River Research & Design, Inc.

Slides:



Advertisements
Similar presentations
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Advertisements

BANK EROSION PINS.
Weathering, Erosion, and Deposition
NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Luxuries We Like To Have The “Luxury of Space” The “Luxury of Time” (nature strengthens the project over time) The “Luxury of Monitoring” The “Luxury of.
How To Mark a Field. 4 May 06, Ver. 1.5How To Mark a Field2 Tools Required A long (150 yards) accurate tape measure with a ring on one end. A long (150.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
Irish Gulf, Boston, NY  Vertical eroding banks  Urban  Pool-riffle-pool regime  Gravel-cobble bed stream  Small stream (average width 30 ft, 10 ft.
Development of Surfaces.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
CONTOUR LINES.
Distance Measurement Introduction zDistance is one of the most basic engineering measurements zEarly measurements were made in terms of the dimensions.
What is the project about? Define the goal of this project
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
Polygons, Circles, and Solids
Problem Solving: Area and Surface Area of Composite Figures
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Word Problems for Right Triangle Trig. Angle of Elevation: The angle above the horizontal that an observer must look at to see an object that is higher.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Wes Marshall, P.E. University of Connecticut March 2007
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
Problem 2 week 18. Question A basketball coach wants to hang 3 plaques on a wall. She wants to hang the three plaques side by side so that they are centered.
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
Rulers or Tape Measures
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
Precision Layout Unit 21.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
HAWKES LEARNING SYSTEMS Students Matter. Success Counts. Copyright © 2013 by Hawkes Learning Systems/Quant Systems, Inc. All rights reserved. Section 8.5.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Warm-Up Find the area: Circumference and Area Circles.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
Roof Types, Components & Terminology
Map Scale Warm-up Questions What is Map scale?(DOK 1)
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS (Looking across and upstream in this view) Designed jointly by.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
Standard Little League Field
Introduction to Drafting and Design
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
Lesson Applying Differential Leveling Techniques.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
THE ROCK BOX  Cost to build Rock Box $18K, constructed of ½ inch steel plate, box is designed to increase in-stream stone placement production by keeping.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
ONONDAGA CREEK, NEAR SYRACUSE, NY
Unit: Surveying Lesson: Measuring Distance
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
Forging new generations of engineers
Gateway – Unit 7 – Green Architecture
US Customary Measurement System
SINGLE STONE BENDWAY WEIRS
The Amazing Biltmore Stick and Cruiser Tool
Dial Calipers Dial Calipers
Parabolas.
Measurement.
Presentation transcript:

River Research & Design, Inc. BANK EROSION PINS By Dave Derrick, Potomologist & VP, River Research & Design, Inc.

BANK EROSION PINS A simple, inexpensive & accurate way to precisely measure bank erosion rates. Five ft long sections of ½ inch diameter rebar are driven horizontally into the toe, middle, & upper sections of an eroding bank until the river end of the rebar is flush with the face of the bank. Over time the length of rebar exposed shows the amount of erosion!! Wooden stakes are usually labeled (5 ft, 10 ft, etc) & driven at 5 ft intervals (5 stakes) on top bank above the rebar in case the rebar is washed away.

Phil Balch in KS installing bank pins The rebar is driven into the bank until the end is flush with the face of the bank. 3

Bank Erosion Rate Measurement 5 ft long sections of ½ inch diameter rebar is driven into the toe, middle, & upper bank until the rebar is flush with the face of the bank. Thalweg trace Distance varies, 40 to 200 ft typical 5 ft long rebar bank erosion pins On shorter banks only two erosion pins would be needed, not three

Bank Erosion Rate Measurement Distance varies, 40 to 200 ft typical 5 ft long sections of ½ inch diameter rebar is driven into the toe, middle, & upper bank until the rebar is flush with the face of the bank. Thalweg trace 20 ft 5 ft long rebar Distance varies, 40 to 200 ft typical Stakes Mark stakes with distance from edge of bank (5 ft, 10 ft, 15 ft, etc.), then measure back from edge of bank & drive stakes into ground at 5 ft intervals

Pins were originally installed with river ends flush with streambank surface Bank erosion pins Measure exposed length of rebar to determine amount of erosion, then divide by time since rebar was installed to determine the erosion rate. Convert this number to the erosion rate in feet per year. Bank erosion monitoring pins are pieces of rebar driven into the bank until the ends are flush with the streambank 6 6

Stake was placed 25 ft from breaking edge of top bank one month ago Travelute Site, Little Blue River, KS. Stake was placed 25 ft from breaking edge of top bank one month ago 21 ft of lateral migration in one month! On this site, the banks were 23 feet high. Two markers were set in the field; 1 – 29.1 feet from the bank, the other was set 28 feet from the edge. When checked in May; one pin was gone, the other was 7 feet from the edge. 7 7

This PowerPoint presentation was developed & built by Dave Derrick This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.com For questions involving erosion pin installation, call or email Phil Balch, riverworker@yahoo.com Wildhorse Riverworks, Inc., 11821 NW 13th St. Topeka, Kansas 66615 Mobile 785-213-3778; Office 785-478-4886 “Based on the interagency publication, Stream Corridor Restoration: Principles, Processes, and Practices, this introductory training covers: Stream corridor ecosystems and their components Ecological processes, structure & functions Characterization and analysis of stream corridors Development of a restoration plan Design, implementation, monitoring, and Integrated, iterative, adaptive, flexible approaches”.

CLEOPHUS SPEED ELVIS DERRICK, WITH FRIENDS