April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Spin Filtering Studies at COSY and AD Alexander Nass for the collaboration University of Erlangen-Nürnberg SPIN 2008, Charlottesville,VA,USA, October 8,
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Progress and Plan for Superconducting RF Cavity RF Group.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Feasibility Check / How to test EquipmentsStatusCostDateCommentsContact Polarized 3 He atomsCell for transfer design / LKB, Paris/MainzSspm.e. optical.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
PASI OsC meeting 12th July 2012
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
A. Nass, M. Chapman, D. Graham, W. Haeberli,
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Haixin Huang AGS Cold Snake: Status and Plans.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
St. George Infrastructure
Status of the Front End Test Stand April 2007.
Accelerator Module Test Facility
Cryomodule Assembly Plan
Prototype cryomodule development
Mechanical Engineering progress for the Front End Test Stand
BGC Collaboration Meeting –
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Polarized 3He target installation
Presentation transcript:

Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions status The Breit Rabi polarimeter The 12 o’clock area Where do we go from here?

The overall system

The glow on the test bench Hydrogen dissociation using a variable frequency and power source

The dissociator stage The first test of the pumping system. After fixing a few leaks, we reached few x in about two hours.

The Dissociator The cold head about 20 o K The copper strap transfer to the nozzle The nozzle at 40 o K The neck at 80 o K RF system inside Alignment

The baffle The baffle for differential pumping. Baffle moving mechanism

Dissociator stage assembled Refrigerator

The next step Skimmer

First Measurements l With a hydrogen beam, we measured vacuum systems at three stages. The dissociator section, after the baffle, and the stage below. The pumping system is working quite well. The levels were better than calculated. l We added a collimator to mimic the first magnet aperture. With a quadrupole mass analyzer we measured the degree of dissociation and background. Encouraging results were seen. l This must have been beginners luck as we could not easily repeat the measurement. We suspect that some freezing and blocking occurred at the nozzle. l Since then we changed the nozzle tip for better transmission. No new measurements with the new set up as the system was opened to install the ABS magets.

The beginning of the ABS stage Sextupoles 1-4 upside down Fields measured by P. Wanderer et al. Few % lower than requested.

Next in the sequence Sextupoles 1-4 mounted on the vacuum vessel

The next set of magnets Sextupoles 5-6 Fields also low by a few percent

The ABS stage without RF transitions l Assemble both sets of magnets into the vacuum vessels. Align the nozzle, skimmer, and the first set of magnets. Set the distances from the nozzle to the magnet to the 60 mm value in the simulations. Set the baffle distance. l Add one dummy vessel with pumping and a profile the profile measuring device as well as a removable 9 mm aperture. l Add a chamber below equipped with the quadrupole mass spectrometer and its chopper. l Measure the atomic beam profile with and without and without the 9 mm aperture. (next week) l Measure the degree of dissociation (H / H2 ratio) versus several dissociator settings. (next two weeks)

The Holding Field Magnet

The holding Field Magnet l The Magnet coils are wound l After some rework an acceptable magnet vacuum vessel was delivered by our machine shops. l The coils positioning and epoxy potting inside the vessels is underway. l The next step is to measure the field for uniformity (few x ) in a cylinder of 1 cm diameter and +/- 3 cm long. l Measure the field along the recoil arms and adjust the two coil currents. (the next couple of weeks) l Wuzheng found an acceptable magnetic shielding solution for the RF cavities The magnet is not needed till we get the RF transitions in place

The RF Transitions Wisconsin work l The transitions have been designed. l The RF cavities have been built and tested (3 out of 4) l The strong and weak magnets are being wound l The bipolar power supplies have been chosen and an order is being placed l The Shielding pieces are in the process of machining l Anticipate delivery to BNL the 2nd week of July l With these in place we need to measure the magnetic field adiabiticity and zero crossing.

The Breit Rabi Polarimeter Wisconsin Work l The chopper has been built and the operation tested at 10Hz l The naked ion gauge has been procured l The assembly hardware is built and delivered to BNL l The hardware has been mounted on its flange awaiting installation on the jet l Sextupole magnets 7 and 8 mounting, design and construction is underway as is the beam blocking system l This is needed after the RF transitions and holding field magnet are installed

The electronics racks l The racks contents have been determined (seven racks are needed) l The inter rack connections have been mapped out. Wiring and termination on the jet started. This will continue in situ. l The controls, monitoring and jet DAQ systems (VME stuff) have been purchased l Anticipate to move the racks to the jet lab late next week to begin assembly of the pieces as they are needed (start with turbo pump power supplies and vacuum controls) l The PLC has been procured and interlock programming is well underway.

The Counting House at 12 o’clock

Work in the 12 o’clock area l The counting house is up. The same crew will install a concrete pad for the transformers and water systems. The same crew will take on the ring entry door modifications. l The electrical work will start soon on the house as well as the cable trays l The AC (2 ton) split unit will be ordered and installed soon l The penetration contract is with plant engineering. Hope to start early July l The PASS safety system modifications order was placed and hardware (iris scanner, video camera etc.) should be in house soon l The vacuum group has the ion pumps and isolation valves and spool piece. Beam line modification will be done well in advance of the jet installation. l The IR crane work has been simplified significantly to limit modifications

Where do we go from here? l Overall: good progress but we are approximately a month behind compared to our “best laid out” plans prepared last January. l Assemble and run the jet as a system in the jet lab this summer l Complete the construction in the IR by early September l Move the jet into the IR in Mid to late September l Run the Jet with remote systems in October l Remove the jet to the lab in late October l Restore the beam line for HI running by mid November l Fine tune the Jet through April of 04 prior to reinstallation in RHIC

The Overall RHIC Spin Program