API 11V Task Group 15 November, 2007 Houston, USA.

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,
Advertisements

February 5 & 6, Spring Gas-Lift Workshop Spring ASME/API Gas-Lift Workshop Proposed New API RP 11V10 Recommended Practice for Operation,
ISO ESP Systems Task Group Leader, Shauna Noonan
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
API GAS LIFT TASK GROUP CHAIR - JIM BENNETT EXXONMOBIL.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
API Subcommittee 17 Industry Standards for Subsea Equipment
Committee on Refinery Equipment 2007 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition Petroleum and natural gas industries — Well integrity for the operational phase.
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
Gas Lift Design Philosophy for Chevron’s Subsea Developments
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
2002 Spring ASME/API Gas-Lift Workshop
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
Spring 2002 ASME/API Gas-Lift Workshop General Layout of Workshop and Call for Papers/Presentations General Instructions The workshop will be held at the.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Copyright 2001 SIEP B.V. Online Analysis of Continuous-Flow Gas-Lift Wells Jim Hall – Shell Int’l E&P 10 February, 2004 ASME/API/ISO Gas-Lift Workshop.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
32 nd Gas-Lift Workshop The Hague, The Netherlands February 2 - 5, 2009 This presentation is the property of the author(s) and his/her/their company(ies).
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
Nov. 13, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Gas-Lift Future An Extension of the Past, or a Whole New World? by Cleon.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Introduction : WEF Capital Project Complexity AA Packages Bulk materials BB SPAR Power- generation module Turbine generator package CC Valves, line pipe.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
2013 ASME/ALRDC Gas-Lift Workshop
TG Chair: Darren Bane (BHI)
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
2001 ASME/API Gas-Lift Workshop
Fall 2001 ASME/API Gas-Lift Workshop
API RP 17A - Discussion Points
Spring 2003 ASME/API Gas-Lift Workshop
Active Control of Gas Lift Wells Simulation and Experimental Series
2016 Gas-Lift Workshop Chair: Jim Hall, Shell International E&P
Status Update on API 16Q / 16R / 16F
2010 ASME/ALRDC Gas-Lift Workshop
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
For more information or to nominate papers, displays, etc., contact:
Spring 2008 ASME/API/ISO Gas-Lift Workshop
CHAIR - JIM BENNETT EXXONMOBIL
API 17H TASK GROUP January 15, 2013.
Gas-Lift Automation Breakout Session
Discussion Points API RP 17A Task Group Members
2001 ASME/API Gas-Lift Workshop
For more information or to nominate papers, exhibits, etc., contact:
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
For more information or to nominate papers, displays, etc., contact:
CHAIR - JIM BENNETT EXXONMOBIL
2002 Spring ASME/API Gas-Lift Workshop
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP June 26, 2013.
2002 Spring ASME/API Gas-Lift Workshop
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

API 11V Task Group 15 November, 2007 Houston, USA

Agenda Introduction What is the pertinent API Organization? What is an API Recommended Practice (RP)? What is the typical API RP development process? What is the typical API RP development time line? What commitment is required to complete this document? API Procedures for Standards Development 11V Task Group Process Revise, Modify/Confirm Objectives Revise, Modify/Confirm Content Structure and Scope (draft provided below) Tasks definition and distribution (option to volunteer) Discuss/agree on this RP document development/review process Discuss potential project time line Agree on place, date of next meeting

API Organisation

Gas-Lift Task Group Organization Task Group Chairman – Jim Hall, Shell Int’l E&P Secretary – Cleon Dunham, Oilfield Automation Consulting Active Projects: RP11V5 – Chairman, Cleon Dunham RP11V6 – Chairman, Joe Clegg, Integrity Consulting RP11V8 – Chairman, John Martinez, Production Associates RP11V9 – Chairman, Cleon Dunham RP11V10 – Chairman, Steve Gossell, Saudi Aramco RP11V11 – Chairman, Juan Carlos Mantecon, SPT GROUP

