Consolidation activities for GS-SE Luigi Scibile GS-SE 12.09.2013Accelerator Consolidation Workshop, EDMS: 13128891.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
GS Department: Main Activities Lluís Miralles GS Department.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
AD consolidation activities in LS2
Special LS1 day on 12 June 2012, EDMS:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Update on the Ethernet Network Installation Campaign
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-CV interventions during EYETS for PS and PSB
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Experimental Areas – LS2 planning
ABP/RTL Main RTL Activities for 2007/8:-
LINAC 3 Meeting ICL machines Injectors
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:

Activities The works are structured in two types of activities: – Civil engineering works required by equipment groups (for example: new buildings/structures or small support works (creation of slabs, excavation of trenches, concrete coring, shielding walls, etc.)). – Works on the infrastructures only accessible during shutdowns (for example: tunnel floors and drains, underground sanitary equipment, roofs, etc.) Accelerator Consolidation Workshop, EDMS:

CE works required by GS groups (1/4) WARNINGS: – most of CE works require C4T – in your requests you should include the budget provisions for CE works. GS-ASE: – CE works to support the SPS Access project Accelerator Consolidation Workshop, EDMS:

BE-ABP – CE works to move the LBS line of Linac2/3 when Linac4 is connected to the PSB. BE-BI: No requests BE-RF: No requests Accelerator Consolidation Workshop, EDMS: CE works required by BE groups (2/4)

EN-CV: Small CE works in support of the CV equipment renovation. Connection of waste water systems in all BAs building to the local drainage network CE works to support the refurbishment of the HVAC for PSB CE works if consolidation of PS, PSB and AD complex chilled water production. Asbestos removal for several networks in the PS area EN-EL: CE works to support the Substations renovations Renovation of building for the Diesel generators. CE works linked to the renovations of the high voltage cables. Renovation of the civil infrastructures for the oil cooled transformers. EN-STI Refurbishment of surface buildings and tunnels in the AD area (196, 195, 232, 235, 853 and TT6) Accelerator Consolidation Workshop, EDMS: CE works required by EN groups (3/4)

TE-ABT: No requests TE-CRG: No requests TE-MPE: No requests TE-MSC: Renovation of bld 180: thermal insulation, windows, asbestos Renovation of bld 181: thermal insulation, windows Renovation of bld 163: windows TE-VSC: CE work to support the replacement of the water cooling system for the high temperature vacuum furnace in bld 153. Renovation of the water pipes in the underground of bld Accelerator Consolidation Workshop, EDMS: CE works required by TE groups (4/4)

Works on the infrastructures (1/2) Studies and consolidation works – Studies for PS and SPS structures, tunnel floors and drains, underground sanitary equipment, roofs - (already included in the current plan) – NEW: Monitoring of sensitive tunnel sections (see next slide). – POTENTIAL NEW: massive works on technical galleries. Repairs – TT Accelerator Consolidation Workshop, EDMS:

Monitoring of sensitive tunnel sections: – SCOPE: Study and implement additional tunnel monitoring system. Phase 1: TT10 monitoring Phase 2: extend the monitoring to other sensitive tunnel sections. – SCHEDULE: Phase 1: TT10 Installation (2014), TT10 analysis, modeling and system evaluation (2015) Phase 2: Study of sensitive tunnel sections and system preparation ( ), deployment (during shutdowns). – BUDGET: 400kCHF over 2014 and 2015 Budget for still to be evaluated Accelerator Consolidation Workshop, EDMS: Works on the infrastructures (2/2)

Closing remarks Accelerator Consolidation Workshop, EDMS: We are collecting requests from other groups and we will evaluate the work generated for the GS. The large civil engineering works must be planned considering the process of the call for tenders. For the small works, a three months notice would be ideal to organize the intervention of the contractors.