Leading the way; making a difference Latin American Panel November 5, 2014 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.

Slides:



Advertisements
Similar presentations
Leading the way; making a difference Gallagher Marine Systems Seminar July 24, 2013 INTERTANKO’S MAIN ISSUES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Advertisements

NORTH AMERICAN PANEL NORTH AMERICAN PANEL April 27, 2010 UPDATE ON US ISSUES UPDATE ON US ISSUES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
NORTH AMERICAN PANEL MARCH 19, 2007 UPDATE ON US LEGAL ISSUES JOSEPH ANGELO DIRECTOR, REGULATORY AFFAIRS AND THE AMERICAS.
Leading the way; making a difference Ballast Water Management Current situation and challenges Oslo, September 25 th 2012 Erik Ranheim Senior Manager Research.
Update on Ballast Water Management Latin American Panel Meeting Cartagena, Columbia November 1, 2011.
UPDATE ON THE REVISION OF MARPOL ANNEX VI LATIN AMERICAN PANEL March 12-13, 2008 Miami Beach, Florida.
UPDATE ON US BWM REQUIREMENTS
Leading the way; making a difference North American Panel March 17, 2014 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference Ballast Water Planning Workshop Lagonissi, Greece – 22 May 2015 Image courtesy of Samco Shipholding Pte Ltd Tim Wilkins.
1. Construction/Safety Standards for Small Craft Webinar Presentation January 2014 Transport Canada Associate Assistant Deputy Minister Safety and Security.
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
Internal Auditing and Outsourcing
Leading the way; making a difference Latin American Panel November 6, 2013 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
North American Emission Control Area
Environmental Regulatory Challenges Facing the Maritime Industry
Maritime Law Association Spring Meeting April 28-30, 2015
Canadian Experience in Implementing the North American Emission Control Area (ECA) Mexico City, Mexico May 19, 2015.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on new buildings - Role and authority of Class Speaker – Robert Smart LR IACS Council.
Mediterranean MoU 7th Committee Meeting on PSC Alexandria, EGYPT 31st January - 2nd February A Presentation by INTERTANKO Port State Control Capt.
CPF National By- laws Committee Meeting April
Leading the way; making a difference INTERTANKO Council November 15, 2012 UPDATE ON GHG MARKET BASED MEASURES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
U.S. Coast Guard Ballast Water Management (BWM) Requirements LT. Eddie Lesane U.S. Coast Guard Sector Charleston September 2006.
Ferries – Federal Legislative and Regulatory Outlook Edmund B. Welch Passenger Vessel Association.
LATIN AMERICAN PANEL NOVEMBER 1, 2007 UPDATE ON LEGAL MATTERS JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
LATIN AMERICAN PANEL OCTOBER 16, 2009 MARINE ISSUES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
1 Anti-fouling Systems—Port State Control Inspection Huang Tianbing Marine Biosafety Section Bangkok, June 2009 Views expressed in this presentation are.
MARITIME SECURITY STATUS REPORT JOSEPH ANGELO U.S. COAST GUARD.
Presentation to the HELLENIC MEDITERRANEAN PANEL HELLENIC MEDITERRANEAN PANEL (Athens, Greece - 23 October 2008)On US DISCHARGE STANDARDS -The NPDES Program-
A PRESENTATION TO THE SELECT COMMITTEE OF PUBLIC SERVICES 13 FEBRUARY 2008 BY NOSIPO SOBEKWA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT OF.
US Coast Guard Ballast Water Discharge Standard Final Rule
VIII INTERNATIONAL SEMINAR RUSSIAN MARITIME REGISTER OF SHIPPING MARINE ENVIRONMENT SAFETY MANAGEMENT JOSEPH ANGELO DIRECTOR REGULATORY AFFAIRS AND THE.
NORTH AMERICAN PANEL OCTOBER 7, 2009 INTERTANKO OVERVIEW REPORT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