API Spec./RP Process 11V Task Group determines need for new work Work Group chairman enlists members Work Group prepares an API NWI (new work item) Sub-Committee 11 approves NWI Work Group develops the Spec / RP 11V Task Group requests SC11 approval Sub-Committee 11 requests comments and approval from members Spec. / RP is approved and published Spec. / RP is reviewed every 5 years Revise, Reaffirm, Withdraw

Nominal Timeline for a document

Gas-Lift Specifications and Recommended Practices - Published Specification (Spec)11V1 - Specification for Gas Lift Equipment (41 pages)* Recommended Practice (RP)11V2 - Gas-lift Valve Performance Testing (60)* RP11V5 – Recommended Practice for Operations, Maintenance, and Trouble- Shooting of Gas Lift Installations (34) Soon to be updated RP11V6 – Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves (88) RP11V7 – Recommended Practice for Repair, Testing, and Setting Gas Lift Valves (26)* RP11V8 – Recommended Practice for Gas Lift System Design and Performance Prediction (94) * To be replaced by ISO

Gas-Lift Specifications and Recommended Practices – being developed 11V9 – Recommended Practice for Operation, Maintenance, Troubleshooting and Design/Re-Design of Dual Gas-Lift Systems 11V10 – Recommended Practice for Design of Intermittent and Chamber Gas-Lift Wells and Systems

Gas-Lift Specifications and Recommended Practices – New Work Item Recommended Practice for Dynamic Simulation of Gas Lift Wells and Systems

RP – Dynamic Simulation od Gas Lift Wells and Systems – Team Juan Mantecon, SPT Group - Chairperson Cleon Dunham, Oilfield Automation - Secretary Adam Ballard, BP Arne Valle, Hydro Dan Dees, AppSmiths Egil Henrik Uv, Hydro Fernado Ascencio Candejas, PEMEX Dr. Fernando Samaniego, UNAM (Mexico Autonomous Nacional Uni) Galileu Paulo Henke A. Oliveira, Petrobras Greg Stephenson, ep-solutions Kallal Arunachalam, ConocoPhillips Ken Decker, Decker Technology Murat Kerem, Shell Shanhong Song, Chevron Torbjørg Klara Fosum, Statoil Yula Tang, Chevron

Content / Scope (1) Purpose of this document Who is the target audience of this RP? Researchers Engineers Analysts Operators What are the objectives of this RP? Science Improved knowledge/awareness Training Improved designs Improved operations Other

Content / Scope (2) Typical Gas Lift Operations Continuous Gas Lift Dual gas-lift Gas-lift of gas wells Intermittent gas Lift Single Point Gas Lift Injection – Subsea Interventionless Gas Lift – Well Kick-off – Well Clean-up Riser Gas Lift Dry Gas Injection When to start Gas Lifting Dynamic Simulation vs NODAL Analysis Black Oil vs Fluid Composition

Content / Scope (3) Flow Stability Cause of Slugging Conditions Slug Size and Frequency Operational instability – heading Determine cause(s) of heading Determine possible cures Water Accumulation Corrosion Rate Corrosion Inhibition Production Chemistry – Flow Assurance Hydrates Dissociation/Formation Wax Appearance Pressure-Temperature Hydrates/Wax Avoidance Method Pressure-Temperature Control Remove Supply of Water Hot-Cold Re-Start Flowline Depressurization Insulation Inhibition

Content / Scope (4) Shut-in / Start-up Watercut Limit Liquid Loading Crossflow / Commingling Fluids Well design and Operations Horizontal Wells Multi-Lateral Wells Intelligent Wells Well-Clean-up Well Kick-off WAG Injection Integrated Modelling (well+flowline+riser) Real-time Modelling

Content / Scope (5) Recommended approaches to use dynamic simulation for gas-lift Purposes of dynamic modeling of gas-lift wells Design Design confirmation Problem identification Problem diagnosis Operational optimization Recommended modeling techniques Recommended ways to implement dynamic models Engineering studies Operational systems Case histories – how models are used, what are the benefits