WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!

Slides:



Advertisements
Similar presentations
MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Advertisements

ODOT Structure Project Manager Seminar Specifications
ODOT Structure Project Manager Seminar Concrete Decks
Structural Steel Construction
Actions and Retrofit of Post Earthquake-Damaged Bridges
Corrosion Resistant Reinforcing Steels.
2013 Northcentral Region Construction Conference
As told by Elizabeth Anderson, Stormwater and Erosion Control Engineer (SWECE), SE-Region.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Concrete Box Culverts (CBC)
JAB Plastic Products Corp. Technical Information.
Supervision and Administration
Subpart R Steel Erection
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Concrete Pre Cast Panel By Peter Spence ID:
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
CARES and the reinforced concrete industry
Introduction to Magnum Piering, Inc Presentation by: Howard A. Perko, Ph.D., P.E. Magnum Geo-Solutions, LLC MAGNUM Informational Bulletin ISO-MAG1-11A.
 Project Delivery  Design Considerations  Lessons Learned.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Bridge Maintenance and Repair.
Floor Systems and Foundation Support
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
Module 7: Construction Phase
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Introduction to a pit installation
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Allen Hughes State Materials Office
1 HVACR116 – Trade Skills Structural Drawings. 2.
Cableway Safety and Inspection Common Cableway Problems.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Fundamentals of Structural Detailing
There are 2 Types of Bridge Inspectors – Class B and Class A.
Sign Structures Updates: Helpful Tips for Inspectors
Reinforcement Information - Code
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
COFFERDAMS.
Hot Work Permit Osan AB Fire Emergency Services.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
Section Engineers Meeting March 6, 2014 Lexington, KY.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
PROJECT CLOSEOUT MODULE 11. Objectives Establish procedures for effective/smooth project close-out As-built plans Project payment Certifications Report.
Concrete Box Culverts (CBC)
There are 2 Types of Bridge Inspectors – Class B and Class A.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Acceptance Process for Manufactured Products by Certification:
Guardrail Leaveouts 606 special provision July 6, 2016.
4th Annual Construction Law Summit
Please call for pricing
Construction Materials and Workmanship
Course Contents Culverts Bridges Buildings 20 November 2018.
BASEPLATES SLIDE SHOW.
Quality Assurance for Emulsified Asphalt Surface Treatments
Value Engineering In Design
Fiber Reinforced Polymer Systems
Presentation transcript:

WisDOT - Bureau of Structures Brandan Burger

 Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us! See Structures Contacts Handout BOS Contacts.doc  Remind Contractor to go thru Construction Staff for answers

 CMM 1-65 Updated engineer responsibilities related to as- built structure plans (require “STRUCTURE” to be placed above as-built title box on title sheet)  CMM 5-70 Guidance and checklist for field personnel inspecting ancillary structures installations (mainly pertain to new sign/signal structures installation requirements)

 Std. Spec (FDM and CMM Guidance will be available in March 2015)  New Policies Dual Approach to Ice Based on Project Type  Projects with HPC or greater than 2000 CY concrete STSP S shall be included in plans and bid by contractors  Projects with less than 2000 CY concrete Standard spec administrative item payment of $0.75/lb remains in affect  Ice should be paid for – field engineers should not delay pours if ice is required  Ice delivered and stored on site should not be paid for unless used as required per Std. Spec.

 Masonry Anchor Install Type L or S adhesive anchor ACI/CRSI Certified Installer, or Field Verification by Non-Destructive Pullout Testing

 Pigmented Protective Surface Treatment Used on parapets, different product than decks  Stainless Steel Reinforcement Moved into STSPs  Polymer Modified Asphalt (for Overlays) Moved into STSPs

 Plan details for fill at wing tips  Proper Fill = Minimize Future Erosion

 What is your experience with environmental issues (sediment control)?

 Be plugged into fabrication of elements  Templates to match at connections  Verify dimensions for field installation  Get BOS & Jim Parry involved  Suggest mock grout pour before the actual  Follow grouted coupler instructions

 Issues with loose deck steel Bar chair spacing too large Bar tie spacing too large or missing  STD. Spec Placing and Fastening

 Probing during deck pour and dry run  Top Cover  Bottom Cover  Deck thickness

 Structural Approach Slabs US Highways & Interstates Details included in the structure plan Contractors have successfully poured with bridge deck

 Detail for pouring SAS with bridge deck  Contractor would have to propose using this

AbutmentPier Cap

Saw cut DO NOT ALLOW

 Abutment Paving Block Joint  Sawcut on Bridge Deck

 Welders must be qualified prior to welding in the position, process, and type of joint. Correct Certification.  A written weld procedure for each type of weld is required.  Get familiar with weld symbols and nomenclature.  Storage and care of welding electrodes.

 Call us with Questions  We look forward to another great year of bridge construction! THANK YOU!