Palomar Medical Center West: Segmented Review Process.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Introduction to Structural Design
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Loads and Load Paths "Architecture is inhabited sculpture."
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Alternative Project Delivery
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Final Report Terminal X McCarran International Airport.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
I.Program Update The following summarizes major activities completed or in progress as of June 30 th, II.Program Budget Summary (Attachment A) The.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
XII- COST CONTROL, MONITORING & ACCOUNTING
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Week3: The Project Management Process Groups 1 Prof. Ahmed Sameh Professor of Computer Sc. And Information Systems.
QIO Program Overview December 6, About VHQC Private, non-profit healthcare consulting and quality improvement organization More than 60 experienced.
Sutter Medical Center Castro Valley Images from VSM Meetings.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Department of Human Services Dr Paul Scown Chief Executive Melbourne Health 6 th July 2004 Melbourne Health Pilot Case Study.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Construction Project Management: Technology driven answers for schedule and budget savings.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
I.Program Update The following summarizes major activities completed or in progress as of September 30, II.Program Budget Summary (Attachment A)
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 HVACR116 – Trade Skills Structural Drawings. 2.
Introduction to Structural Design © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Architecture has recorded the great ideas of the.
Government Procurement Simulation (GPSim) Overview.
Chapter 2 Introduction to Construction Procedures
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
Preliminary Project Descriptions/Outline Specifications
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
California State University, Sacramento Facilities Services May 19, 2008.
Brad Oliver – Structural Option Advisor – Professor Memari.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Clinical Decision Support Implementation Victoria Ferguson, COO - Program Manager Christopher Taylor, CIO – Business Owner Monica Kaileh, CMIO – Steering.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Eric Rinearson Director, Facilities Maintenance Services
BLAKELY  Welcome.
One Approach to Bundled Payments
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The project's conception: A feasibility study is done
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Introduction to Structural Design
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Project Development Quality Program QA/QC – What does ODOT need?
CBP Biennial Strategy Review System
ARCH 435 PROJECT MANAGEMENT
DBIA Manual of Practice
Introduction to Structural Design
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

Palomar Medical Center West: Segmented Review Process

Discussion Points Project Overview Why This Process? Details of What Was Done Ingredients Successes Lessons Learned

Building Stats 725,000 BGSF 360 Beds Project Cost $690 million Construction Schedule Start: July 2007 Finish: December 2010

360 Bed Hospital (288 Beds + 72 shelled rooms) 192 Acute Care Beds 168 ICU Beds 56 Emergency Positions (Level 1 Trauma) 12 Operating Rooms 6 Cath Lab/Interventional Radiology Rooms 18 Imaging Rooms H O S P I T A L P L A N N I N G

5 Design Bid Coordination Fabrication Construction Bid Design progresses over the same time with assistance from contractors Early OSHPD “Preliminary” reviews begin before documents are “finalized” Select contractors are chosenOther contractors bid when Permit is awarded Early contractors assist in design and begin their coordination efforts. Fabrication can begin earlier and all work is coordinated in 3D BIM and Design-Assist Strategy Plan Check - OSHPD I N T E G R A T E D P R O J E C T D E L I V E R Y Integrated Team & Process / BIM & Design Assist Contracts

Courtesy of the Office of Statewide Health Planning & Development I N T E G R A T E D P R O J E C T D E L I V E R Y OSHPD Pilot Permit Process

Why This Process? Innovation stems from problem solving Start dates often move, but end dates usually do not Ongoing Collaborative Discussion with OSHPD Blend of communication, desire to improve the process, and needs of the project

The Segments Segment 1: Detailed Approach –“Rules of Engagement” –Design Methodology, Modeling Assumptions, Code Interpretations. –Using Past Experience, Address Every “Rock in the Road” that has occurred on past reviews from both sides.

The Segments Segment 2: Building Configuration and Loading Criteria –Building Configuration and Layout of Lateral Force Resisting System –All Loading Assumptions –All Special Loading and Vibration Sensitive Areas –Matching Architectural and Structural

The Segments Segment 3A: Lateral Model and Frame Sizes –Complete Lateral Design Model and Accompanying Frame Elevations –Substantial Work Effort For Design and Review –Most Subsequent Design Activities are Dependent on Output From This Model

The Segments Segment 3B: Gravity Design and Model –Beams, Girders, Columns, Slabs –Both Model and Drawings –Most Subsequent Detailing is Impacted By This Sizing.

The Segments Segment 4: General Notes, Specifications, Typical Details –Specific Details Are Derived From Typical Details –“Floater” in the Process For Continuity of Review

The Segments Segment 5A: Foundations –Heavily Dependent on All Information in 3A and 3B Segment 5B: Diaphragms, Drags, and Chords –Heavily Dependent on All Information in 3A and 3B

Final Submittal Incorporates all Information From Segments All Detailing Now Introduced Unique Design Features That Develop Late Introduced

Schedule

Necessary Ingredients Owner and Architect That Can Commit To The Structure and Not Look Back Collaborative Team Cooperative Review Team Frequent Face to Face Interaction Sufficient Manpower and Fee

Extremely Helpful Ingredients Design Assist: Subs on Board 3D Coordination: BIM

What Worked Best “Rules of Engagement” Segment Model Segments Designer and Reviewer Both Impact The Design: Better Experience For All Saved Time

Lessons Learned Minimize Overlapping of Segments Focus More On Process, Less On Dates Recognize and Address Continuous Deadline Pressure For Team Obtain Clarity on What is Being “Conditionally Approved” Control Bookkeeping Address Long Lead Items: AMC, Soils, Ground Motion Do Not Limit To Structural Review

Q U E S T I O N S ?