Structured / Unstructured Market Trials Bi-Weekly Update – Friday Meeting June 28, 2013.

Slides:



Advertisements
Similar presentations
Extended Connectivity Test Overview May 16 th, 2013.
Advertisements

IDT Prep 01/24/2014. Announcement IDT 1/21 Preliminary Debrief Presentation on spp.org updated with Regulation Pre-selection data and graphs.
Resource Offer Commitment Parameters Structured Market Trials August 23, 2013 Gay Anthony SPP Market Design.
Midwest ISO Market Readiness Update October 27, 2004.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
March 4, 2008 TPTF CRR EDS (Release 7) Update. 2 2 TPTFMarch 4, 2008 Release CRR EDS 3 Release 7.1 Exit Criteria% CompleteComments Active market.
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 19, 2010.
22 May 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Congestion Revenue Rights Market Trials Call 2 APRIL 2010.
Congestion Revenue Rights Market Trials Call 19 March, 2010.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 2, 2013.
Market Trials Weekly Update – Friday Meeting December 6, 2013.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting July 19, 2013.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting January 17, 2014.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting September 27, 2013.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013.
May 22, 2008 TPTF Texas Nodal Market Implementation Program Update Raj Chudgar.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 4, 2013.
Integrated Marketplace: Parallel Operations CWG – January 2014.
Structured / Unstructured Market Trials Bi-Weekly Update – Friday Meeting June 21, 2013.
Preliminary IDT Debrief 02/26/ Deployment Test Debrief Overall the Fourteenth Deployment test was a great success All of the BAs.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting July 26, 2013.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 16, 2007.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 30, 2013.
Integrated Marketplace MUI Technical Specifications February 17, 2012.
Structured / Unstructured Market Trials Kick-Off Meeting May 31, 2013.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
Market Trials Weekly Update – Friday Meeting November 8, 2013.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 Market Trials Update NATF May 4, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting September 20, 2013.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting December 20, 2013.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting November 1, 2013.
Readiness Liaison Update Erin Jester September 26, 2013.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 11, 2013.
June 9 th, 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
Market Release 1.17 MP Testing Kick-Off January 5,
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Congestion Revenue Rights Market Trials Call 9 April, 2010.
1 Market Trials Update NATF January 5, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 23, 2013.
Market Trials Structured/Unstruc tured Test Overview December 14, 2012 Casey Cathey ·
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting August 9, 2013.
Structured / Unstructured Market Trials Weekly Update – Friday Meeting September 13, 2013.
Market Trials Update NATF March 2,
Presentation transcript:

Structured / Unstructured Market Trials Bi-Weekly Update – Friday Meeting June 28, 2013

Agenda Structured Market Trials Daily Calendar: July 1 – July 7 Scenarios Scheduled: No Scenarios Scheduled Unstructured Test Days: Tues July 2 & Weds July 3 July 8-14 Look-Ahead: 13.0 – Demand Response Release Scorecard Migration Report Known Issues Log Unstructured Testing Extended Connectivity Testing Update – Brett Crane 2

Outstanding Questions None 3 Ginny Watson

Review of Events: June 24 – June 28 Monday June 24, 3-6P CPT: Markets Release installed successfully Installing the release turned on the creation of test data that overwrote MP submitted data for the next 7 days Tuesday June 25: Data Reset for Day-Ahead and Real-Time MPs required to re-submit bids and resource offers Wednesday June 26 SPP worked with MPs that requested assistance to copy data forward 4 Gary Cate

Calendar Reminders 5  July 1 – July 7 July 1 – July 7  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder  Official Operating Days – Tuesday July 2 & Wednesday July 3  SPP will support questions concerning studies run during that day  Activity specified by SMT Daily Calendar – Base Case Scenarios, Unstructured testing based on MP offers  Friday Maintenance  Member-impacting maintenance will happen on Friday afternoons  24-hour notice if member impacts are expected  Saturday - Reserved for MP Testing  SPP will not override offer data  Studies will be run, system permitting Ginny Watson

Unstructured Testing Tips 6 Types of Items MPs Should Test: DA Market Self commit during an operating day Self commit resources in the DA Market based on the MPs EIS resource plan (especially when settlements is available to see the interaction between DA Market and Real Time) Vary startup & no load costs on a resource to see the impact on clearing Vary resource prices to see impact on clearing Vary offer curve prices and slope to see impact on clearing Submit price sensitive demand bids commensurate with unit offer prices and overall P&L Submit virtual bids/offers at different pnodes, utilizing tiered offers Vary different commitment parameters and analyze results Max Daily Energy, Max Daily Starts, etc. Change Offers for Reserve Products Price Status Alan Adams