U. S. Coast Guard ANS Program Update September 10, 2003 ANSTF Western Regional Panel Mtg Presented by LCDR Kathy Moore Chief, Environmental Standards Division.
Ballast Water Management DEPUTY MANAGING DIRECTOR
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
INTERTANKO LATIN AMERICAN PANEL MARITIME SECURITY: LATEST DEVELOPMENTS LATEST DEVELOPMENTS AT IMO JOSEPH J. ANGELO DIRECTOR, REGULATORY AFFAIRS AND THE.
Leading the way; making a difference Heidmar Marine Forum March 13, 2013 INTERTANKO OVERVIEW JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference GHG EMISSIONS FROM SHIPS OPERATIONAL EFFICIENCY STANDARDS FOR INTERNATIONAL SHIPPING LATIN AMERICAN PANEL Buenos Aires.
Leading the way; making a difference GREEN4SEA Athens Forum April 9, 2014 UPDATE ON BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Tripartite Meeting Tokyo, September 2007 Ship Recycling An Overview of Regulatory and Industry Developments Presented by INTERTANKO and ICS on behalf of.
Leading the way; making a difference EXPONAVAL – TRANSPORT 2014 December 3, 2014 Environmental Regulatory Challenges Facing the Maritime Industry JOSEPH.
Leading the way; making a difference Hellenic Mediterranean Panel April 10, 2014 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference Lunchtime Seminar October 10, 2012 Ballast Water Management JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Latin American Panel November 1, 2011 INTERTANKO OVERVIEW REPORT JOSEPH ANGELO MANAGING DIRECTOR.
Leading the way; making a difference Ballast Water Management State of Affairs Stamford, 23 rd March 2015 Tim Wilkins INTERTANKO Senior Manager - Environment.
Leading the way; making a difference North American Panel October 29, 2014 AIR EMISSIONS/ FUEL QUALITY JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference NOx Tier III requirements 1. 1.The NOx Tier III enforcement date of 1 January 2016 is kept for already designated.
LATIN AMERICAN PANEL OCTOBER 31, 2007 RECYCLING OF SHIPS JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference Ballast Water Management State of Affairs Hong Kong, 26 November 2013 Tim Wilkins INTERTANKO Senior Manager - Environment.
Leading the way; making a difference Ballast Water Management State of Affairs October 2013 Tim Wilkins INTERTANKO Technical Seminar Busan, 21 October.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
PSC INSPECTION Under the Ballast Water Convention.
AN UPDATE ON THE EVALUATION OF THE PERFORMANCE OF HEADS OF DEPARTMENT IN THE PUBLIC SERVICE Presentation to the Portfolio Committee on Public Service and.
Leading the way; making a difference Tokyo MoU Open Forum with Industry Ballast Water Sampling and analysis for Trial Use Tokyo, 28 October 2013 Tim Wilkins.
INTERTANKO North American Panel RDML Paul Thomas Assistant Commandant for Prevention Policy March 2016.
Peter M Swift CMA, March 2004 Trade Associations and how they can represent their members with governments, extra-government organizations, and enforcement.
Regulatory update on the BWM Convention
TANKER FORUM May 27, 2016 BALLAST WATER MANAGEMENT IN THE US
Environmental Compliance Challenges for the Future
BWM Updates William Burroughs |February 23, 2017 Houston, TX.
BWS for CME under the BWM Convention
The Shipboard Energy Efficiency Management Plan (SEEMP)
History and Status Tallinn, 18 May 2005 Leo Huberts
Environmental concerns
An update on ballast water management
Nick Bonvoisin Secretary to the Convention on the
The Optional Protocol Module 8.
Session Law Water Quality Permitting for Composters
North American Emission Control Area
Presentation transcript:

