EHN1 Roof consolidation EATM - 24-03-2015 F. Magnin – GS/SE/CEB.

Slides:



Advertisements
Similar presentations
Potential sources of asbestos in buildings
Advertisements

Construction Method, Material Selection & Building Services
Water Based Bituminous Liquid Membrane WATERPROOFERS TO THE NATION
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
Liquid Rubber is the world’s only EPDM rubber in liquid form. Liquid Rubber provides a seamless, single coat roof coating that can be applied up to 6.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Repair Methods of the Roofing Structures Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
Company Profile. EMPIRE SOLUTIONS EXPERIENCE With more than 10 years of experience dedicated to the roofing, energy conservation, corrosion control, painting.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
Can Challenge Emily and Amina The Silver Demon. Materials.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Deferred Maintenance CFAA Conference Presented by: Paul Belanger P.Eng., Belanger Engineering Bill Zigomanis, Boardwalk REIT Ivan Murgic, Greenrock Property.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
Hall D Cryostat Heat load and Flow calculations What are we doing ? 1. Measuring the heat leak into the magnet for all the 4 coils 2. Determining of number.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
HVACR416 - Design Air Distribution Part 2. Air Ducts Air carriers that deliver air to conditioned space. Originally hot air ducts were thin, tinned sheet.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Building Resource Inc. Sustainable Durable Buildable Cost Effective
Pecha Kucha Group 1. Design Concept Features? Features?External Cycle store to the right of the face of the buildings. Encased in timber cladding as will.
Date of download: 6/22/2016 Copyright © ASME. All rights reserved. From: Investigation of Heat Transfer in Evaporator of Microchannel Loop Heat Pipe J.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
MAY 10 th, 2010 Visit of Commissioner for Regional Policy – Johannes Hahn in the town of Rousse.
Bamboo Roofing Sheets.
CONCRETE AND SUSPENDED TIMBER
Date of download: 10/3/2017 Copyright © ASME. All rights reserved.
NA CONSOLIDATION & SAFETY SYSTEMS
Visit for more Learning Resources
Francois and Lau EATM 17 July 2012
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
MORTER-PRIMER (Bituminous Primer).
DAMP-PROOFING AND WATER-PROOFING COURSE
EHN1 Neutrino Installation Plans
Module 3 Domestic Heating/MMA Welding
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
FLOATING STUDENT RESIDENCE
Potential sources of asbestos in buildings
DO’s and DON’Ts of toilet construction
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
Course Contents Culverts Bridges Buildings 20 November 2018.
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Components of Construction
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
Minuteman Vocational Technical Regional High School Progress
All about Waterproofing
Presentation transcript:

EHN1 Roof consolidation EATM F. Magnin – GS/SE/CEB

EHN1 - Characteristics  Construction year: 1977  Primary use: Experimental hall  Total surface: m 2  Construction materials  Metallic structure and cladding  Concrete slab  Metal sheet / insulation / bituminous waterproofing

Roof issues  Recurring leaks  Worn out waterproofing membrane  Air bubbles  Saturated insulation at low point

Executed works  Identification of the most critical area  Reinforcing waterproofing membrane over m 2  Replacing saturated insulation  Isolating renovated area from the rest of the roof  Treatment of the roof crossing (ducts, pipes)  Total cost: 155 kCHF (BC / 76389)

What is next for EHN1 consolidation  Keep going with phased roof consolidation  Widening access to helium tank on the Jura side (April 9 th )  Dealing with toilet evacuation issue  Consolidation of the access ramp to the building on the Jura side