Unstructured Testing Tips 7 Types of Items MPs Should Test: RUC Vary different commitment parameters and analyze results Max Daily Energy, Max Daily Starts, Etc Change Commitment Status Reliability, Market, Outage, Self RT Market Change resource offers for limits, ramp rates during the day to observe the effects on defects Try various offers that include fixed and market offers Vary reserve offers and ramp rates on different resources to see the effects on clearing Observe behavior of units when submitting different unit status’ between the markets (ex: DA Market = Self, RT Market = Market) Alan Adams

Unstructured Testing Tips 8 Types of Items MPs Should Test: RTGEN Integration with RTGEN startup and shutdown sequence – managing control mode 1. Control mode of 0 when offline 2. Control mode of 3 when ramping to min 3. Control mode of 1 or 2 when on and dispatchable 4. Reverse this when coming offline Change control modes for resources to see the effects on dispatch i.e. set control mode to 0 for a resource that is online, set control mode to 1 for a resource that is clearing regulation, etc.) Alan Adams

Unstructured Testing Tips 9 Types of Items MPs Should Test: Once CROW is integrated: Try to submit offers in the DA Market for resources that are outaged Once RTOSS is integrated: Enter in Dispatchable/Up to TUC transactions with very low prices to verify they clear if they are in the money Enter in Dispatchable/Up to TUC transactions with very high prices to verify they do not clear if they are out of the money Settlements: All kinds of changes and options Virtual bids vs. price –sensitive demand bid, URD, trigger other charge types Unstructured Testing Tips Unstructured Testing Tips posted on spp.org  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Alan Adams

13.0 – Demand Response  Look-Ahead July 8-14:  13.0 – Demand Response on Thursday July 11 (Only Relevant to 1 MP) 1.1 Scenario Description Verify functionality specific to DDRs DDRs and BDRS achieve their response through reduction of the effective load. 1.2 Expected Results DDR Dispatch and Contingency Reserve Clearing DDR Regulation Demand Response Load (DRL) Submitted Option DDRs submit real-time production MW 2.0 MP Activities Verify DDRs have valid offer data for all products. Ensure required real-time measurements are defined and being submitted Submit hourly DRL forecasts when required Verify that Dispatch Instructions are received via XML 10 Alan Adams

Tips and Guidelines 11  SMT Tips and Guidelines posted on spp.org SMT Tips and Guidelines  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Information included: Mitigated Offers Even though we are not yet testing Mitigation functionality, SPP does still want MPs to submit mitigated offers. Resource Parameter Submission Guidelines Maximum Daily Energy, Maximum Run Time, Minimum Down Time, etc. Operating Reserve Fixed Dispatch MW Submissions MPs using the Fixed Dispatch Status for their OR Offers need to make sure the Fixed MW value they are submitting is reasonable Ginny Watson

Release Scorecard 12 Release Scorecard –Find the Release Scorecard on spp.org:  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Ginny Watson

Migration Report 13 Migration Report –Find the Migration Report on spp.org:  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Wendy Reynolds

Known Issues Log 14 Market Trials Known Issues Log –Find the Known Issues Log on spp.org:  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Carrie Simpson

Proposed Restructure: Overview 15  SMT Call would be held once per week on Fridays 9-10:30A (as of 7/12)  Look-Ahead: in-depth review of upcoming scenarios  Discussion of Known Issues and Releases  Results: presentation of Analysis one week in arrears  Only statistics relevant to the Analysis would be presented  Statistics for Operating Days posted daily, by EOD the day following the OD  Ex: Statistics for July 2 OD will be posted by EOD July 3  Analysis of ODs posted by EOD on the following Tuesday  Ex: Analysis of July 2 & July 3 ODs will be posted by EOD Tues, July 9  Reasons for Restructure:  Gives SPP more time to provide quality Analysis  Gives MPs more time to review Data & Analysis prior to discussion  Opportunity to improve quality of MP questions during weekly calls  Creates a more efficient & convenient meeting schedule (one call per week) Ginny Watson

Proposed Restructure: July Schedule 16  Monday, July 1: SMT Results Call (no change)  Friday, July 5: No SMT Call (holiday)  Monday, July 8: TCR Call  Friday, July 12 (9-10:30A): New SMT Results & Look-Ahead Call  Statistics posted daily as of July 3  Statistics for July 2 OD posted by EOD July 3  Statistics for July 3 OD posted by EOD July 5 (holiday)  Analysis posted by EOD Tuesday, July 9 Ginny Watson

