Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Certification of Compliance By Evita Lagard
Landfill Legislation Richard Campbell. INTRODUCTION  Prior to the mid-1980's, waste disposal sites were: sites that no one wanted, ie they were holes.
1 Midland Community Meeting Michigan Department of Environmental Quality Steven Chester, Director Jim Sygo, Deputy Director.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
MPCA Citizens’ Board Information Item February 25, 2014.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
CT DEP'S PERSPECTIVE ON SITE CHARACTERIZATION June 6, 2002 Presented by: Christine Lacas, Supervising Environmental Analyst Permitting, Enforcement & Remediation.
Miramar Hope Bay Ltd. Doris North Project Water Licence Application Presentation for Nunavut Water Board Public Hearing Presented by Kitikmeot Inuit Association/Nunavut.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
Nanisivik Mine Closure and Reclamation Plan NWB Public Hearing - June 3-4, 2004 Niy=4u s/C4ix3=4 mgizk5 wodyzk5l st3tbsizk5X3Nw5Jt5 kNK5u wuoEpf5 vtmttiz.
November 2008 Eureka Facilities Meeting. Introduction.
Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.
1 CanZinco Ltd. NWB Water Use Licence Renewal, 1AR-NAN0914 Nanisivik Department of National Defence Public Hearing October 8-9, 2014 Louis Lemay P.Eng.,
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
Consideration Of The Aggregate Recycling Systems Illegal Disposal Site For The Solid Waste Disposal and Codisposal Site Cleanup Program and Augmentation.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Review of Interventions Received after May14 th by Various Stakeholders.
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
Final Plan Background rao6]Xu4 X6NAt5 ckwoz4mzb CanZinco submitted initial Closure Plan in February, 2002 Nunavut Water Board hearing held in Arctic Bay.
Review of Interventions ____________ CanZinco Ltd.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Wisconsin’s New Approach to Land Use Controls Presented by Mark F. Giesfeldt Wisconsin Department of Natural Resources.
ISO Session 3 Environmental Management and Ethics in Management.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
Review of Meadowbank Water License Application: Public Hearing
Proposed Plan for No Further Action
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Agnico-Eagle Mines Ltd
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
South Carolina Perspective on Part 61 Proposed Revisions
Lecture 15 Environmental auditing
Indian and Northern Affairs Presentation NWB Final Hearing
Meadowbank Water License Renewal
SMA ENVIRONMENTAL FORUM 2018
WHALE TAIL PIT Expansion Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing

Overview Introduction INAC Regulatory Obligations Outstanding issues and recommendations by Water License requirement (G3-17) Conclusion

Introduction Water License NWB1NAN0208 (the Current License) was issued by the Nunavut Water Board (NWB) in October, 2002 Part G of the Current License sets guidelines for the documents required for the Nanisivik Mine Reclamation and Closure Plan (RCP) In accordance with Part G, CanZinco Ltd. (the Proponent) submitted the Nanisivik Mine RCP in March 2004 for NWB approval

Indian and Northern Affairs – Regulatory Obligations INAC Minister granted final approval of NWB issued Water License NWB1NAN0208 INAC monitors and enforces conditions of the Water License INAC administers 6 land leases and 4 quarry permits on Crown Land for the Nanisivik Mine

Status of Reclamation and Closure Plan review INAC RCP review based on the Human Health and Ecological Risk Assessment (approved November 2003), the Nanisivik Mine 2004 RCP, and all documentation received by the NWB, March-June, INAC believes the Proponent has provided a sound framework through which reclamation and closure activities can be implemented, however a few outstanding items remain

G-3 Final Closure and Reclamation Plan Reclamation timelines be submitted for NWB review and approval prior to implementation Any new use of facilities under the Current License will require a new Water License Application Land Leases and Quarry Permits be renewed and updated to reflect closure approvals

G-4 Engineering Design of Surface Reclamation Covers Proponent has committed to investigation of concrete slabs for cracking and potential contamination Additional information from these investigations to be filed with the NWB Final approval of G-4 dependant on NWB review and approval of the concrete slab investigation reports and any associated reclamation plans based on the findings

G-8 Waste Rock Piles and Open Pit Closure Plan Proponent has committed to providing additional geochemical characterization of West Open Pit and West Open Pit access road Additional information from these investigations to be filed with the NWB Final approval of G-8 dependant on NWB review and approval of the geochemical investigation reports and any associated reclamation plans based on the findings

G-9 Closure and Monitoring Plan INAC supports the current Monitoring Plan Support conditional on the Proponent expanding or extending the monitoring plan if required INAC suggests the Proponent provide a plan to ensure Arctic Bay residents are kept informed of monitoring results

G Phase III Environmental Site Assessment Proponent has committed to additional sampling around PCB storage and ANFO Plant INAC recommends that the Proponent provide a clearer commitment to the sampling for PCBs in the soils below the PCB storage facility Results of this additional sampling and any contingency plans to be submitted to the NWB for approval

G-14 Human Health and Ecological Risk Assessment (HHERA) INAC review based on the HHERA that was approved by the NWB in November 2003 If NWB determines that the HHERA and soil quality remediation objectives (SQROs) are open for change, all activities dependant on approved SQRO values should wait until these values are no longer subject to change

G-16 Waste Disposal Plan Information provided by the Proponent was insufficient with regard to long term mine stability and subsidence INAC requests a certified report by a Professional Engineer be submitted that addresses short and long term stability issues Certified Engineering designs are required for all mine portals and openings; designs are also subject to approval of Mines Inspector, Workers Compensation Board

G-17 Landfill Closure Plan Proponent to provide landfill contingency plans, and a framework under which these plans would be employed Proponent should not be permitted to remove any monitoring parameters without prior approval of the NWB

Conclusion INAC believes that the Nanisivik Mine 2004 RCP was developed according to the NWB process, good engineering practices, and government policies for mine abandonment and reclamation INAC recommends that the RCP be granted conditional approval, with the identified outstanding items subject to additional NWB review and approval