FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

Schematics and Valves Reference info. Fundamentals -- Monoprop Blowdown System.
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
Section 17.0 Propulsion Subsystem Michael S. Rhee Propulsion Lead 5 Space Technology “Tomorrow’s Technology Today” GSFC ST5 PDR June 19-20, 2001.
Joint and Conflat Leakage, March 2007 Tests P. Titus, MIT (Mar. 7,2007) Problems/Observations: “Large” LN2 Leaks were evident - but Mercury tests were.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Propeller Shaft survey
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
1 isr Institute for Sustainable Resources CRICOS No J Automated Greenhouse Gas Measurement System.
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
MPSRReaction Control System 1 UCB, 26 October 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW Reaction Control System Michael Sholl University of California.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
MPSRReaction Control System 1 UCB, 26 October 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW (Update on repressurization) Michael Sholl University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
Propulsion Workshop 23 March, 2011 In-Space Propulsion Technology Area 02 Alfred Herzl © 2011 Lockheed Martin Corporation. All Rights Reserved.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
15-16 June THEMIS Propellant Offload Concept M. Sholl (UCB) M. McCoullough (SAI) P. Turin (UCB) June 2005 MIWG/GOWG(TIM) Space Sciences Laboratory.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
TESLA Rocket Project Lecture #3 10/28/15
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS Critical Design Review Reaction Control Subsystem
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
HELIUM LEAK TEST OF INNER BORE WELDS OF TUBE#TUBESHEET JOINT
Take 5 for Safety E. Lessard March 22, Pressure Safety Accident  Tallahassee, Fla. — On Wednesday, Oct. 21, 2015 at about 10 a.m., an accident.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Industrial Resources, Inc.
Safe Use of Schlenk and Vacuum Lines
IT-4189 Supply and installation of a cryogenic distribution system
Thermodynamics Processes.
© Copyright, Hydraulic Control System Options
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
FIELDS SCM Thermal iPER
Tracker cooling loop “check out” draft for discussion
Dual Fuel Engines.
Fuel Supply System Service
Fire Extinguisher Monthly Inspection
Joint and Conflat Leakage, March 2007 Tests
Load Sample is loaded into the P7+ loop in 4 seconds. Carrier runs through the P6 valve.
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
ISRC and LEBT Vacuum System Design
Benzene in Water by Purge and Trap Analysis
SNS PPU Cryomodule Instrumentation
Presentation transcript:

FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS Lead Engineer University of California - Berkeley

FM2 PPSRRCS Pressure Test Leak Check 2 UCB, March 16, 2006 Overview MEOP tests and leak checks are scheduled to verify RCS system survived environmental testing Performed after thermal vacuum, vibration and shock testing Tests to be performed in Building 179 (magnetics) Test is identical to RCS MEOP/leak check performed March in Berkeley Primary hazards during test are helium asphyxiation and tank pressurization

FM2 PPSRRCS Pressure Test Leak Check 3 UCB, March 16, 2006 Test Sequence SV1 Manifold Tests Isolation Valve Cycle Test (SV1 manifold to 400psia) Forward Leakage Test (decay test) using panel gauge SV1 Leakage Test using pipette (depressurize SV1 manifold)) Cycling tests on latch and thruster valves LV Cycle Test Thruster Valve Cycle Test Low Pressure Transducer / Propellant Tank MEOP Test Low Pressure Transducer Output Test (pressurize tanks to 400psia) Propellant tank MEOP Test Latch, thruster and SV2 & SV3 leak tests Latch Valve Forward Leak Test Thruster Valve Forward Leak Test Low Pressure Service Valves (SV2 & SV3) Leak Test (depressurize tanks to 50psia) High Pressure Transducer / Pressurant Tank MEOP Test High Pressure Transducer Output Test (pressurize COPV to 1750psia) Pressurant Tank MEOP Test High Pressure Service Valve Functional Test High Pressure Service Valve Leak Test (depressurize COPV to 50psia)

FM2 PPSRRCS Pressure Test Leak Check 4 UCB, March 16, 2006 GSE 2TE (Low Pressure Test Panel) TE (High Pressure Test Panel) Thruster enable test set Pipettes (1ml) for valve leak checks Service Valves Latch Valves Thruster Valves Interfaces to s/c via nozzle throat plugs and Tygon tubing Droplet of H2O injected with syringe Helium K-bottle Blast Shield 1/2in thick polycarbonate

FM2 PPSRRCS Pressure Test Leak Check 5 UCB, March 16, TE (Low Pressure Test Panel)

FM2 PPSRRCS Pressure Test Leak Check 6 UCB, March 16, 2006 TE (High Pressure Test Panel)

FM2 PPSRRCS Pressure Test Leak Check 7 UCB, March 16, 2006 Thruster Enable Test Set Allows actuation of thruster valves Both seats simultaneously (cross-strapped) Individual seats Low-current mode to hold thrusters open during test LEDs indicate thruster firing

FM2 PPSRRCS Pressure Test Leak Check 8 UCB, March 16, 2006 Nozzle Throat Plugs

FM2 PPSRRCS Pressure Test Leak Check 9 UCB, March 16, 2006 Safety/MA Considerations 1.5x proof test on both panels and lines (tags will be in place by time of test) Only required personnel in test facility Blast shield and PPE (face shield/goggles) in use O 2 alarm and placarding in place Temperature and humidity Safety signoff at beginning and end of haz. proc. ESD per THM-SYS-014 EDS Control Plan Temperature: 65-75ºF Humidity: 25-60%

FM2 PPSRRCS Pressure Test Leak Check 10 UCB, March 16, 2006 Summary MEOP tests and leak checks are scheduled to verify RCS system survived environmental testing Procedure has been run, and is well-understood Safety precautions in place