TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration.

Slides:



Advertisements
Similar presentations
Sprinkler Systems and Standpipe Operations
Advertisements

Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
Learning Objective 1 Describe the safety considerations taken when service testing a fire hose.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
FIRE Safety Solutions Dr. Pulak De FIGHT FIRE WITH KNOWLEDGE.
Automatic Nozzles. 1960’s & 70’s  Automatic pressure regulating nozzles invented 1960’s & 70’s  Automatic pressure regulating nozzles invented Hand.
Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014.
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
Lec 17, Supply Analysis Part 1: Role of supply analysis (ch7.1) and Analysis of system performance (ch7.2) The role of performance analysis in transportation.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Princeton University Prospect Eleven Dec. 6, 2005 Towards Real-Time MinETA Routing Tuesday, December 6, 2005 RPI, Troy, NY Alain L. Kornhauser Professor,
S Siemens Building Technologies Fire Safety 1 Fire Safety Concept for Tunnels Dublin, May 6th 2004 Customized Fire Safety Concept for Underground Transportation.
Automatic Sprinkler Systems
LNG Hazards.
Fighting Transportation Myths with Reality Since 2011, Gov. Rick Snyder has called on the Michigan Legislature to dramatically reform Michigan transportation.
Water Handling Operations
Unit 8: Portable Fire Extinguishers & Smoke Control Management Systems
Technology in Architecture Lecture 12 Electrical Equipment Electrical Power Management Fire Protection Systems Lecture 12 Electrical Equipment Electrical.
Fire Department Hydraulics
1402 Hybrid Firefighter II 6th Edition Chapter 15 — Fire Hose South Carolina Fire Academy.
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
VIKING Workshop – Hamburg, DE, March 2007 Best Practices in Monitoring Deployment, Hamburg, Germany Innovation in Monitoring VIKING Workshop “Best.
UTILIZATION OF VISIBILITY MONITORING FOR FIRE DETECTION.
Paper Review: AmI Technology Helps To Sustain Speed While Merging A Data Driven Simulation Study on Madrid Motorway Ring M30.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
THE Reference in Traffic Video Detection Benjamin Schiereck, Sales Manger Traficon Germany Improving road and tunnel safety via incident management: implementing.
PIPENET TM - Leading the Way in Fluid Flow Analysis SUNRISE SYSTEMS LIMITED Flint Bridge Business Centre Ely Road Waterbeach Cambridge CB5 9QZ United Kingdom.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
“The process of moving an item from point A to point B.” “Safe, efficient, reliable, and sustainable movement of persons and goods over time and space”
See the Motorcycle? A picture is worth a thousand words. The Honda rider was traveling at such a "very high speed", his reaction time was not sufficient.
 CS 5380 Software Engineering Chapter 11 Dependability and Security.
1 20 January 2006 Swedish Road Administration First impressions of congestion charging in Stockholm Jenny Källström, Analysis and Society division  Background.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
Ultra Sonic 2001 OHD Touch Free Car Wash RYKO Manufacturing Company.
The Challenges of Urbanization  Urban Opportunities  Urban Problems  Reformers Mobilize.
1 FASAN – Improved use of systems for traffic information in case of incidents Anders Lindkvist Movea Trafikkonsult.
Wu. Y., International Conference on Hydrogen Safety, September Initial Assessment of the Impact of Jet Flame Hazard From Hydrogen Cars In.
The Challenges of Urbanization
2 DGS-SEE SEMINAR ON FIRE PROTECTION FOR PHYSICS RESEARCH FACILITIES OCTOBER 2015 CERN FIRE SIMULATIONS IN THE PS ACCELERATOR TUNNEL TO DEFINE A.
Partnership for Road Safety Foundation Eka Laliashvili Deputy Director Georgia Alliance for Safe Roads.
Materials Management Systems
11DSCI4743 Physical Distribution Definition Physical distribution is the movement & storage of finished goods from the end of production to the customer.
Making the Case with Public Officials. Do We Have To? Most public officials are used to dealing with capital improvements, not operational improvements.
Recent and future research for the fire safety of hydrogen-fueled vehicles in JARI Appearance of Hy-SEF.
The overarching goal of Swedish transport policy is to ensure a socio-economically efficient transport provision, sustainable over the long.
Purpose of Water Test Purpose of Water Test is to evaluate protection performance against the electric shock of vehicle in normal operation. Requirements.
CPNZ Basic Training 011 – Vehicle Accident ‘Crash Plan’
EASY SOLUTIONS ENTERPRISES NO PUNCTURE WE FIX PUNCTURE, BEFORE IT HAPPENS Introduces.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Corporate Learning Center The AES group of companies in Kazakhstan.
LAGUNA-LBNO at Fréjus General Meeting June 2013, Geneva Giovanni Como, Francesco Amberg, Daniele Bronzetti 1.
Automatic Fire Sprinkler Systems A Comprehensive Approach to Performance and Reliability Paris Stavrianidis General Manager FM Approvals.
Performance Car Wash Systems wants to be your supplier of automatic tunnel equipment whether the requirements are small or large. We will earn your respect.
Top Five Reasons Southern California Businesses Need WaterFix
CH 6.6 Air Powered Tools.
Self-expanding foam system
News from Integration WG
Essentials of Fire Fighting
Installation XFEL Tunnel WP 34
Top Five Reasons Southern California Businesses Need WaterFix
The Stockholm Bypass Johan Asplund, PRti
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
Hong Kong-Zhuhai-Macau Bridge
Workshop on fire protection for physics research facilities
North Area Safety Review 2019
Risk Management Student Powerpoint
Physical Distribution Definition
Presentation transcript:

TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration

2

3

4 Northern Link: Part of ring road project 3,5 km long, in all 15 km of tunnels

5

6 Basic fire safety concept: Free flow traffic

7

8 Fresh air

9 2004: Southern Link opens for traffic: vehicles /day, estimated = Slow traffic

: The tunnel closing when cogestion occurs.

The safety concept of the Northen Link is uppdated in four aspects: Improved detection Improved traffic controll and management Improved message handling to users Fixed Fire Fighting System

12 Fixed Fire Fighting System in the Northern Link: Safety, not asset protection No traditional tunnel sprinkler Focus on cost effectivenes, robustnes and mantainability

13 Design solutions: Long sections (75 m) Low pressure, large droplets Extended coverage nozzles City water supply, no pumps Remtotely operated membrane valves Starts automatically at 90 C in heatdetection cable Protected against corrosion and freezing

14 FFFS in the project Northern link

15

16

17

18

19

20

21

22

23

24

25 General data: Number of sections: 230 Total length: ca 15 km Investment cost: 72 Msek (7 M€) Investment cost per km: 5 Msek (0,5 M€) Experiences since nov 2014: No fires No false activations 100% availability 100% reliability (test once a year) No service or repairs required

26 Tests conducted in cooperation with SP Water distribution tests at different air speeds Visibility in a activated section Visibility from a moving car in a activated section Test of evacuation by foot through a activated section Fire tests: risk of fire spread between vehicles, 6 MW propan flame Activation in winter conditions (- 6 grader C)