School Activities Report 1
primary Education available. No Seconadary School is available away 15 km.from Sangise village. girls did’nt study Isolated & hilly area. No available vehicle or bus facilty for education. condition of villagers very poor. Educational Background : Sangise-I,Kauthe Malkapur,-II,Shendewadi-III 2
Villages in and around Sangise School-I 3 Sangis e(1.5k m) Khandshi (08km) Velavali (4km)) Valak(2 km) Umbarwa di (10) Budhawadi (2 km) Nesawe (5 km) Wadiwale (5km)
School Information AT Sangise-I The School Started in 2004 with one Class room for 8 th with 32 students with 11 children orphange. school strength year (2013) 148. Seven 10 th batches appeared in ssc board Exam.up to March 2013 and 216 students passed out. 5 th class started newly this year. Now 25 orphange in Mai Balgruh. 4
5 School Building 2013-Sangise
Balgruh Building,Sangise
Mai Balgruh-25 Orphange 7
School Students-Sangise 8
9 Student’s strength Total
10 SSC Results to
11 Malkapur (1km) Thakarwad i (03km) Shindodi (5km)) Rankham b (7km) Shelkewadi (2 km) Darewadi (5 km) Villages in and around Sangise II School(Kauthe Malkapur)
School Information : Malkapur (Sangise II) The School Started in 2010 with one Class room for 8 th with 18 students. school strength this year 65. first 10 th batch will appear for ssc board Exam. March
Before School building Land-Kauthe Malkpaur(Sangise II) Then 13
14 School Building -year 2013-Kaute Malkapur (Sangise II) Now
15 Class room-year 2013-Kaute Malkapur (Sangise II)
16 Student’s strength Total
17 Shedwadi (1km) Thakarva sti(5km)) patharfhat a (3km) Hivargao (2 km) Villages in and around Sangise 3(shendewadi)
School Information The School Started in 2013 with std 8 to 10. school strength this year 69 first 10 th batch will appear for ssc board Exam. March
Village of Shendewadi School 19
Class room 20
Villager & Parents Meeting
School Students-Shendewadi School(III) 22 As there is no 3 rd classroom, the classes for the 3 rd set of students is conducted outdoors
23 Student’s strength Total -85 Shendewadi (Sangise III)
School Building Latest condition 24 The construction for the school is on hold due to lack of funds.
Future Plans for Shendewadi School Construction –Roof top /flooring,tiling & painting. Class room Furniture & Office furniture. Need for students : Science Lab, Toilet blocks,Sport & educational equipments. Liabrary,wallcompound,teaching aids etc. Need more staff. 25
Thank you 26