CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.

Slides:



Advertisements
Similar presentations
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
July 1, 2009CFS-GBL meeting 1 PM report July 1, 2009: Meetings –FALC Quebec, July 12 – 13, 2009 –ILCSC Hamburg, August 19, 2009 –ALCPG09 Albuquerque, Sept.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
A. Yamamoto, N. Walker, and M. Ross, ILC-GDE Project Managers S. Stapnes, CERN LC Studies Leader LCWS12 - Opening Accelerator Plenary, , 18:00.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Status of ILC Project Nick Walker – DESY ILD Meeting – Cracow –
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
W. ChouLC School, Sokendai, Japan1 Linear Collider needs you  Linear Collider is HEP’s future (~ 2020)  If we want to have a future, we must train a.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Barry Barish KILC12 Daegu, Korea 23-April-12 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler Global Design Effort 1 23-April-12.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
1 Status of SB2009 Rebaselining Proposal Document and Feedback from PMs + Editor This version includes the touch ups applied during the AD/I webex meeting.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
AS Webex meeting – January 27, 2010
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Baseline Technical Review – Central Region Accelerator Systems
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
SCRF Monthly WebEx Meeting May 6, 2010
Conventional Facilities and Siting Global Group (ARCFS)
SCRF Monthly WebEx Meeting Sept. 22, 2010
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
, A. Yamamoto SCRF WebEx Meeting.
ILC Global Design Effort
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation relatively small – Views.py?view=standard&confId=4593 CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 1

Reviews: AAP –Eckhard Elsen will help open the BAW at KEK –Will review the BA Workshop written summary shortly after the meeting –(PM / AAP meeting) PAC: next in November CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 2

IWLC 2010 Joint Plenary sessions: Monday PM, Tuesday AM, Friday PM –Monday afternoon: CERN Directorate, Physics, GDE, Detectors –Tuesday AM: ‘Performance / Scope Joint session – GDE/PD/CLIC’ ? –Friday: summaries and wrap – up GDE/CLIC Plenary: Tuesday PM, Friday AM –Critical RD Reports (FLASH, CESR, ATF, CTF, SRF,…) Parallel: Just Wednesday and Thursday –(roughly ½ day less than we are accustomed to) CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 3

IWLC 2010 draft schedule CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 4

IWLC10 Working Groups 1)Sources: L. Rinolfi*, A. Variola, J Clarke, T. Omori 2)Damping rings, ATF and CESR-TA: Y. Papaphilippou*, M. Palmer, S. Guiducci, J. Urakawa 3)Main linac and superconducting RF Hitoshi Hayano, Carlo Pagani, Christopher Nantista 4)Main linac and normal conducting RF W. Wuensch, T. Higo, Ch. Adolphsen 5)Interaction region, ATF2 and MDI R. Tomas*, L. Gatignon, A Seryi, D. Angal-Kalinin 6)Drive beam complex and CTF3 J.-B. Jeanneret, C. Biscari 7)Low emittance transport and integrated simulations K. Kubo, D. Schulte, N. Solyak, F. Stulle* 8)Technical systems, instrumentation, pre-alignment and stabilisation H. Schmickler*, G. Blair 9)Civil engineering and scheduling J. Osborne*, V. Kuchler, A. Enomoto CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 5

Wednesday ‘Technical Area’ Webex meetings, To be used to prepare for Baseline Workshops – as needed CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab

Preparation for the 1 st BAW July 23: AD&I meeting July 28: SCRF meeting and draft BAW report to be distributed –delayed Aug. 25: SCRF meeting and the final report (prior to the 1 st BAW) to be distributed August 28: AD&I meeting CFS/GBL 04 Aug, 2010Marc Ross, Fermilab7

Baseline Assessment Workshop CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 8 At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues. Developed prior to (and at ) the meeting itself A set of questions to be answered –Also serves as a draft outline for the summary document The summary is the ‘Workshop Report’ – –to be submitted as part of ‘Top Level Change Control’

Workshop Report The ‘Baseline Assessment’ is an advocacy process –A problem solving and integration process –We intend to develop a positive recommendation –For BAW 1, this means: Answering in the positive sense review panel (and other) comments on single tunnel / HLRF and gradient Preparation – SLAC 03.08, KEK CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 9

2 nd BAW proposal (SLAC) January : Reduced RF, focusing on parameters, running scenarios and development plans January 19: Reduced RF focusing on cost and performance projections and potential upgrade paths and summary/recommendation, January 20: Positron Source Location, focusing on running scenarios and technical issues January 21: Positron Source Location, focusing on cost and performance projections and summary/recommendation. 7/23/ AD & I (M. Ross)

Discussion expected at SLAC - BAW 1. Reduced RF Global Parameters Pulse length, n_b, power and cryogenic consumption AS impact – sources, damping rings and BDS Upgrade paths R & D strategies Cost impact – key cost items Performance impact – luminosity performance and impact on physics 2. Positron Source Location Running Scenarios – key aspects and luminosity as a function of energy Technical parameters – operational issues as a function of energy Variable repetition rate issues – power and cryogenic consumption; sources and damping ring performance Cost impact – key cost items Performance impact – luminosity performance and impact on physics 7/23/ AD & I (M. Ross)

TDP-2 R&D Plan Release 5 submitted to EC 04.08; –hope for ~ immediate release Updated R&D Plan for TDP2 reviewed by EC – Paris mid July Please read the CFS and S2 sections carefully R & D Plan appears to be ‘well-read’ CFS/GBL 04 Aug, Marc Ross, Fermilab

2010/2011 – Schedule CFS 2: 2-3 Aug. SLAC – just completed First Baseline Workshop: 7-10 Sept. KEK (Linac 2010: Sept. Tsukuba) LOwLBT (FLASH): - postponed (?) ECloud ’10: 8-12 Oct. Ithaca IWLC 2010: Oct. Geneva ILC PAC: Nov. Eugene Second Baseline Workshop: Jan SLAC ALCPG011: March 2011 Eugene CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 13