17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
List of Nominations Connecting User Needs with Weather Research and Forecasts Rebecca E. Morss National Center for Atmospheric Research Boulder, Colorado,
A Path breaking Technology for Network Maintenance and Optimization
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Groundwater in Colorado: Hydrogeologic Investigations Supporting Groundwater Administration Kevin Rein, P.E. Deputy State Engineer.
Prepared by: Earth Data N.E., Inc. August 19, 2008.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Wellhead Protection Strategies: Keys to Success Prepared by: Mr. Brian Oram, PG, Licensed Driller, PASEO B.F Environmental Consultants and Wilkes University.
Charting the Upsurge in Hydropower Development 2015
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Potential for water buffering A landscape based approach Lieselotte Tolk, et al.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
CCR Rule: Consultant’s Perspective 2015 Air & Waste Management Association Meeting Callaway Gardens, GA Presented by: Randy Sullivan, Principal & Senior.
1 Climate Warming & California’s Water Future Jay R. Lund, Richard E. Howitt, Marion W. Jenkins, Tingju Zhu, Stacy K. Tanaka, Manuel Pulido, Melanie Taubert,
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Steering Committee 12 November Integrated Water Resource Management and its implications for the energy sector in Tajikistan PPCR Workshop on Climate.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
SOURCE WATER PROTECTION IN KARST SHENANDOAH VALLEY WATER CONFERENCE OCTOBER 28, 2008 WINCHESTER,VIRGINIA.
1 Climate Warming & California’s Water Future Jay R. Lund Civil and Environmental Engineering University of California, Davis
New activities Tour de Table – Lithuania Kestutis Kadunas, Geological Survey of Lithuania.
The New Maximum Benefit Paradigm. Common Issues with Other Basins and Other RWQCBs TDS, N and other water quality constituent objectives are common impediments.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
California Water Plan Update Advisory Committee Meeting January 20, 2005.
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Water.europa.eu Agenda point 5.f “Better Environmental options in flood management” Strategic Coordination Group, Maria Brättemark, WFD Team,
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Update on RCR Permitting
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Harmonization and Use of Standard Analytical Tools for Water Resources Management as an approach towards Regional Cooperation Abdulkarim H Seid Head, Water.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Curt Baranowski U.S. Environmental Protection Agency
Groundwater area protection plans in water management
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
White Flint North Entrance Feasibility Study
California Water Commission
Why Potable Reuse in Florida?
Presentation transcript:

17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT

Benefits of Quarry to Reservoir Conversion Feasibility Evaluations Volume of Storage Limiting Geotechnical Conditions Groundwater Interaction Program Schedule / Implementation AGENDA 2

1.Re-use of retired rock quarries for beneficial use 2.Limited environmental impacts 3.Location in developed and urbanizing areas 4.Storage provides climate resilience 5.Storage of water for range of purposes Water supply operational or emergency storage Wet weather storage BENEFITS OF QUARRY RESERVOIRS 3

"Piedmontmap". Licensed under Creative Commons Attribution-Share Alike 2.5 via Wikimedia Commons - New Jersey Pennsylvania Delaware Maryland Virginia North Carolina South Carolina Georgia Alabama PIEDMONT PLATEAU REGION 4

QUARRY RESERVOIR EXAMPLES 5 Thornton Quarry Reservoir 7.9 BG Elmhurst Quarry Reservoir 4 BG Travilah Quarry Reservoir 17 BG McCook Quarry Reservoir 10 BG

To Answer the Key Questions: What volume of storage will quarry provide? Are there existing geological or geotechnical conditions that may prevent use or limit usefulness? Potential for negative groundwater interactions? Potential water quality issues affecting long-term use? How to integrate reservoir asset in to the existing system? FEASIBILITY EVALUATIONS 6

WHAT VOLUME OF STORAGE WILL THE QUARRY PROVIDE? 7

Mining plan and future volume Can mining plan be altered to optimize capacity? Consider range of scenarios To what level can quarry be filled and drawn down? Ground improvement needs Groundwater influence Low level limitations (water quality, physical pumping limitations) WHAT VOLUME OF STORAGE WILL QUARRY PROVIDE? 8

Consider range of scenarios in multi-year increments Can mining be concurrent with reservoir operation? Can mining plan be altered to optimize capacity? Can mining plan accommodate timing needs? MINING PLAN AND SCHEDULE 9

ENVIRONMENTAL REVIEW TRAVILAH QUARRY

ENVIRONMENTAL REVIEW TRAVILAH QUARRY

ENVIRONMENTAL REVIEW TRAVILAH QUARRY

EXISTING GEOLOGICAL FEATURES OR GEOTECHNICAL CONDITIONS THAT LIMIT QUARRY'S USE AS A RESERVOIR? 13

Geotechnical Impacts Permeability of rock (floor and walls) Geologic and Hydrogeological Assessment: Geologic mapping Confirm and identify other major geologic features Identify quarry seeps and estimated flows Determine if deleterious rock is present Confirm quarry sump discharge Obtain regional groundwater data Evaluate wall stability and permeability WILL THE QUARRY HOLD WATER? 14

GROUND IMPROVEMENT REQUIRED 15

IS THERE POTENTIAL FOR HARMFUL LOCAL GROUNDWATER INTERACTION? 16

OPERATING QUARRY IS A SINK 17

ENVIRONMENTAL REVIEW ENVIRONMENTAL DATABASE SEARCH FOR PAST CONTAMINATION 18

GROUNDWATER PROTECTION SYSTEM

CAN THE MINING PLAN BE COORDINATED TO FACILITATE CONVERSION TO USE AS A RESERVOIR? 20

Improve pipeline / tunnel connection constructability Maximize capacity Improve quarry highwall stability Improve long-term reservoir access Reduce contaminants from quarry operations MINING PLAN OPTIMIZATION 21

PUMP STATION DESIGN Submerged Intake Inclined CansVertical Cans QUARRY PUMPING STATION OPTIONS 22 More economical / potential maintenance issues/ easy to maintain

Dependent on Owner and Operator Coordination Steps: Planning, Feasibility Studies (2-10 years) Agency Review and Permitting (6mths – 2yrs) Design (~2 yrs) Construction (2 -10 yrs) Potential Approaches: Construction Packaging & Phasing Early Partial Utilization of Quarry PROGRAM SCHEDULE 23

MULTIPLE QUARRIES PROVIDE FLEXIBILITY - TO MINING OPERATION AND FUTURE OWNER 24

Investigation of hydropower potential CONTINUED EVALUATION OF OPPORTUNITIES 25