Caretakers House Demolition Decking to STEM and ARTS.

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.
Dame Colet / Haileybury Youth Centre
Concrete Modeling in Revit Structure
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
Heavy Concrete Construction Formwork
Structural System Overview
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Futureview Solar Solutions Elysburg, Pa. Call
Fire Behaviour Elements of Structure and Fire Development.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Rectangular framed structures
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Commercial Structural Framing Systems The Skeleton of the Building The structure of life I have described in buildings... is deeply and inextricably connected.
School Building ready for Slab casting.. View of the Children's Home.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Framing the House. Platform Framing Platform framing.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Luminaire Types.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
Competency: Draw Foundation Plans Objective: Identify terminology related to foundation plans.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Beams - structural members supporting loads at various points along the member. Transverse loadings of beams are classified as concentrated loads or distributed.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Cross Wall Construction
FACTORS EFFECTING COST OF BUILDING ELEMENTS
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Construction Methodology for Suramadu Main Bridge.
Introduction to composite construction of buildings
APPLICATIONS OF TECHNOLOGY
How Completed Interiors Are Achieved: Designing & Building
Assembly And Installation Of Ikea Kitchen Cabinets
Table (3.1)- the averages of the 10 models costs
Common Structural Forms
Foundation Analysis Material options: Considerations:
Pre-Contract Cost Control
. - t !!l t. - 1f1f J - /\/\ - ' I __.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Competency: Draw Foundation Plans
Minuteman Vocational Technical Regional High School Progress
Framing the House                                                                                                                   
20 Chestnut Drive, Mansfield
Building Construction I
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Value of contract: Length of contract: Contract start date:
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Concrete A structural material made by combining cement, sand, aggregate, and water.
In-Class Scheduling Exercise
Masonry Bearing Walls.
Minuteman Vocational Technical Regional High School Progress
Bulkhead security lighting
Commercial Structural Framing Systems
Pole Position Student Points Time
A B C D.
Presentation transcript:

Caretakers House Demolition

Decking to STEM and ARTS

Concrete Frame Arts First Floor - Rebar Rebar – Second FloorFirst Floor Slab

External MUGA and Lighting Layout Car Park - Denver Pole Luminaire 5m columns MUGA - Scorpius Luminaire 8m columns

Upcoming Works Brickwork/Blockwork Continue installing pre cast walls and columns along with In-Situ elements Scaffolding continuing Decking continuing along lower ARTS – F/F and upwards Concrete Pour to upper ARTS

Follow