Leading the way; making a difference Latin American Panel November 5, 2014 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR

Leading the way; making a difference Desired Outcome for Ballast Water Management: Tanker industry is able to achieve compliance with current and future discharge standards (both regionally and internationally) Focus: 1. 1.Installation and Operation of appropriate and adequate ballast water management systems 2. 2.Compliance and enforcement – need strong, well defined and realistic international regulations Ballast Water Management INTERTANKO’s Five Strategic Plan

Leading the way; making a difference Why is Ballast Water Management a major issue for the shipping industry? 1. 1.INTERNATIONALLY – IMO Ballast Water Management Convention was adopted as a “prospective” treaty, i.e. It mandated standards that were not achievable when the treaty was adopted with ambitious implementation dates. 2. NATIONALLY IN THE US – US Congress passed two separate laws giving two separate federal government agencies, the US Coast Guard and the US Environmental Protection Agency (EPA), authority to regulate ballast water management Ballast Water Management

Leading the way; making a difference IMO Ballast Water Management Convention Adopted in 2004 Entry into force requires ratification by 30 countries, 35% world’s grt Currently, 43 countries, 32.54% grt Bahamas, China, Cyprus, Greece, Malta, Panama, Singapore or UK, each alone could bring the convention into force Argentina and Italy in the process – 34.2% Ballast Water Management

Leading the way; making a difference INTERTANKO (etal) Submission to MEPC 64 (Oct 2012) Explains the challenges being faced for effective implementation of the BWM Convention and to provide proposals to address those challenges Submission covered FOUR key areas: 1. 1.Guidelines for approval of ballast water management systems (G8); 2. 2.Availability of Ballast Water Management Systems (BWMS); 3. 3.Procedures for port State control 4.s 4.Survey and certification requirements Ballast Water Management

Leading the way; making a difference Port State Control – MEPC 65 (May 2013) Trial Period (initially for 3 years) following entry into force To trial sampling and testing procedures During this period, port states will ‘refrain from detaining a ship or initiating criminals sanctions in the event a BWMS does not meet the discharge standard’ (USA reserves its position) MEPC 67 (Oct 2014) adopts Guidelines for PSC with four stage approach Ballast Water Management

Leading the way; making a difference IMO Guidelines for PSC Stage 1 – Initial inspection. Focus on documentation and crew training to operate BWMS If there are “clear grounds” Stage 2 – More detailed inspection. Check to ensure that BWMS operates properly Stage 3 – Indicative sampling. Without unduly delaying ship, an indicative analysis of ballast water Stage 4 – Detailed analysis. If indicative sampling exceeds D2 standard by a certain threshold, a detailed analysis of ballast water can be taken Ballast Water Management

Leading the way; making a difference Implementation schedule (availability of BWMS) IMO Assembly Resolution (A.1088(28)) adopted, Dec 4, 2013 recommends governments: implement the Convention based on the entry into force date of the Convention considers ALL vessels constructed before entry into force as existing vessels existing vessels to install a BWMS at the first renewal survey (IOPP Certificate under Annex I of MARPOL) after entry into force of the Convention Ballast Water Management

Leading the way; making a difference BWMS Type Approvals Some progress at MEPC 64 with greater quantity and quality of information with increasing transparency HOWEVER, INTERTANKO Council decides, ‘still not adequate in providing tanker operators with reliable, dependable BWMS to install on board their tankers’ INTERTANKO submission to MEPC 66 with industry partner associations: –Amend G8 (salinity, temperature, organisms, sediment, flow rates, etc) – make it more robost! –Grandfathering to protect owners who have taken action –Send a signal to Governments on ratification Ballast Water Management

Leading the way; making a difference BWMS Type Approvals Outcome of MEPC 66, April 2014 Does NOT agree to amend G8 guidelines Requests IMO Secretariat to “explore the possibility of conducting” a study on the implementation of the ballast water performance standard (D ‐ 2 requirements) Agrees to include industry proposals to improve G8 guidelines in the remit of the study INTERTANKO and other shipping associations express dissatisfaction with this decision, would be unable to encourage further ratification of BWM treaty and has made further submission to MEPC 67 in October 2014 Ballast Water Management

Leading the way; making a difference BWMS Type Approvals Industry submission (MEPC 67/2/6) proposes adoption of MEPC resolution which includes: Comprehensive review of G8 guidelines which should commence BEFORE the Convention enters into force Issues that the comprehensive review should address Identifying requirements of “revised G8 guidelines” that should be made mandatory “Grandfathering” for the life of the ship BWMS approved under current G8 guidelines Review of port state control provisions of Convention Ballast Water Management

Leading the way; making a difference BWMS Type Approvals Outcome of MEPC 67, October 2014 Adopts an MEPC Resolution which agrees 1. To immediately begin a comprehensive review of G8 guidelines (and Plan of Action to do so) 2. Shipowners that have installed BWMS approved to existing G8 “should not be penalized” 3. Port States should refrain from applying criminal sanctions or detaining the ship, based on sampling during the trial period (US reserves its position) Agrees that proposals to implement decision to not penalize shipowners should be submitted to MEPC 68 Ballast Water Management

Leading the way; making a difference Final regulations issued March 23, 2012: BWE prior to discharge in US waters (12 miles) BWM Plan and record keeping BWM discharge standard (same as IMO), review in 4 yrs Compliance schedule for BWMS (similar to IMO), (no intent to align schedule with Assembly Resolution) Acceptance of “Alternative” AMS BWMS for 5 years BWMS not required if no discharge in US waters Ships may request an extension to compliance date for BWMS Ballast Water Management – USCG

