CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)

Slides:



Advertisements
Similar presentations
T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Annual Modulation Study of Dark Matter Using CsI(Tl) Crystals In KIMS Experiment J.H. Choi (Seoul National University) SUSY2012, Beijing.
A Study of Time over Threshold (TOT) Technique for Plastic Scintillator Counter 高能物理研究所 吴金杰.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
CERN November 22, 20041W.H.Trzaska HIP Jyväskylä T0 answers Meeting with LHCC referees CERN, November 22, 2004.
ALICE Fast Interaction Trigger detector for the future
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Anatoly Ronzhin, 23 June, 2009 Anatoly Ronzhin, June 23, 2009 The main results of the TOF study at MT beams, May-June 2009 The team: Anatoly Ronzhin, Hans.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
Gain stability and the LYSO beam radiation monitor measurements
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
SiPM Workshop EU-FP7(HP3), Vienna, 16 Feb F.G. H.O. Study of scintillator detectors time resolution with different SiPM readout on T10 test beam.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Activities and Results from PNPI GATCHINA
Test Beam Request for the Semi-Digital Hadronic Calorimeter
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Ultra fast SF57 based SAC M. Raggi Sapienza Università di Roma
MDT and analog FEE mass production:
Start Detector for pion experiments
Tracking results from Au+Au test Beam
LHCC referees’ questions, comments, requests
Some results of test beam studies of Transition Radiation Detector prototypes at CERN. V.O.Tikhomirov P.N.Lebedev Physical Institute of the Russian.
F.Guber, A.Ivashkin INR, Moscow
Francesco Forti University and INFN, Pisa
Status of the TOF Detector
Chris Smith California Institute of Technology EPS Conference 2003
Conceptual design of TOF and beam test results
Commissioning of the ALICE-PHOS trigger
The LHCb Front-end Electronics System Status and Future Development
Characterization of Wired-OR prototype board
Presentation transcript:

CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration) Results and conclusions from the June 2004 comprehensive test run Milestones Cost estimate

CERN September 29, 20042W.H.Trzaska HIP Jyväskylä Experimental set-up 6 m of cable 25 m of cable PMTs Shoebox Main electronics Main electronics  TRD

CERN September 29, 20043W.H.Trzaska HIP Jyväskylä Typical TOF spectrum obtained with a pair of identical detectors FWHM = 94 ps

CERN September 29, 20044W.H.Trzaska HIP Jyväskylä Measured time resolution Radiator diameter FWHM TOF Sigma PMT 30 mm 122 ps  140 ps 37 ps  42 ps 26 mm 112 ps  128 ps 34 ps  39 ps 20 mm 94 ps  115 ps 28 ps  35 ps * With shoebox (worsens resolution by   20 ps)

CERN September 29, 20045W.H.Trzaska HIP Jyväskylä Amplitudes For easier comparison the areas under the peaks were normalized to The amplitudes were taken with the same PMT and at the same HV, just the radiators were changed

CERN September 29, 20046W.H.Trzaska HIP Jyväskylä Efficiency as function of threshold At very low threshold values registration efficiency for particles entering perpendicular to the front surface of the radiator is simply proportional to the area of that surface: 100,75, 44% If the threshold value has to be raised (noise from other detectors, deterioration of detectors or electronics, etc.) the 20 mm radiator may turn out to be the best choice due to its excellent response function

CERN September 29, 20047W.H.Trzaska HIP Jyväskylä T0 Efficiency in p – p collisions Radiator diameter T0 configuration – mm 53 % 20 mm 36 % 49 %

CERN September 29, 20048W.H.Trzaska HIP Jyväskylä Backsplash spectrum (20 mm quartz) The efficiency for backward particles is the same as for forward particles but they can be efficiently separated by adjusting the threshold value

Calculations by Alla Maevskaia9 Backsplash in 200 PYTHIA events backsplash Alla Maevskaia, INR RAS,Moscow FWD meeting T0-CT0-A

CERN September 29, W.H.Trzaska HIP Jyväskylä Conclusions I (physics) For all reasons except the efficiency in p-p collisions the 20 mm radiator is by far the best choice. –excellent pulse shape –1/4 MIP resolution! The efficiency can be restored, for instance, by increasing the number of detectors in T0-A (next T0 upgrade) Decision expected on Nov 2004 TB

CERN September 29, W.H.Trzaska HIP Jyväskylä Conclusion II (electronics) We have prototype of the shoebox and of all key electronics (Vertex, MPD, MT, VDU, QTC) –shoebox should work for V0 as well –work on DCS in progress –readout test (full chain) in 2005 Better pulse shape (20 mm radiator) reduces the dynamic range –use of off-the-shelf CFDs becomes possible –high threshold setting possible –stable performance

CERN September 29, W.H.Trzaska HIP Jyväskylä T0 mechanics milestones No concern: –T0-C prototype ready –Integration completed –Waiting for freezing of RB24 parameters to complete the design and order the production Production cycle 3-6 months Should be completed in 2005

CERN September 29, W.H.Trzaska HIP Jyväskylä T0 electronics milestones No major concern: –Prototypes of all dedicated T0 electronics build and tested –Excellent test results –Close collaboration with V0: PMT, front-end (next meeting 10/04) trigger-specific electronics (11/04) HV, LV, DCS? –T0 will use TOF readout (slightly modified) Shoebox Main electronics Main electronics

CERN September 29, W.H.Trzaska HIP Jyväskylä Some solid dates for T0 Nov 2004:Freezing radiator size Dec 2004:Electronics Design Review (joint with V0) Feb 2005: Detector module frozen; mechanics PRR Sep 2005:Full chain readout test Dec 2005: T0 Mechanics ready Feb 2006: Electronics PRR Jun 2006: T0-C ready for installation in ALICE; installation of electronics at CERN; tests of the installed T0-C Dec 2006:T0-A ready for installation in ALICE; tests of the installed T0-A

CERN September 29, W.H.Trzaska HIP Jyväskylä T0 cost estimate: 318 kCHF

CERN September 29, W.H.Trzaska HIP Jyväskylä Referee question: delay vs. HV 1.5 ps / V