SPP Hotline Reminder 17 SPP Hotline: Critical and High Issues Phone Number: Monday – Friday, 8:00 am – 5:00 PM Critical Issue: one or more systems, or a function within a system, are rendered inaccessible or stop functioning all together An example of a critical issue is: "An MP cannot update RTBM offers for the current Operating Day." High Issue: One or more key functions within a system are non- operational, or a severe error exists in its processing, and there is no workaround Call the hotline when “stuck” (cannot move forward without help) Examples: data submission issue, real-time ICCP issues, etc. Ginny Watson

Market Trials Useful Documentation Integrated Marketplace Market Trials Project Documentation Folder Find useful documentation on spp.org:  spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Market Trials Daily Calendar Market Trials Daily Calendar SMT Tips and Guidelines Unstructured Tips Release Scorecard Change Tracker Market Trials Known Issues Log Migration Report Structured Market Trials Scenarios Market Participant Guide 18 Ginny Watson

Scheduled Scenarios 19  July 1 – July 7  No scenarios scheduled  Unstructured Test Days: Tues July 2 & Weds July 3  July 8 – July 14  13.0 – Demand Response  July 15 – July 21  23.1 – Spring Load Profile  23.2 – Spring Load Profile  25.1 – Fall Load Profile  25.2 – Fall Load Profile Ginny Watson

Extended Connectivity Test Execution Week #2 MPs who Perform Extended Connectivity Testing June 10 th – June 14 th. –Cargill Power Markets LLC (Complete) –Noble Americas Gas & Power Corp (Complete) –Cimarron Wind Energy, LRR (Complete) –Rainbow Energy Marketing Corporation (Complete) –City of Chanute (Complete) –Shell Energy North America (US) LP (Complete) –Exelon Generation Company LLC (In Progress) –Twin Eagle Resource Management, LLC (No Checklist: Can Not Participate) –Enel Green Power North America, INC (No Checklist: Can Not Participate) –JP Morgan Ventures Energy Corp(No Checklist: Can Not Participate) –Trademark Merchant Energy, LLC (No Checklist: Can Not Participate) –Buffalo Dunes Wind Project(No Checklist: Can Not Participate) –Solomon Fork Wind Farm LLC (No Checklist: Can Not Participate) 20

Extended Connectivity Test Execution Week #3 MPs Scheduled to Perform Extended Connectivity Testing June 17 th – June 21 st. Results due Friday 6/21 –AEP Energy Partners (Complete) –Edison Mission Marketing & Trading (Complete) –Otter Tail Power Company (In Progress) –Carpe Diem Trading II, LLC (In Progress) –ETC Endure Energy (Not Tested) –Tennessee Valley Authority (Not Tested) –Blue Canyon V (No Checklist: Can Not Participate) –Wind Farm Bear Creek LLC (No Checklist: Can Not Participate) –Citigroup Energy INC (No Checklist: Can Not Participate) –Denver Energy, LLC (No Checklist: Can Not Participate) –Infinity Wind Holdings, LLC (No Checklist: Can Not Participate) –Transalta Energy Marketing [US] INC (No Checklist: Can Not Participate) –Conoco Phillips Company (No Checklist: Can Not Participate) –DB Energy Trading(DBET) (No Checklist: Can Not Participate) –EDP Renewable North America LLC (Formerly Horizon Wind Energy LLC (No Checklist: Can Not Participate) 21

Extended Connectivity Test Execution Week #4 MPs Scheduled to Perform Extended Connectivity Testing June 24 th – June 28 th. Results due Friday 6/28 –Galt Power INC (In Progress) –MET Southwest Trading LLC (In Progress) –Dempsey Ridge Wind Farm, LLC (Not Tested) –Macquire Energy LLC (Not Tested) –Midwest Energy Trading East LLC (MET1) (No Checklist: Can Not Participate) –Monterey SW, LLC (No Checklist: Can Not Participate) –Monterey SWF, LLC (No Checklist: Can Not Participate) –Saracen Energy West (No Checklist: Can Not Participate) –Union Electric Company DBA Ameren Missouri (No Checklist: Can Not Participate) –Utilities Plus (No Checklist: Can Not Participate) –Wind Farm 66 LLC(No Checklist: Can Not Participate) –XO Energy SW, LP (No Checklist: Can Not Participate) –XO Energy SW2, LP(No Checklist: Can Not Participate) 22