Leading the way; making a difference INTERTANKO Assisting Members with USCG regulations Implementation Schedule Decision Tree … Ballast Water Management – USCG

Leading the way; making a difference USCG Ballast Water Decision Tree

Leading the way; making a difference US Coast Guard INTERTANKO assisting Members Implementation Schedule Decision Tree Model Extension Request (MER) Letter Ballast Water Management – USCG

Leading the way; making a difference US Coast Guard Assisting INTERTANKO Members Implementation Schedule Decision Tree Model Extension Request (MER) Letter Clarification of USCG Rules extension requests (allow new tankers to have an extension until the ship’s first drydocking after the first USCG BWMS has been approved) flexibility in submitting applications inside the 12 months submission period Ballast Water Management – USCG

Leading the way; making a difference US Coast Guard – Extension requests January 1, 2016 extension date given to more than 250 ships whose drydocking was scheduled for 2014 January 1, 2016 date was chosen to encourage shipowners to put pressure on BWM manufacturer to obtain CG approval January 1, 2017 extension given to ships whose drydocking was scheduled for early 2015 CG recognizes that January 1, 2016 date may generate second round of extension requests CG wants to have dialogue with shipowners as to whether installation of BWMS must be done in drydocking Ballast Water Management – USCG

Leading the way; making a difference US Coast Guard – APPROVED BWM Systems 10 BWMS manufacturers have submitted “Letter of Intent” to pursue USCG approval For proprietary reasons, USCG cannot tell us which BWMS manufacturers are currently seeking pursuing USCG approval INTERTANKO has contacted BWMS manufacturers to determine which of them have submitted Letter of Intent (results on INTERTANKO web site) Only after the testing is completed and the results have been evaluated, will a BWMS manufacturer then submit an application to the USCG for approval of their BWMS Ballast Water Management – USCG

Leading the way; making a difference US Coast Guard – APPROVED BWM Systems To date no BWMS manufacturer has reached that stage in the process, but the USCG indicated that they expected to have a USCG approved BWMS “sometime in 2015” CG hopes it can announce a few at the same time, but is not going to hold up the announcement of the first one to wait for a “long time” to include the second or third one CG indicates they understand potential installation scheduling problem once a BWM system is CG approved CG indicates they will be “pragmatic” in requiring when a ship calling at US ports must have a CG approved BWM system installed Ballast Water Management – USCG

Leading the way; making a difference EPA Vessel General Permit issued December 19, 2013 To a large extent EPA VGP requirements are the same as USCG (discharge standard, compliance schedule, etc.) Approval of BWMS is not required BWMS monitoring required (functionality, equipment calibration, effluent, biocides) New ship (keel laid after December 1, 2013) is required to install a BWMS to comply with the VGP, i.e. no acceptance of USCG extension provision in the VGP EPA /USCG MoU – EPA Enforcement Policy, 27 Dec Vessel with USCG extension is non-compliant (if discharges in US waters – 3 miles), but EPA regards as a low-enforcement priority, provided all other regs are met Ballast Water Management – USEPA

Leading the way; making a difference Potential issue with EPA Enforcement Policy?? Charter party agreements require tanker to be in compliance with all applicable laws and regulations Tanker that receives CG extension would be in compliance with CG requirements Tanker that has CG extension and discharges ballast water within US waters (3 miles) would be in violation of EPA Vessel General Permit Thus far, not aware of any comments from oil majors or charterers on this issue Ballast Water Management – USEPA

Leading the way; making a difference EPA Guide for Sampling and Monitoring All vessel operators covered under the VGP are required to submit an annual report by 28 February 2015 (for activities conducted through 31 December 2014) Vessels delivered after 1 December 2013 are also required to perform analytical monitoring of ballast water, bilgewater, graywater, and exhaust gas scrubber wastewater and submit results to EPA EPA has issued a guide on Vessel Discharge Sample Collection & Analytical Monitoring which can be found on the INTERTANKO web site Ballast Water Management – USEPA

Leading the way; making a difference Approved Systems IMO Type Approved (G8)51 US Coast Guard approved 0 Alternate Management Systems (AMS)46 Ballast Water Management

Leading the way; making a difference MUCHAS GRACIAS!