Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Inpatient Facility Boardman, Ohio Faculty Advisor: Dr. Linda Hanagan.

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Inpatient Facility Boardman, Ohio Faculty Advisor: Dr. Linda Hanagan

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Thesis Outline / Goals  Analyze and design concrete structure  Analyze steel vs. concrete comparison  Expand knowledge and skills of concrete design methods  Improve understanding of construction management - Initial analysis did not provide building flaws worthy of thesis investigation - Base goals on educational growth, rather than solutions to improve deficiencies in structure

Existing Conditions Josh Behun - Structural Owner: - Humility of Mary Health Partners Structural Engineer: - Atlantic Engineering Services Mechanical / Electrical Engineer: - Scheeser, Buckley, Mayfield, LLC Total Cost: - $64 Million Construction Dates: - July 2005 – August 2007 Design-Bid-Build Project Background Location: - Boardman, Ohio Project Size: - 7 stories – 220,000 sqft - 14’-8” typical story heights Architects: - Moody-Nolan, Inc - Strollo Architects General Contractors: - The Albert M. Higley Co - Alex Downie & Sons Co.

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Expansion Plan - Renovation footprint shown in red

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation - 7 Story Patient Tower - 3 Story Mechanical Area - 2 Story O.R. / Offices / Kitchen - Cafeteria - All else Pre-Existing, Non-structural, or Future Expansion Plan

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Typical Floor Framing for Patient Tower Typical bay supported by: - 4” composite, light weight concrete slab. - 2” composite metal deck with ¾ inch shear studs. - Wide flange steel beams and girders of various sizes - Lateral bracings shown in red W24x76 W21x44 W30x90 34 ’ 29.5 ’

Existing Conditions Lateral Resisting System Lateral steel “chevron” bracings - HSS members - Elevator Core - West Stairwell Patient Tower - Significant locations of mechanical room area and OR wing St. Elizabeth Boardman Hospital Renovation Josh Behun - Structural - Lateral bracings shown in red

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Architecture / Exterior Wall System - Curvilinear aluminum panel curtain wall - Primarily brick façade Patient Tower Southern ElevationPatient Tower Northern ElevationPatient Tower Eastern Elevation

Future Expansions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Phase II Renovation  Second tower to be added with next expansion project - Mirrors original tower renovation - Directly off elevator core - with additional elevators to be added to service new tower demands

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Structural Depth Study  Redesign hospital’s structural framing system using reinforced structural concrete - Slabs - Columns - Lateral Bracing System ( Shear walls )  Evaluate effectiveness of concrete structure against structural steel system  Further develop knowledge and understanding of concrete system design and relative tools

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Two-Way Flat Plate Slab with Drop Panels psi concrete inch slab depth inch deep drop panels - 16 x 22.5 inch perimeter beams - Typical #8 rebar at 12” spacing spanning both directions and Perimeter Beams  Redesign Patient Tower and Typical Slabs - 19,000 sqft Patient Tower - 9,000 sqft Mechanical Room area - 36,000 sqft OR / Kitchen-Cafeteria  Long girder spans  Maintain open architectural plan

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation One-Way Slab with Beams psi concrete - 8 inch slab - 16 x 22.5 inch edge and T-beams - Typical #8 rebar at 12” spacing spanning only one direction  Redesign Elevator Core Slabs - 5,000 sqft Elevator Core

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Beam Design - T-beams - 16” width x 13” depth - (6) #6 rebars  One-way slab  Two-way slab - Spandrel beams - 16” width x 13” depth - (6) #6 rebars Overall floor depth of 22.5 inches * A difference of 13.5 inches ! * 16” 13” 8” 9.5” 13” 16”

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Column Design - 14’- 8” story height, with 15’- 3” ground floor - 24”x 24” square columns - Typically (8) #8 bars used throughout (except ground floor columns) - # 3 confinement ties  Redesign Columns with Concrete 24 ”  Original Column Encasement Size  Resist Punching Shear in Slabs

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Shear Wall Design - 8 inch “special reinforced concrete shear walls” - Boundary elements - Monolithically constructed with columns - One curtain of # 5 rebar spaced at 15” o.c.  Replace Braced Frames with Concrete Shear Walls - Shear walls shown in red  Rigid Structure - Period of 0.4 seconds

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Concrete Redesign Weight  Recalculated Building Loads Steel FramingConcrete Framing Estimated Building Weight 36,000 Kips52,300 Kips Floor Dead Load 105 psf 145 psf Period1.7 seconds0.4 seconds

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management - Scheduling Process - Construction Sequence - Cost Breakdown  Evaluate managerial aspects of alternative concrete framing system through:  Determine which system provides more effective construction process  Determine effects redesign places upon construction process

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management Original Steel Framing Structure - 4 months - Other trades working continuously Alternative Concrete Framing Structure - 7 months - Other trades start after several weeks  Schedule Update

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices - Beneficial to begin work earlier in project  Operating Room / Kitchen Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing Construction Management

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Slide  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Slide  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Slide  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Slide  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Management  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Steel FramingConcrete Framing Material And Labor $ 3,572,400$ 2,665,825 Schedule EffectsShorterLonger Construction Management  Cost Comparison - Concrete framing system actually less expensive - Though, only accounts for structural framing costs - Extended schedule would drive project costs

Final Recommendations Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation  Concrete Structure Vs. Original Steel Structure  Benefits of Concrete Structure  Recommendations Concrete System Steel System - Shallower floor system - More open floor plans - Less expensive framing system - Faster construction schedule - Stiffer structural frame  Advantages not enough to suggest concrete system’s superiority

Final Recommendations Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation  Concrete Structure Vs. Original Steel Structure  Benefits of Concrete Structure  Recommendations Benefits inch floor system reduction - Stiffer structural frame - lower period - Less expensive system ( Based on material installation alone ) - Additional fire-proofing unnecessary Disadvantages - Extended construction schedule - Likely larger foundations - More material usage

Final Recommendations Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation  Concrete Structure Vs. Original Steel Structure  Benefits of Concrete Structure  Recommendations  Steel system more effective with specific project  Having designed for concrete from conception stages would produce better results

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Sustainability Vegetated Green Roof SystemEPDM Roofing Membrane System  Extensive System - 4 inch substrate depth - 41 psf wet - 60% water retention  Cools Roof Surface - Evaporation - Absorbs Sunlight Applications - Excellent weather resistance - Resists freeze-thaw cycle - Reflects Sunlight - lowers surface temperature  Full, direct southern exposure - Offset summertime HVAC cooling demands Problems - Reflects light toward adjacent buildings - Heating surface temperatures of exterior walls

??Questions?? Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation

Existing Conditions Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Expansion Joints  Teflon slide bearings - Two 3/32” pads of 100% virgin polytetrafluoroethylene polymer resin - Reinforcing aggregates of ground glass fibers bonded to stainless steel plate - Withstand temperatures of up to 400 degrees Fahrenheit - Working load capacity of 2000 psi

Structural Depth Study Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Lateral Forces Resisted  Load combinations and design forces were determined using Etabs structural modeling software  Wind forces controlled design

Breadth Studies Josh Behun - Structural St. Elizabeth Boardman Hospital Renovation Construction Slide  Construction Sequence - Formwork - Rebar - Concrete - Shoring / Reshoring - Columns - Shear Walls - Slabs - More intricate work - Less repetitive tasks - Lobby - Kitchen - Offices  Operating Room Wing