DOM Electronic Reliability Progress Report S.Colonges 09/04/2014.

Slides:



Advertisements
Similar presentations
Pearson Education Ltd. Naki Kouyioumtzis
Advertisements

The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
EES: Burn – in test Eliminate infant mortality: Not possible to detect it with AOI, FPT, X-ray or ICT! 1.
Reliability Extending the Quality Concept. Kim Pries ASQ  CQA  CQE  CSSBB  CRE APICS  CPIM Director of Product Integrity & Reliability for Stoneridge.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
CIRCUITS, DEVICES, AND APPLICATIONS Eng.Mohammed Alsumady
NEPTUNE Power System Low Voltage Circuit Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
Product Design and Qualification (Validation) Testing for HPHT Systems
INTRODUCTION OF BTI PRODUCTS STRATEGY ON SELLING BTI This presentation is designed to : Aid you in selling BTI products Understanding the advantages.
DC-DC Buck Converter in Inner Detector Environment
October 2010 When should I consider a DC/DC Power Module Regulator?
Items for Discussion Chip reliability & testing Testing: who/where/what ??? GBTx radiation testing GBTx SEU testing Packaging – Low X0 options, lead free.
S1.6 Requirements: KnightSat C&DH RequirementSourceVerification Source Document Test/Analysis Number S1.6-1Provide reliable, real-time access and control.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
CMS Upgrade Workshop November Fermilab POWER DISTRIBUTION SYSTEM STUDIES FOR THE CMS TRACKER Fermilab,University of Iowa and University of Mississippi.
February 26, Fretting Corrosion… Is It What We Have? ● from Molex sales engineer, February 20, in response to my question about the increase.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
© 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Mission Assurance Concepts and Discussion NEPTUNE Power CoDR Richard Kemski June 10, 2002.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Vegard Joa Moseng – Student meeting. A LITTLE BIT ABOUT SYSTEM RELIABILITY:  Reliability: The ability of an item to perform a required function, under.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
Product Development Chapter 6. Hardware & Software Techniques Block diagram the system (Visio) Redundancy  Active: failure of one parallel component.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
CBM Optimization – Complex items An item is a group of components that is convenient to monitor and analyze together Equipment units, as defined in the.
Taeyeon Kim. Page  2 1.Vibration test plan for KHU 2.Harnessing 3.STEIN Housing 4.Future work.
DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory.
Reliability Assessments Scope Per paragraph of the MAR and PAIP “ When necessary/prudent or when agreed upon with the GSFC Project Office, Glast.
Reliability Analysis - Overview 4 main components considered Glove Micro - PIC24FJ128GA310 Base Micro - PIC18F87K90 3.3V Power Supply - CC3-0503SR-E 5V.
© Vibro-Meter Confidential and subject to Export Control as per Front PageGEnx EMU DDR 18 November 2008Section 2.5 PSU Slide 1 EXPORT CONTROL THE INFORMATION.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Reliability Applied to KM3NET
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Bryan McDonnel Michael Mize Ryan Taylor (presenter) Miles Whittaker
Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting April 2009.
DOM MB Rev 4.2 to Rev 5.0 Changes April 26, 2004 Gerald Przybylski Lawerence Berkeley National Laboratory.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
1 Copyright by PROFIBUS Center Nederland
Failure Modes, Effects and Criticality Analysis
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Digital Signal Processor HANYANG UNIVERSITY 학기 Digital Signal Processor 조 성 호 교수님 담당조교 : 임대현
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
PCIM Europe 2016 Power Conversion and Intelligent Motion
Digital System Design Digital Design and Computer Architecture: ARM® Edition Sarah L. Harris and David Money Harris.
SDM5A-M 7P/180D LP2(H).
Failure Mechanisms of Composite Cores for High Temperature, Low-Sag (HTLS) Conductors We have done research on two types of composite cores for HTLS conductors.
Product Development R. Fries
Fides and RAMS training Km3Net
STANDARD WR STRAW-MAN ARCHITECTURES FOR PHASE II & WRS RELIABILITY
PPM-DOM. SPM DOM LCM SS-part ILxx
RELIABILITY EVALUATION OF GRID CONNECTED PV SYSTEM
Martin Shaw – Reliability Solutions
Peer Review Agenda (Suggested).
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Martin Shaw – Reliability Solutions
Managing and Improving Reliability across the Entire Life Cycle
Quadro DRF 40E NF How to fix the display flickering.
RELIABILITY Reliability is -
Updates on the Silicon Tracker 2S Module
Total 1,675 € PMTs ~ 16 x 800€ ~ 12,800€ Ok ~ 10% of PMT cost, but
LIU BWS Firmware status
Presentation transcript:

DOM Electronic Reliability Progress Report S.Colonges 09/04/2014

Progress Report Board analyzed: BoardFIT analysisDerating analysis FMECARemarks CLB V2Fides 2004 / Fides 2009 No (TBD)Organization?Cerramic capacitors Octopus (large)Fides 2009Yes (without connectors…) Organization?Connectors Octopus (small)Fides 2009IdemOrganization?Connectors BaseFides 2009YesOrganization?Capacitors ASICS Power BoardFides 2009No (TBD)Organization?Derating problems. Mechanical problems

Octopus small Board PCA9548  higher FIT  Temperature elevation TBC Failure risk (15 years)  F(t) = 1 – e - t  6,4% Connectors: -Screw lock small connectors -Mechanical connector reliability -Mechanical weakness point on Molex edge

Octopus large Board -PCA9548  higher FIT  Temperature elevation TBC Failure risk (15 years)  F(t) = 1 – e - t  6,4% Connectors: -Screw lock small connectors -Mechanical connector reliability -Mechanical weakness point on Molex edge

Base Failure risk (15 years)  F(t) = 1 – e - t  26% -Capacitors  change rating (case) for higher contributors ? (case 1206 /100 nF higher contributor) -Degraded modes  number of PMT fails allowed / DOM? - ASIC ESS  TBC

Power Board Failure risk (15 years)  F(t) = 1 – e - t  75,7% -Derating  A lot of capacitors overrated!  Change design  new derating analysis -CEM analysis? (inductors shielding?) -Mechanical weakness for DC/DC converters modules

CLB V2 Failure risk (15 years)  F(t) = 1 – e - t  26,9% -Derating  capacitors (22µF, 100µF and 4,7µF)  Change design?  new derating analysis  Connectors  mechanical weakness point

Global results -Failure probability (15 years) for the whole DOM  88,4% with PBV2  52,7% without PBV2

Results update Accelerating parameters:  Process, application, ruggedizing Derating analysis update FMECA  degraded modes? (failure effects) / FDIR Reports

Open questions Stress screening / ESS Connectors  integration procedure / vibrating qualification? Fixing? Prototypes tests reports

More slides…

Base

Octopus small Board

Octopus large Board

CLB V2 Board