Discuss in Lectures 1. Project Deliverables 2. Course grading 3. Project Concept Writing.
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
The Big Hand-Off Learning Objects are now handed off Ali Green April 5, 2010.
MM IDEADEVELOPMENTLAUNCH QMM IDEAResources CEOCONCEPTDEVELOPMENTLAUNCHFINIDEACONCEPTCEODEVELOPMENTLAUNCHCEOIDEACONCEPTDEVELOPMENTLAUNCHQMMIDEADEVELOPMENTCONCEPTLAUNCHQMMIDEACEOCONCEPTLAUNCHQMMIDEADEVELOPMENTLAUNCHQMMIDEAResources.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.
1 Week 5 Software Engineering Fall Term 2015 Marymount University School of Business Administration Professor Suydam.
Wegmans Swirl Cake Automation
Activity Development Process
Component Functionality
Chapter 13: Systems Analysis and Design
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Presentation transcript:

Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME), Chukwuma Morah (IE), Brian Duffy (EE), Benjamin Powell (EE)

Project Overview Project Description: Wegmans bakes and packages all of their mini cookies at their bakeshop located here in Rochester on Brookes Avenue. Currently the packaging is done by six or seven people standing around a conveyor and pull the cookies into the clam-shell packages. The mini-cookie package calls for 397 grams worth of cookies but employees sometimes package up to 450 grams. This project will look into building an automated prototype that will separate the cookies into the correct amount by weight, which the employees can then package.

Economic Potential

High Level Customer Needs Must separate mini-chocolate chip cookies by weight Must reduce the amount of excess mini- cookies in package Must not substantially slow down process Must not be considered a capital investment Weight of cookie package Creates clear separation of product for packaging Percentage of packages with excess (2 or more) cookies (currently at 95%) Throughput Cost Key Target Metrics More needs and metrics were developed but it was decided that these would be the focus of the prototype.

Proposed Prototype Design Sifting Bar: Need 4.2 Metric 7 Push-Rod: Metric 6 Weigh Station: Need 1.1 & 2 Metric 1 & 2

Final Prototype System Design

Documentation for Implementation List of Normal & Abnormal Conditions Start Up Checklist List of Questions for Developing a Maintenance Plan Visuals Design for Pulling Stick These can be used as a basis for creating documentation for the implementation of the final prototype concept.

Results and Conclusions Move cookies into line  Re-designed funnel system  Eliminated the need for the sifter bar Move cookies onto weigh station  Flow down drop chute  Height and angle of drop chute Accurately weigh cookies  Scales were accurate within 1 gram  Drop chute accurately rotated Move cookies off of scale  Push rod moved groups off of scale quick enough

Results and Conclusions MetricMarginal TargetIdeal TargetOur Result Weight of Cookies422 +/- 5 grams397 +/- 5 gramsAverage of 409 grams % with Excess Cookies (for a fully implemented system) 60%0% 20% (still have packages with 2 extra cookies ≈ 25 grams) Throughput Full System: /-2.5% Prototype: 375 +/ 2.5% 6.25 packages per minute Full System: /- 2.5% Prototype: 425 +/- 2.5% 7.1 packages per minute 6.5 packages per minute Clear SeparationYes Cost of Prototype< $10,000< $5,000

Future Work Scale interface should be switched to Ethernet Improve user interface by adding speakers, screen, mouse and gui interface Alarm and lights for safety Training manual Full creation of the pulling stick design With knowledge of full implementation materials, a maintenance plan can be developed

Acknowledgements We would like to acknowledge all of the people who have helped with this project: Scott Young and Chris Isaacson, for all of their support they provided us with during the creation of this project Professor John Kaemmerlen and Phil Bryan, for all of the guidance and advice they provided throughout the entire process from design to creation Dr. Christopher Hoople, for all his help during the design stages of the project and presence at our design reviews All the Wegmans employees who allowed us to observe them doing their job on the cookie line