F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Single cell coordination. Single Cell Cavity Activity Outline 1.ANL EP optimization (TE1AES005) 2.R&D cavities A. Tumble, 2 cavities (TE1ACC004, NR-6,
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Cornell SRF New Materials Program Nb 3 Sn Development Sam Posen and Matthias Liepe Cornell University TTC Meeting 6 December 2011 Beijing, China.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Single cell coordination. Single cell compared to 9-cell 1.Limited number of cavities. 2.Unlimited number of activities. 3.Does not have fixed recipes.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Single cell coordination. Single Cell Cavity Activity 6-month plan 1.ANL EP cavities (TE1AES005, TE1ACC001) 2.R&D cavities Tumble, 2 cavities Laser re-melting,
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Electron Microscopy and Surface Analysis of MIC Deposits on HPR Flanges Amanda Bastidos University of Texas at El Paso GEM Fellow 5 August 2009 Technical.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
C.Cooper Argonne HPR Contamination. C.Cooper Problem Upon removal of the filter that is at the bottom of the spray nozzle for the Argonne HPR System a.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Cornell Updates Commissioning of T-map for ILC single cell starts.
Strategy and Status of Reference Cavities for European XFEL
Electropolishing of Dressed ILC 9-cell Cavity
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
STF Plan of gradient improvement
New Cavity Techniques and Future Prospects
for the FNAL/ANL, JLab, and Cornell cavity teams
Peng Sha Institute of High Energy Physics, CAS
ELLIPTICAL SCRF CAVITIES
S0 Status report from KEK
European-XFEL summary: Cavities/Modules performance
Production Cavities in progress
Highlights from EU Global Design Effort
IHEP Cryomodule Status
LCLS-II High Q0 Cavities: Lessons Learned
Vertical Test Results of 9-Cell Cavities for LCLS-II
The LCLS-II HE High Q0 and Gradient R&D Program
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

f Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD

f Fermilab Outline HPR MIC Problem and Lessons Learned Cavity Handling at ANL/FNAL Current Status of One-cell Program & Results One-cell Program Plans Current Status of Nine-cell Program & Results Nine-cell Program Plans Summary October 1, Linear Collider Workshop of the Americas 2

f Fermilab HPR MIC Problem “MIC” = Microbiologically Influenced Corrosion Likely ongoing, but unnoticed problem. Brown film on HPR’d components yielded first signs. Dozens of rinses prior to residue L SS End Flange Al/Mg ‘Diamond’ Flange Seal Mysterious brown residue film October 1, Linear Collider Workshop of the Americas

f Fermilab HPR MIC Problem Initially suspected LEWA pump failure. High carbon content in SEM analysis of seals. Removed heads and found bacterial nodules. 4 LEWA HPR pump and manifolds.Teflon double diaphragm and bacterial nodules. Bacterial Nodules October 1, Linear Collider Workshop of the Americas

f Fermilab HPR MIC Problem Final Filters at HPR wand = 0.04 um polysulphone Left filter = new Middle filter = 12 hours HPR and 1600 gallons UPW Right filter = 100 hours HPR and 13,200 gal. UPW 5October 1, Linear Collider Workshop of the Americas

f Fermilab HPR MIC – Lessons Learned Properly specify all S.S. plumbing –Seamless 316L stainless tubing where possible (do not use pipe!) –Proper welding specifications with material certs. –Internal surface finish of 20 u-in or better from honing, EP, and passivation. –Use fabricators with experience in sanitary SS plumbing Inspect your hardware prior to installation! –Use borescope if necessary. Monitor final filters routinely –If easy to do without contaminating system, look at least weekly. Redundant filtration provides a safety net. 6October 1, Linear Collider Workshop of the Americas

f Fermilab Cavity Handling – Program Processing/testing delays partly due to VTS shut down (thru 3 rd week of October.) and…. Formalization of all cavity handling, transport, and storage in every facility. Controlled Procedures + Cavity Tracking System –Personnel Training Course –General guideline documents –Facility Specific Procedures eduresPage.asphttp://tdserver1.fnal.gov/tdweb/qm/OperationProc eduresPage.asp Documents and training may be shared with vendors and partners. 7October 1, Linear Collider Workshop of the Americas

f Fermilab 1.3 GHz One-Cell Program 8October 1, Linear Collider Workshop of the Americas ANL/FNAL cleanroom starts G. Wu-SRF09 Test 7 TE1ACC002 handled with new pumping station and poor evacuation control Test 14 FE caused by poor vacuum connection before 120 C baking Test 18 First ABLE immersion EP with poor evacuation control 1-cell Field Emission under control at ANL/FNAL

f Fermilab 1.3 GHz One-cell Plans 9October 1, Linear Collider Workshop of the Americas Current R&D program avenues –Tumbling at FNAL + light EP + HPR –Pit studies – Light EP + HPR –Vendor polishing efforts –HPR or Light EP+HPR 8 new one-cell cavities arriving from PAVAC –Cavity vendor qualification Full surface processing recipe VT verification –May send others out to ARRA vendors CMP & alternative polishing techniques Bulk EP industrialization Monthly program goals over next 6 months. –2-4 EP’s HPRs –3-4 clean assemblies & tests utilizing VTS and A0

f Fermilab 1.3 GHz 9-Cell Program 10October 1, Linear Collider Workshop of the Americas 14-h HPR 21-h HPR 14-h HPR Optimization started 4/21/ h HPR Slow evacuation not achieved due to valve sensitivity Improved 9-cell effort started 3/14/ cell Preliminary: Field emission was mostly due to vacuum difficulties G. Wu-SRF09 New let-up/pump-down manifold in process!

f Fermilab 1.3 GHz 9-Cell Plans 11October 1, Linear Collider Workshop of the Americas Continue commissioning for 9-cell cavities –Build statistics base. –TB9ACC017 and ACCEL6 will be tested multiple times Light EP, HPR, clean assembly Should be cycled and tested a minimum of 3 times each. –Commissioning will be primary effort over next quarter+ Depending on yield of commissioning effort, new cavities may be processed through ANL/FNAL SCPF. Available processing slots will be given to 6 new RI cavities arriving with bulk EP already performed.

f Fermilab Summary MIC problems hopefully solved. New manifolds to be installed early Oct. Formal cavity handling and tracking program implemented. Some work remains, but process well in hand. Vigorous 1-cell program. Many areas of exploration useful to materials and processing R&D. Promising results with high yield. 9-cell commissioning will finally be in full swing. Statistics over next quarter critical to pre- production push. Many new cavities arriving. ANL/FNAL SCSPF staff (some new faces) will be busy. Course # FN000434/CR Safe Handling of SRF Cavities 12