Bartosz Sakowicz Marek Kaminski Piotr Mazur Calibration Database.

Slides:



Advertisements
Similar presentations
1 Computational Asset Description for Cyber Experiment Support using OWL Telcordia Contact: Marian Nodine Telcordia Technologies Applied Research
Advertisements

What's new?. ETS4 for Experts - New ETS4 Functions - improved Workflows - improvements in relation to ETS3.
RiT PatchView Solution
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Module 3 Configuring Hardware on a Computer Running Windows XP Professional.
Components of GIS.
High Availability Options for JD Edwards EnterpriseOne Shawn Scanlon, GSI.
Chapter 1 Section II Fundamentals of Information Systems
T-FLEX DOCs PLM, Document and Workflow Management.
Printer Installation Ben Wu A&S IT 09/18/2007. Outline  Preparation  Local Printer Installation  Network Printer Installation  Printer Sharing  Other.
–Streamline / organize Improve readability of code Decrease code volume/line count Simplify mechanisms Improve maintainability & clarity Decrease development.
The TIMING System … …as used in the PS accelerators.
Copyright © Yokogawa Electric Corporation 13 th February Exaquantum R2.70 Enhancements.
IHP Im Technologiepark Frankfurt (Oder) Germany IHP Im Technologiepark Frankfurt (Oder) Germany ©
Overview Print and Document Services Print Management console Printer properties Troubleshooting.
Techniques for establishing and maintaining constant temperature in ICT systems in order to reduce energy consumption Mihail Radu Cătălin Truşcă, Ş. Albert,
Trouble History Database of HIMAC ~ Current Status and Future Plan ~ T.Kadowaki (Accelerator Engineering Corporation) 28.SEP.2007
All Experimenters Meetings Windows 7 Migration 1 April 18, 2011 W7 AEM Presentation.
©Kwan Sai Kit, All Rights Reserved Windows Small Business Server 2003 Features.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech CICHALEWSKI, DMCS-TUL ATCA Review, Monday, Dec , High Level Applications.
The Asset Inventory Management module assists with data collection and discovery management processes. Collected information is interpreted and automatically.
WavioNet 2.0. Proprietary Information. 2 Objective Introduce WavioNet application NMS Learn how to perform basic device management Understand WavioNet.
Service Publications and Training SGI Confidential SGI COPAN 400 MAID and VTL Maintenance and Administration Intro & Overview Product Features Installation.
Help Desk Introduction to Computer User Support. 2 Certificate III Software Applications Introduction to Computer User Support Increased Need for User.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Chapter 2 Introduction to Systems Architecture. Chapter goals Discuss the development of automated computing Describe the general capabilities of a computer.
A configurable Interlock System for RF- Stations at XFEL M.Penno, T. Grevsmühl, H.Leich, A. Kretzschmann W.Köhler, B. Petrosyan, G.Trowitzsch, R.Wenndorff.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
David Foster LCG Project 12-March-02 Fabric Automation The Challenge of LHC Scale Fabrics LHC Computing Grid Workshop David Foster 12 th March 2002.
Accurate Information … Informed Decisions Data from automated and manual sources in a central, secure repository providing easy regulatory and ad hoc reporting,
TRIUMF HLA Development High Level Applications Perform tasks of accelerator and beam control at control- room level, directly interfacing with operators.
Automating Installations by Using the Microsoft Windows 2000 Setup Manager Create setup scripts simply and easily. Create and modify answer files and UDFs.
Control-Theoretic Approaches for Dynamic Information Assurance George Vachtsevanos Georgia Tech Working Meeting U. C. Berkeley February 5, 2003.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
13 Copyright © 2007, Oracle. All rights reserved. Using the Data Recovery Advisor.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
542d Combat Sustainment Wing 2006 NCSL International Workshop & Symposium United States Air Force Metrology NextGen Calibration Automation System Presented.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Cofax Scalability Document Version Scaling Cofax in General The scalability of Cofax is directly related to the system software, hardware and network.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
How Sage ERP X3 Systems Can Benefit Businesses.  Sage X3 is an affordable and flexible ERP solution designed to help mid-sized companies manage business.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
Bogusław Kosęda, DMCS-TUL XFEL-LLRF-ATCA Meeting, 3-4 Dec The European X-Ray Laser Project XFEL X-Ray Free-Electron Laser 1 Automation for XFEL in.
Chapter 4. CONCEPT OF THE OPERATING SYSTEM MANAGING ESSENTIAL FILE OPERATIONS.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Supporting quality devices
Create setup scripts simply and easily.
CMS DCS: WinCC OA Installation Strategy
Status of deliverables 2008
Automation and Feedbacks
EIN 6133 Enterprise Engineering
The Improvement of PaaS Platform ZENG Shu-Qing, Xu Jie-Bin 2010 First International Conference on Networking and Distributed Computing SQUARE.
Application of SysML to LLRF system design M.Grecki
Valeria Bartsch UCL David Decotigny LLR Tao Wu RHUL
UML: Unified modeling language
Wireless OSS Documentation Improvements Roadmap
Wireless OSS Documentation Improvements Roadmap
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Internal components of a computer.
Presentation transcript:

