Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.

Slides:



Advertisements
Similar presentations
Building and Grounds Committee Mike Clarey, chairman Ken Plueger Tom Reuter Tim Pick Bill Anthony Fr. Matt Hewitt.
Advertisements

House Construction (Foundation Plans)
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
Architectural Drawing
Campus signage – Internal
Grimsby Secondary School
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Housing Styles. Common Floor Plan Layouts: ► Single-Level ► Split-Level ► Daylight basement ► Two-story ► Dormer ► Multilevel.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Foundation Systems.
Part I January 26, Income Pledges $150,000 47% Offering $33,200 10% Total$183,200 57% Endowment $75,452 24% Other funds $48,542 15% Total$123,994.
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 2 Fall Hazards Did you know? Falls from elevation account for one third of all deaths.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Eugene 6D Exhibition.  CHARACTERISTIC   Use ground base foundation  The building is made by Jati  Bamboo walls  double beam roof truss  Floors.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Bellini Tower. - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
Rembrandt Tower - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
Many thanks to Henry and Kristen. We are glad to have you as friends and happy to be your contractors.
Building Plans.
Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
UNT in partnership with TEA. Copyright © . All rights reserved.
PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
District Rotary Foundation Seminar District 7980 Global Grant in Mombasa, Kenya
Housing Service Review Plan for the coming period 24 November 2014.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
DRAUGHON COMMUNITY ROOM Welcome to the
Watch University Grow April 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Competency: Draw Foundation Plans Objective: Identify terminology related to foundation plans.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Fundamentals of Construction
A HOUSE.
APPLICATIONS OF TECHNOLOGY
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Interior Design Floor Plans And Elevations.
Drawing & Building Names
Space Planning Objective 5.01.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Spread Footing Design for Columns
Before The hardwood in the ceiling gave a warm feeling to the pool.
BY HERBER.
Housing Styles.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Competency: Draw Foundation Plans
Progress Report 11/10/11.
C.M. Scullion Associates Ltd
My home, my castle. 1.What is your name? 2.Where are you from?
Collapse Patterns.
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
1 / 13 hallway. 1 / 13 hallway 2 / 13 living room.
Concrete A structural material made by combining cement, sand, aggregate, and water.
KOMPLEX Investors Report – Q
Space Planning Objective 5.01.
Spread Footing Design for Columns
Mathematics Unit 45: Twisted Building
Minuteman Vocational Technical Regional High School Progress
At ridge height for family room
Spread Footing Design for Columns
1 / 13 hallway. 1 / 13 hallway 2 / 13 living room.
BY HERBER hallway 1 / 13 2 / 13 living room 3 / 13 dining room.
Presentation transcript:

Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a ground level entrance with elevator service to the library and museum allowing building access to all. Thanks to the members of the WMI and their families, the Gala Committee, all who participated in the fund-raising galas, Tom Cullum and VPS Architecture, Jeff Koester and a host of dedicated laborers and all who have had a hand in making this project a reality.

It begins with a plan

And a hole in the tower wall

Then a hole in the ground

And yet another hole in the basement wall.

Foundations are strengthened with rebar.

A portion of roof is removed.

Work continues underground.

Holes in floors make way for an elevator shaft.

Steel beams go into place.

In place at last

An equipment room takes shape.

The equipment room nears completion.

We’re not finished yet. Follow our progress as we install our elevator. Watch for “Access for All – Part 2”