AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.

Slides:



Advertisements
Similar presentations
Jan. 15, Safety Board Review (Rev D) Safety Board PCB Review (Rev D) Eric Warmbier.
Advertisements

Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
ISUAL Test Verification Matrix H. Heetderks. TRR December, 20002NCKU UCB Tohoku ISUAL Verification Matrix Heetderks Verification Matrix -- Imager Related.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
ISUAL Spectrophotometer Overview S.Harris. NCKU UCB Tohoku Spectrophotometer S. Harris IFR 5 Mar Spectrophotometer Description Six Channels Identical.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
ISUAL Mass Memory Robert Abiad. NCKU UCB Tohoku Mass Memory R. Abiad CDR 9-10 Jul Outline Description Requirements Interfaces Block Diagram Usage.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Main Electronics Package
ROCSAT-2 Current Status of ISUAL Project Yeou-Shin Chang of NSPO Jyh-Long Chern of NCKU Henry Heetderks of UCB October 3, 2001.
ISUAL HIGH VOLTAGE SUPPLIES P.BERG. CDR 9 JULY 20012NCKU UCB Tohoku High Voltage Supplies P. Berg HIGH VOLTAGE P0WER SYSTEM OVERVIEW HIGH VOLTAGE IS REQUIRED.
ISUAL Sprite Imager Interface and Status Review Stewart Harris.
For Official Use Only; Information herein NOT Approved for Export; Contains Proprietary Protected Information; NOT for Public Release 1 WIPER PDR Stanford,
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.
Computer parts Kara Ross. Mother board A motherboard (sometimes alternatively known as the mainboard, system board, planar board or logic board[1]) is.
ROCSAT-2 Current Status of ISUAL Project Yeou-Shin Chang of NSPO Jyh-Long Chern of NCKU Henry Heetderks of UCB October 3, 2001.
Rain Detection System for Power Windows in Automobiles
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
ISUAL Spectrophotometer H. Heetderks. SDR 7 Jun 20002NCKU UCB Tohoku Spectrophotometer H. Heetderks Spectrophotometer Description Six Channels Identical.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
0808/0809 ADC. Block Diagram ADC ADC0808/ADC Bit μP Compatible A/D Converters with 8-Channel Multiplexer The 8-bit A/D converter uses successive.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
ISUAL System Design Summary H. Heetderks / S. Harris.
Cosmic Microwave Technology, Inc.
Instrumented Walker Skyler Bullington Tommy Frankenberger Larson Stacy
Markus Friedl (HEPHY Vienna)
Bill Donakowski Mechanical Engineer UCB/SSL
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
ISUAL Product Assurance
ISUAL Associated Electronics Package
Instrumented Walker Status Update 2
Hawkeye Mechanical Design Snapshot
Systems Engineering Bob Goeke.
PIC18F458 Analog-to-Digital
EVLA MONITOR & CONTROL CDR
ECE 477 Final Presentation Team 2 Spring 2012
Control System Summary of Changes Since PDR
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Presentation transcript:

AEP Mechanical and Power System H. Heetderks

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System Consists of Six Circuit Boards, each Surrounded by an Aluminum Frame –Low Voltage Power Converter is on top to conduct heat to thermal radiator –Power Controller, Data Processing Unit, Instrument Data Controller, Mass Memory, and Data Compression Module follow in order –Base Plate mounts unit to spacecraft deck Electrical Connections made with Stacking Connector on each Board –Avoids need for Mother Board Thermal Radiator attaches to feet on top of assembly Walls of Frames are.200 inches thick to provide radiation shielding and a heat path to the thermal radiator The Stack is held together with 10 Skewer Rods

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 3 AEP Mechanical Assembly

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 4 Exploded View of AEP Assembly Bottom Plate DCM Mass Memory Instr Data Controller DPU Power Controller LVPS

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 5 AEP Mechanical Fabrication Status Mechanical Part Drawings are Complete and in Configuration Control Assembly Drawings are nearly complete All Machined Parts for both ETU and Flight Unit including Frames and Top and Bottom Plates are complete Parts have been fit tested and put in Flight Stores

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 6 Power System Requirements System provides 21 switched and current limited services, each with a voltage and current monitor Power on reset circuit detects brown out on primary side Filtering and shielding at outputs to reduce converter noise seen by instrument Filtering on inputs to protect system against CS-06 EMC test Fully redundant DC-DC converters Includes Analog Multiplexor and ADC to digitize 128 channels including power system voltages and currents

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 7 Power System Requirements, Switched Outputs

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 8 Analog Multiplexer and ADC Inputs (1)

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 9 Analog Multiplexer and ADC Inputs (2)

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 10 Power System Block Diagram

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 11 Schematic of Low Voltage Converter Board

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 12 Schematic of Power Controller Board

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 13 Schematic of Limiter, Monitor, Switch Circuit

CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 14 Power System Development Status ETU Power System Fabrication and Debug is nearly complete Flight Unit Mechanical Parts Complete and in Stores All EEE Parts in House for Flight Unit Fabrication Flight Printed Circuit Boards will be Etched following ETU System Test