1 Rebanding Update 2 Basic Rebanding Message  Interference has been a serious problem for 800 MHz Public Safety and Critical Infrastructure communications.

Slides:



Advertisements
Similar presentations
The DMS Website ~ SLERS Notify Me & Notification Settings EZ PUBLISH GUIDE.
Advertisements

800 MHz Re-banding Public Safety View By David Buchanan.
Flexible Airborne Architecture
WHAT IS YOUR PLAN? Site Trunking. Affiliation Each radio can only be affiliated with one site at a time. Each radio can only be affiliated with one talkgroup.
 800 MHz Transition Administrator, All rights reserved. 800 MHz Re-banding for Public Safety NPSPAC Region 39 Nashville, Tennessee September 15,
1 Improving Public Safety Communications in the 800 MHz Band (WT Docket No ) Catherine W. Seidel, Deputy Chief Wireless Telecommunications Bureau.
 800 MHz Transition Administrator, All rights reserved MHz Reconfiguration National Spectrum Managers Association (NSMA) May.
Exhibit A. 806 TV Broadcast Ch FCC Spectrum Allocation of 800 MHz Band * MHz Interleaved Band (including Bus/ILT/PS/SMR) 300 Channels.
1.  The Australian Radio Communications Industry Association represents some 300 commercial entities including approximately 1500 industry professionals.
Cameron County - Office of Emergency Management Radio Tower Site # 1 CAMERON COUNTY - WEST Existing - 7 Channel Motorola Public Safety Trunking System.
Georgia Interoperability Network
Radio Interoperability Initiative. Problems Facing Public Safety Communications Technology  Higher Frequencies  Lower Power  Trunking  User Expectations.
Update on Communications in Butler County Butler Regional Interoperable Communications System Presented to Township Trustees Association January 13, 2011.
William E. Ott EMS Summit August 25, 2006 Evolving Communications Technology.
12.5 kHz Narrowbanding The Mandate to 12.5 kHz Operations Meeting the FCC Narrowbanding Requirements.
What is Narrowbanding? FCC mandated process to require a channel efficiency of 1 voice channel per 12.5 kHz of spectrum for all users operating between.
SCIP Conference Austin, Texas August 24, Migrating to Narrowband On July 2, 1991, The Commission released a Notice of Inquiry to gather information.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
1 Kentucky’s Public Safety Awareness Initiative Program Spectrum Management January 00, 2005.
Intelligent Transport Systems (ITS) - Update on spectrum arrangements Spectrum arrangement options to support ITS in the MHz band in Australia.
Securing Home Networks (including WiFi and Servers) By Dr. Rafael Azuaje, Sul Ross State University, Alpine, TX Home networks (wire/wireless) are becoming.
Radio Technology Presentation
Jackson County School District Interoperable Radio Proposal.
For the Public Safety Community
Conventional vs. Trunking Radio Systems
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Radio Communications System Failure and System Trouble.
Basic Radio Usage AWIN Network Support.
FCC Narrow Band Mandate: It’s Closer Than You Think.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
Motorola’s ASTRO 25 IP Platform
State Services Commission Crown Copyright 2006 RADIO COMMUNICATIONS – APCO P 25 TECHNICAL STANDARD SUITE It is recommended that the e-GIF committee Approve.
1 Public Safety Wireless Network – State of Wyoming.
Mark Hoppe Andrew Maxymillian Saratoga County System Design Review.
Bucks County Commissioners James F. Cawley, Esq., Chairman Charles H. Martin, Vice Chairman Diane M. Ellis-Marseglia, LCSW David M. Sanko, Chief Operating.
