EHN1 Roof consolidation EATM F. Magnin – GS/SE/CEB
EHN1 - Characteristics Construction year: 1977 Primary use: Experimental hall Total surface: m 2 Construction materials Metallic structure and cladding Concrete slab Metal sheet / insulation / bituminous waterproofing
Roof issues Recurring leaks Worn out waterproofing membrane Air bubbles Saturated insulation at low point
Executed works Identification of the most critical area Reinforcing waterproofing membrane over m 2 Replacing saturated insulation Isolating renovated area from the rest of the roof Treatment of the roof crossing (ducts, pipes) Total cost: 155 kCHF (BC / 76389)
What is next for EHN1 consolidation Keep going with phased roof consolidation Widening access to helium tank on the Jura side (April 9 th ) Dealing with toilet evacuation issue Consolidation of the access ramp to the building on the Jura side