Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Work Package 6: Performance Specification Ian McCrea.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
European design study on Neutrinofacilities - Euronu within FP7.
European Commission eContent Towards the Workprogramme.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
An International Scoping Study of a Neutrino Factory & Super-beam Facility.
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MUTAC04 Alain Blondel, 28/4/2004 Activities towards future accelerator-based neutrino facilities in Europe 1. little historical perspective 2. general.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
International cooling experiment 1 Towards an International Cooling Experiment Motivations: --Ionization cooling is an important ingredient in performance.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 Research Infrastructures in FP6 European Commission - Directorate-General for Research 30/10/2002 Support for Research Infrastructures in FP6 Daniel.
Muon Collaboration Meeting Steve Geer MUTAC Review, Jan, 2003 Muon Collaboration WELCOME.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
Accelerator R&D for Future Neutrino Projects
Collaboration Board Summary
Infravation Consensus Meeting Sept 2014
The Way Forward ISS to IDS
European Detector R&D: AIDA
Outline: Why now ? What ? How ?
Report on EUCARD WP6: MICE Transnational Access (TA)
Accelerator R&D for Future Neutrino Projects
FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan
as of today 123 registered participants
Overview of working draft v. 29 January 2018
W. T. Weng Brookhaven National Laboratory
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
ECFA recommendations (September 2001:)
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework 6 Design Studies Neutrino Factory & Superbeam Design Study Neutrino Factory & Superbeam Design Study

Introduction Two feasibility studies so far in US: FS 1: FNAL  performance not good enough  too expensive FS 1: FNAL  performance not good enough  too expensive FS 2: BNL  performance good enough  still too expensive FS 2: BNL  performance good enough  still too expensive FS 3: RAL? - Take FS2 and reduce cost - A lot of progress already made FS 3: RAL? - Take FS2 and reduce cost - A lot of progress already made One feasibility study in Japan - One feasibility study in Japan - based on FFAG - produced in 2002 Zero feasibility studies in Europe

Introduction Before/during NuFact’03: time for “3 rd ” Design Study Before/during NuFact’03: time for “3 rd ” Design Study Should be world-wide this time Should be world-wide this time Parallel discussion and plenary talk Parallel discussion and plenary talk Steering group created: US:Steve Geer Bob Palmer Mike Zisman Steering group created: US:Steve Geer Bob Palmer Mike Zisman Japan:Yoshi Kuno Yoshi Mori Kenzo Nakamura Europe:Alain Blondel Rob Edgecock (chair) Helmut Haseroth Three (phone) meetings so far Three (phone) meetings so far

WDS Status Propose to “create” “6” “sub-collaborations” Propose to “create” “6” “sub-collaborations” Sub-collaborationSummary of Task 1Proton DriverDefinition of critical parameters and R&D on components 2TargetryR&D on solid and liquid targets to prove viability; R&D on pion collection 3MICEDemonstration and study of ionisation cooling 4FFAGsStudy of FFAG acceleration, proof of principle and R&D on critical components 5Design and engineering studies Cost and performance optmised Neutrino Factory Design 6Physics and detectors Define parameters for accelerator & detector, inc. detector cost Steering Groups being proposed (for those without one)

EC FP6 Design Studies FP6 3 blocks of activities: Integrating European Research Structuring the ERAStrengthening the ERA Research and Innovation Human resources & mobility Research infrastructures Science and Society Transnational Access Integrating Activities Communication Network Development Design Studies Construction of New Infrastructure Accompanying Measures CARE BENE HIPPI

FP6 Design Studies HIPPI – JRA: improving existing infrastructure HIPPI – JRA: improving existing infrastructure Design Studies: FS and TPW on new infrastructures Clear European dimension and interest Must “systematically explore EIB and Structural Funds” Infrastructure can be outside EU, if EU participates Upgrade to existing infrastructure, if replaces new

FP6 Design Studies Feasibility Studies: “will aim at laying the conceptual foundations of a potential new or enhanced infrastructure. This could consist in the basic feasibility study of a specific new facility or in exploring a new fundamental technology or technique underpinning a whole new concept. Alternatively, a feasibility study could cover the detailed engineering design of a proposed infrastructure, in particular in relation to its most technologically advanced aspects (i.e. excluding the detailed design of standard elements of the new infrastructure). “ Technical Preparatory Work: “will cover the development and testing of components, subsystems, materials or techniques (including dedicated software) that are critical for the future development of a new or enhanced infrastructure. Support will however not be provided for preparatory work based on existing or proven techniques or technologies, nor when it aims at reproducing available components or materials.” NB Contributions to capital investments are excluded

FP6 Design Studies In first call: 70M€ In first call: 70M€ EC contribution/DS: 1-10M€ EC contribution/DS: 1-10M€ Maximum EC contribution: 50% Maximum EC contribution: 50% Total cost has to be justified in proposal Total cost has to be justified in proposal Duration of DS: 24 to 48 months Duration of DS: 24 to 48 months Funding: Timescale: Call for proposals:11 th November Submission deadline:4 th March 2004, 5pm Evaluation/interviews:June 2004 Results:July 2004 Contract negotiations end:September 2004 DS start:end 2004/start 2005

NF FP6 Design Study Proton Driver TargetryMICEFFAGsDesign Study Physics Studies Proton Driver MICEFFAGsDesign Study Physics Studies TargetCollect n Proton Driver >0.2 GeV MICEFFAGs?Design Study Physics Studies TargetCollect n Two Conveners Four Conveners Two Conveners

Steering Group Director:Ken Peach Coordinator:Rob Edgecock Japanese representative:? US representative:Mike Zisman Proton Driver:Roland Garoby Chris Prior Targetry:Roger Bennett ? MICE:Alain Blondel ? FFAGs:Francois Meot ? Design & Engineering:Helmut Haseroth Vittorio Palladino Physics:Pilar Hernandez Mauro Mezzetto

Timescales Submit proposal:4 th March 2004, 5pm! Finish proposal:19 th February 2004 Start writing final version:15 th January 2004 Final editing starts:12 th February 2004 Firmed up plans, outline of:24 th December 2003 proposal, 1 st cost and schedule 1 st plans/WP:11 th December 2003 Work Package teams formed:28 th November 2003 Today Form Steering Group:Today Today Form Work Package teams:Today Feedback from Brussels Review of plans: 18 th /19 th December Proposal preparation Final review of proposal 18 th February

Funding Assume DS will be 4 years  end 2008 Can get 10M€ from EC Must find at least the same from existing sources Need to check FP6 rules, e.g. MICE beam and inf? “Third party” funding? Matching funding/Work Package or total? Need to check what “capital investments” are Within these limits, there are no limits!

Next Steps Get approval of plans from EMCOG- RE Get approval from ESGARD- RE Contact with Brussels- RE Determine requirements at RAL- PRN/RE Form Steering Groups- RE et al Form teams- SGs Develop plans for proposal- All All must start now!