Site on Wheels AWIN Network Support. Table of Contents What is a Site on Wheels (SOW)? How does a SOW differ from a COW? When should a SOW be deployed.
The Narrowband Transition A Primer. Narrowband Transition What is it? What is it? A nation-wide move to new VHF/FM frequencies A nation-wide move to new.
User Technical Committee Radio Technology Discussion
Update on the Restack of Digital Television Services Chris Hose Executive Manager, Technical Planning and Evaluation Branch, ACMA.
The Utah Communications Agency Network Established 1997 Status as of September 2004.
1 Is there a requirement for a Commercial TETRA Operator in Venezuela? Caracas, September 20th 2005.
1 The basic plan Units are on the DISP (Dispatch) TG when not assigned to an incident. Stations monitor the DISP TG. When dispatched on an incident units.
800 MHz Realignment Retuning Methodology. Proposed FCC 800 MHz Realignment Plan (Non-Border Areas) MHz Cellular A & B Band 700 MHz.
TECHNOLOGY UPDATE Gregory C. Miniutti, Chief of Communications Joel Vetter, Chief of Emergency Support Services
Slide 1 1 Explanation of ITTF Communications initiatives and the use of IREACH for health departments.
Using TSB-88 Region MHz Using TSB-88 to insure frequency usage does not cause interference in Region 5.
2014 UPDATE ABOUT THE VIPER MEDICAL NETWORK (VMN)
Narrowbanding Update Time is Growing Short Bill Waugaman L. Robert Kimball & Associates.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
FCC Narrowband Update June 24, Presented by: Chief Paul Maplethorpe Greater Round Lake F.P.D. Co-Chair MABAS Communications Committee
Emergency Communication Plan and Equipment Requirements for Your Organization DRAFT 22 October 2007 Clip art images are a place holder for a photo of your.
Sharepoint Layout In an effort to make it easier for our students and parents navigate each of our sharepoint sites we have decided to have three common.
1 NSMA Spectrum Management Association Roundtable Tuesday, May 21, 2002 Jill M. Lyon Vice President & General Counsel.
Public Safety Radio System Upgrade & Reband Presented to the Board of County Commissioners September 9, 2008.
800 MHz Rebanding: An Overview
VHF/UHF Narrowbanding Region X Webinar March 15, 2012 Federal Communications Commission Public Safety and Homeland Security Bureau.
Harford County, MD Public Safety Interoperability.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
CBIZ RISK & ADVISORY SERVICES BUSINESS CONTINUITY PLANNING Developing a Readiness Strategy that Mitigates Risk and is Actionable and Easy to Implement.
Current Radio/communications issues for emergency responders within lower Puget Sound Region: Re-banding (Nextel) P-25 Switch Next Generation Radio system.
RADIO COMMUNICATIONS DEGRADATION & INTEROPERABILITY OR “CAN YOU HEAR ME NOW?” Presenter: Jon Bromberg (W1JDB) E astside Fire & Rescue – COML/COMT.
FM 54 GSM-R points ERA ERTMS Unit London, 22 February 2016.
National Public Safety Telecommunications Council Regulatory Update Bette Rinehart.
ITFS Becomes EBS New Rules and New Band Plan Presented by Edwin N. Lavergne February 15, 2005.
Exhibit A.
© 2013 Jones and Bartlett Learning, LLC, an Ascend Learning Company All rights reserved. Page 1 Fundamentals of Information Systems.
700 MHz Narrowband Channel Relocation Plan
San Diego County & Imperial County
Presented by: Chief Dave Dato Wauconda Fire Department
Presentation transcript:

