Seismic Isolation System Prototypes Seismometer Pod IDR 12-23-03 Ref: 20008277-A.

Slides:



Advertisements
Similar presentations
Implementation Architecture
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Gripper Designs By Pragnay Choksi. INTRODUCTION Hands of robots referred to as Grippers No single design is ideal for all applications.
Intake & Exhaust Team James Hogge Rebekah McNally Alisa Phillips Henos Woldegiorgis Front Upright Team Lloyd Outten Joseph Perry Rear Upright Team Josh.
Elena.Litvinenko CBM Collaboration Meeting Dubna 17 Oct Dipole magnet for CBM: current status P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov,
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
Background Current Status Future Plans. Agenda Background First Steps Current Status Future Plans Joomla Basics Questions 2.
LIGO-G070xxx-00-M December 19, 2007 Single Stage ISI Electronics Overview Ben Abbott Mohana Mageswaran December 19, 2007.
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M Advanced LIGO1 Finite Element Modeling Requirements Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—3-1 Implementing a Scalable Multiarea Network OSPF- Based Solution Lab 3-3 Debrief.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
CPM -200: Principles of Schedule Management IPM 2002 Fall Conference PMI-College of Performance Management – Professional Education.
P14542: Vertical XY Camera Rig Subsystems Design Review Oct
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
LSU 05/13/2004Mechanical Design Guidelines1 Ballooning Unit, Lecture 4.
 Computer Aided Software Engineering  The use of a computer system to aid in the creation of software  Used to reduce the amount of time required for.
Rigid Bodies II: Equilibrium
22nd March 2005 LIGO-G R Passive attenuation for the LIGO Output mode cleaner; HAM SAS R. DeSalvo, S. Marka, V. Sannibale, A. Takamori, C. Torrie,
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Objectives Pick one final design (Only discussions crucial to design choice will be allowed to occur) Note that many exact locations for many.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
System Identification for LIGO Seismic Isolation Brett Shapiro GWADW – 19 May G v1.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
Slide #: 1 Chapter 4 Equilibrium of Rigid Bodies.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Shear Test Assembly update
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
Advanced LIGO Lateral/Tilt Mechanical Coupling Study Ken Smith January 8, 2004 Ref: A.
Software Engineering Lecture 9: Configuration Management.
AAE450 Spring 2009 Attitude Determination in Low Earth Orbit Description: Determine Attitude Accuracy Upper and Lower Bound Recommend Addition of Sun Sensor.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Hydraulic Pressure Control
OHT 18.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software configuration, software configuration items and software configuration.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Introduction to PROJECTION. PROJECTION is defined as an image or a drawing of an object made on a plane.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review CCAT Enclosure Nathan Loewen AMEC Dynamic Structures Ltd. 13 July 2005.
RBS 6000 MICRO RRU update Feb., 2013
First of all we will remind some numbers:
Motion Stage for Optical Coherence Tomography
The 11T cryo-assembly: summary of design and integration aspects
Hall C Down Stream Beam Pipe And Dump Interface Design
Hydraulic Pressure Control
Systems Engineering Bob Goeke.
Software Development Process
Robofish Charging Station (RCS)
LARP Phase II Secondary Collimator RC-1
Experimental equipment Edgar L. Black February 17, 2019
Final Project Review -Senior Design 2
Department of Physics, University of Michigan
Joint Application Development (JAD)
SNS PPU Cryomodule Space Frame
Presentation transcript:

Seismic Isolation System Prototypes Seismometer Pod IDR Ref: A

12/23/ AASI-2 Objectives Present preliminary designs of the seismometer pods –Task 1 of the SEI Prototypes Implementation Plan ( A) Obtain technical concurrence that the preliminary designs are complete enough to begin HAM and BSC configuration tasks –External dimensions of pods –Interfaces to supporting structure –Estimated mass

12/23/ AASI-3 Agenda Design Summary Preliminary Pod Designs Open Issues

12/23/ AASI-4 Design Summary As presented in ASI’s value engineering presentation, ASI’s pod design concept was predicated on round vs. rectangular configuration –Take advantage of heritage UHV technologies Conflat Wire-Seal Pod designs presented will be common to both HAM and BSC prototypes –Stage 1 Single pod concept is now three (3) individual pods –Flexibility in packaging & alignment –Stage 2 Single pod design similar to that presented at the value engineering presentation

12/23/ AASI-5 Preliminary Pod Designs – Stage 1 STS-2 Design Assumptions –Mounting plane is based upon a 16.50” OD Conflat with rotating flange –Lock actuator design is based upon the revised locker database using “bolted” interface –STS-2 Electrical interface of uses a 90 degree connector –External UHV connection is a 4.50” OD Conflat

12/23/ AASI-6 STS-2 POD 16.5” CONFLAT WEIGHT: 136 LB 16.5 IN IN

12/23/ AASI-7 STS-2 POD WITH L-4C 19.56” WIRE-SEAL

12/23/ AASI-8 Preliminary Pod Designs – Stage 1 L-4C Design Assumptions –Mounting plane is based upon a 6.00” OD Conflat –Internal Electrical interface uses a Size 12 connector shell –External UHV connection is a 2.75” OD Conflat

12/23/ AASI-9 L-4C POD 6” OD CONFLAT WEIGHT: 17 LB 8.85 IN 6 IN 1.95 IN

12/23/ AASI-10 Preliminary Pod Designs – Stage 2 GS-13 Design Assumptions –Mounting plane is based upon a 10.00” OD Conflat –Internal Electrical interface uses a Size 12 connector shell –External UHV connection is a 2.75” OD Conflat Two pod styles: “top” and “bottom” mount –Selection of best style will be made during configuration task

12/23/ AASI-11 GS-13 POD 10” CONFLAT BOTTOM MOUNT WEIGHT 83 LB IN 10 IN

12/23/ AASI-12 GS-13 POD 10” CONFLAT TOP MOUNT WEIGHT: 88 LB IN 10 IN

12/23/ AASI-13 Summary Open Issues –ICD Status STS-2 GS-13 L-4C Review Action Items (AI’s)