Bartosz Sakowicz Marek Kaminski Piotr Mazur Calibration Database

XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Status of work from previous contract WP Flash firmware databaseUnder review/accepted WP EA RequirementsUnder review/accepted WP Active WP Active WP Active WP Under review/accepted WP Cancelled WP Cancelled WP Main database modulesUnder review/accepted WP Under review/accepted WP Under review/accepted WP Under review/accepted WP Under review/accepted WP Under review/accepted WP Under review/accepted WP Under review/accepted WP Cancelled WP Cancelled WP Cancelled WP EA configuration changeAccepted WP Time Sheet SystemUnder review/accepted

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Proposition to new contract (1) Calibration parameters prototype database (already done !)  hardware database (including cables and connections)  firmware database  calibration parameters database

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Proposition to new contract (2) Calibration parameters database improvements (to be precised):  relation to DOOCS parameters  documentation database  software bundles concept  geographical localization feature  relation to Time Sheet System (in the future)

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Relation to XFEL requirements/goals (1) [LLRF GOALS] ID NameText G1Minimal SystemBuild minimal system capable of fulfilling commissioning and initial operation (build minimal system that is capable of being upgraded to full automated system without major changes in the system structure) a. Scalable b. Upgradable c. Release capable (designed for multiple releases) G4Easy operationSupport the operators for easy operation, allow single operator to change beam energy G4.1Accept declarative inputsSystem should accept declarative inputs: a. Parameter will be set by operator and system determines settings for the inputs itself G4.2Operator input fault tolerance Prevent operator from setting parameters which lead to undesired accelerator conditions

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Relation to XFEL requirements/goals (2) [USER REQUIREMENTS] ID NameText UR6Provide automation for operation Provide a high degree of automation of operation to assist the operator and system experts UR6.1Minimize the parameter set that the user should input Most of the LLRF system parameters should be generated automatically from the abstract input from the user. UR27User's manualProvide user's manual for LLRF operation UR32User interfaceProvide intuitive user interface with help function

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Relation to XFEL requirements/goals (3) [SYSTEM REQUIREMENTS] IDNameText SR7Automation for operationProvide a high degree of automation of operation to assist the operators and RF experts: 1.All LLRF components should provide interfaces for automatic configuration and control 2.An unified and extendable automation concept and framework should be worked out 3.Procedures for different LLRF operation scenarios should be worked out 4.Automation bypass mode (manual mode of operation) should be also provided SR14.4.4Control system statusWarnings and alarms: 1.LLRF database accessibility 2.Operator input out of range Exceptions: 1.Operating system failure 2.Device driver failure 3.DOOCS server failure 4.Computer network failure SR16DocumentationProvide documentation for LLRF system description and operation support. The documentation should include system requirements, system concept, design, acceptance test descriptions and operational manuals. SR16.2Provide online help documentations Provide online help documentations for trouble shooting by the users. Each topic of the online help documentations should be able to be searched out within 1 minute. SR39(To be elaborated) Easy to install and re-install LLRF hardware and software should be easily installed. The metric can be: the man- hour needed to install a hardware or software. May include: 1.Cable installation 2.Crate and board installation 3.Software including the run-time environment installation 4.Firmware configuration SR49Easy to learnMore than 90% of the tasks should be done by the operator by accessing the online help documentations [SYSTEM REQUIREMENTS]

Calibration Database XFEL Collaboration meeting, Lodz, Poland Bartosz Sakowicz, Ph.D., Dep. of Microelectronics and Computer Science, Tech. Univ. of Lodz Thank you for attention