1 Rebanding Update

2 Basic Rebanding Message  Interference has been a serious problem for 800 MHz Public Safety and Critical Infrastructure communications  FCC spent 2 1/2 years studying problem with 10’s of thousands of pages of comments  Report and Order was designed to reduce PS interference  If you are impacted, it is mandatory--you can’t get out of it  All costs are covered  Motorola is here to help you through the process and provide the absolute minimum disruption to your operation

3 Impacts to Subscribers and Infrastructure

4 Motorola’s System Categories System impact falls into 4 categories based upon channels used A – Channels in first 120 only ( / – / )  No NPSPAC Channels at all B – Channels in NPSPAC only ( / – / )  No Channels in General Category C – Channels in NPSPAC and first 120 / Expansion D – Channels in Interleaved spectrum ( / – / )  No NPSPAC Channels at all  No General Category Channels Note: Expansion Band PS will move, unless they opt to stay

5 Retune/Reprogram/Update/Replace Definitions  Retune: Updating the channel frequencies via the Customer Programming Software/Radio Service Software programming software  Reprogram: Updating operating software via software FLASH with new frequencies & band plan  Update: One or more boards must be replaced in the equipment to enable retuning or reprogramming  Replace: Cannot be updated to support new frequencies or band plans

6 Subscriber Impact -- Category A Channels in first 120 only  System with channels from / to /  Relocates to channels from / to /  Does not have any NPSPAC channels including Mutual Aid programmed in radio  Equipment impact  Radio units can be retuned to new frequencies  Radios in red are class B IM protection. Motorola recommends replacing those units for better interference protection after rebanding* * Costs to replace radios that can be retuned or reprogrammed will be the responsibility of the licensee Retune w/ RSS – XTS5000 XTL5000 XTS2500 XTS1500 XTS3000 Visar 800 ASTRO Saber ASTRO Spectra Spectra Spectra E Syntor 9000 Syntor ATM HT1000 Conv. VRM / PRM (All) MCS2000 MTS2000 MT2000 MTX8000 MTX8250 Conv. MTX850 Saber SI GTX Mobile GTX Portables STX STX Gemini Plus MTX 820 LCS 2000 LTS 2000 MaxTrac

7 Subscriber Impact -- Category B Channels in NPSPAC only  System with NPSPAC channels from / to /  Relocates to rechanneled / – /  821/ /869 MHz must be reflashed with new radio software to operate in 806/ /854 MHz  All radios must be retuned. The radios must be reprogrammed with a new RSS/CPS programming software to support new channels Reprogram Subscriber XTS5000 XTS2500 XTS1500 XTS3000 MCS2000 MTS2000 (512k) ASTRO Saber (1MB) ASTRO Spectra (>95) XTL5000 VRM & PRM (All) Replace Subscriber Spectra Spectra E Saber SI STX Gemini Plus MTX 820 MaxTrac LCS 2000 LTS 2000 MTS2000 (256k) ASTRO Saber (512k) ASTRO Spectra (<96)

8 Subscriber Impact -- Category C Both NPSPAC & first 120 Channels  System with NPSPAC channels from / to / and channels from / to /  May be a multi-step process  First Relocation from lower 120 ( / to / ) is retune only  Second Relocation to rechanneled / – / is Reprogram and/or Replace  All radios with NPSPAC channels must be re-flashed with new radio software to operate in new NPSPAC channels (806/ /854 MHz)  All radios must be retuned. Radios must be reprogrammed with a new RSS/CPS programming software to support new channels Reprogram Subscriber XTS5000 XTS2500 XTS1500 XTS3000 MCS2000 MTS2000 (512k) ASTRO Saber (1MB) ASTRO Spectra (>95) XTL5000 VRM & PRM (All) Replace Subscriber Spectra Spectra E Saber SI STX Gemini Plus MTX 820 MaxTrac LCS 2000 LTS 2000 MTS2000 (256k) ASTRO Saber (512k) ASTRO Spectra (<96)

9 Subscriber Impact -- Category D Channels in Interleaved spectrum  System with channels from / – / only  At this time, no impact; However,  Public Safety licensees in new Expansion band channels / to / can relocate if desired to frequencies below / MHz.  Project only requires retuning for those who move out of Expansion Band

10 Category B & C Product Replacement Mapping LTS 2000 ASTRO Saber (512k) Saber SI MTS2000 (256k) STX Gemini Plus STX LCS 2000 ASTRO Spectra (<96) Spectra Spectra E MaxTrac Syntor 9000 Syntor X MICOR Mostar Traxar Motrar Rebanded Subscribers RBP03 RBP01 RBM03 RBM01 Replace Subscriber Encryption Model III Large Channel size No Encryption Model I Encryption Large Channel size No Encryption Decision for 01 to 03 Portable If the portable is a model III, requires encryption or 255 channels, it should be replaced with an 03 radio. Otherwise, it should be replaced with 01s LTS2000 are replaced with 03s Mobile If the mobile requires encryption or 255 channels, it should be replaced with an 03 radio. Otherwise, it should be replaced with 01s LCS2000 are replaced with 03s

11 RBP03 RBM01 RBM03 RBP01 PORTABLES MOBILES Replacement Products Category B and C

12 Subscriber Summary  If system is MHZ only it is a Retune  If subscriber has any NPSPAC trunking channels, use replacement radio chart  Be sure you’ve checked your interoperability plans  Rebanding radios are driven by 3 factors  Display  Encryption  Number of channels  Accessories will be swapped on 1 for 1 basis

13 Systems Impact — Categories A & D (No NPSPAC MHz channels) Retune ASTRO/Analog SmartZone 4.1 ASTRO 25 6.X (SE & LE included) Private Data Systems Privacy Plus Privacy Plus-Enhanced SMARTNET I SMARTNET II (21 channels) SMARTNET II+ SMARTNET 3.O SMARTNET 3.1 SMARTNET 3.2 SmartWorks SmartZone 2.03 SmartZone 3.0 SmartZone OmniLink 3.5 StartSite * Unknown SPs are at risk None* Reprogram or Replace

14 Systems Impact — Categories B & C (Includes NPSPAC MHz Channels) Retune SMARTNET I SMARTNET II (21 channels) SMARTNET II+ SMARTNET 3.O SMARTNET 3.1 SMARTNET 3.2 SmartWorks SmartZone 2.03 SmartZone 3.0 SmartZone OmniLink 3.5 SmartZone 4.1 ASTRO/Analog StartSite Reprog & Retune None* Replace Update ASTRO 25 6.X - SE and LE included Private Data Systems * Unknown SPs are at risk

15 Stations Retune All Categories: DSS I, II, & III (Data Stations) MTR 2000 MSF 5000 Quantar Quantro STR 3000 MICOR-Non-Simulcast Note: Requires retune of high stability oscillator in Channel Element MICOR Simulcast Note: Requires retune of Reis Lab Synthesizer For Category A & D IntelliRepeater (IR) Reprogram Retune For Category B & C IntelliRepeater (IR)

16 Controllers For Category B & C 6809 (Pre-28Ch) Retune Update Retune All Categories: RNC3000 RNC6000 NCP3000 For Category A & D 6809 MTC 3600 IMP Zone Controller MZC 3000 CSC 7000 Retune Reprogram For Category B & C 6809 (28 Channel) - Includes StartSite & SmartWorks MTC 3600 IMP Zone Controller MZC 3000 CSC 7000

17 Network Management For Category B & C SIMS I SIMS II SIP Replace All Categories: Zone Manager Site Command Site Control Manager For Category A & D SIMS II System Watch II SIP SIMS I (Open Issue) Site Lens Retune For Category B & C System Watch II Site Lens Reprogram

18 Conventional only—No Impact Category A & D Trunked Systems—No Impact Impact on Category B & C Systems — No Impact with two exclusions: Trunked CENTRACOM II will have to be replaced CENTRACOM Series II+: still being evaluated Consoles

19 Software Development and Certification Effort For Fielded Units  New channel assignment required to move NPSPAC to lower part of band  Channel Spacing in changes with new band plan  Channel number to frequency translation must change  Control channel list has been increased to allow old and new assignments  Failsoft channel list has been increased to allow old and new assignments  New plan allows radios to work on either upgraded or not upgraded site  Simplifies rebanding migration process  Minimizes disruption to Licensees  Greatly reduces infrastructure costs and overlay requirements  Reduces number of duplicate systems needed  Enables system-wide mobility throughout customer migration

20 Old Plan New Plan (Includes Old Plan) Band Plan Migration  Step 1 – Update Mobile with New Plan (Includes Old Plan) Site 1 Site 2

21 Band Plan Migration  Step 1 – Update Mobile with New Plan (Includes Old Plan)  Step 2 – Update Site 1 with New Plan Site 1 Site 2 Old Plan New Plan (Includes Old Plan)

22 Band Plan Migration  Step 1 – Update Mobile with New Plan (Includes Old Plan)  Step 2 – Update Site 1 with New Plan  Step 3 – Update Site 2 with New Plan Site 1 Site 2 Old Plan New Plan (Includes Old Plan)

23 Infrastructure Summary  Impact on Non-NPSPAC Systems is Retune  Impact on NPSPAC Systems requires more effort: Reprogram or Update  SMARTNET I & II need HW Replacements  Other Systems need new SW  New band plan software incorporates both before and after plans  Simplifies rebanding process significantly

24 Motorola Rebanding Services Management services  Pre rebanding services  Inventory  Impact assessment  Costing Engineering services  Baseline current system operation  System design Overall project management System rebanding  Subscriber changes  Infrastructure changes  Site upgrades and antenna systems installation--when necessary  Perform final Acceptance Test Plan

25 Information Sources  Motorola’s Public Website  Specific 800 MHz Rebanding Questions

26 Thank You