EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER.

Slides:



Advertisements
Similar presentations
D:\data\PowerPoint\Maravic\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
Advertisements

Lithuanian concept for disposal of
KBS-3H Initial State Lucoex Workshop: Installation, closure and initial state May 13-14, 2014 Antti Öhberg.
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
DOPAS Project: Demonstration of Plugs and Seals The FSS Experiment (Full Scale Seal) J.M. Bosgiraud, F. Plas, R. Foin, G. Armand, J. Morel More about the.
1 ARN Nuclear Regulatory Authority International Conference on Management of Spent Fuel from Nuclear Power Reactors 31 May - 4 June 2010, Vienna Austria.
High Level Nuclear Waste Disposal Yucca Mountain, USA.
DAI YUNXIU China National Nuclear Corporation June 3, 2010 Introduction of the Large Scale Reprocessing Plant in China IAEA-CN-178/12-04.
Dounreay Nuclear and Chemical Land Contamination.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
CARL - SLOVENIA Drago Kos University of Ljubljana Faculty of Social Science 1.INTRODUCTION: Willingness to learn from past failures?
The SKB Spent Fuel Disposal Project – License Application
Nuclear energy at a crossroads. Benefits Reactors generate electricity without adding to global warming/air pollution. Small amt. of U gives off large.
National Approach and Experience on Disposal of Intermediate Level Waste in the Russian Federation A. Smetnik FSUE VO “Safety” Vienna, 9 – 13 September,
The Way Forward in the US: Nuclear Waste Management Allison Macfarlane AAAS San Diego February 19, 2010.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
Japan’s Nuclear Energy Program
Office of Nuclear Energy U.S. Department of Energy
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
Situation of the NPP in Spain. WHAT IS AMAC? - OBJECTIVES: SAFETY OF THE FACILITIES PLANS FOR NUCLEAR EMERGENCY ECONOMIC DEVELOPMENT - 8 NUCLEAR SITES:
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
Geologic Resources: Nonrenewable Mineral and Energy Resources Chapters 14 & 15 G. Tyler Miller’s Living in the Environment Chapters 14 & 15 G. Tyler Miller’s.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
TM Technical Meeting on the Disposal of Intermediate Level Waste
Options Analysis and Feasibility Study for the Safe Storage of Mercury in Latin America and the Caribbean Desiree Montecillo Narvaez Programme Officer,
Nuclear Energy. The Nearest Nuclear Power Plant DTE Fermi II is just about 40 miles from us.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Experimental Research on Nuclear Waste Disposal (ERNW) Radioactive Waste Management in France Alexis BOURDEAUX, France Wednesday 19/05/2010.
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
1 Spent fuel (SF), a radioactive waste, is often buried underground in canisters for disposal. As it decays, SF generates high heat and raises the temperature.
高階核廢終極處置的基本信念:人不能勝天 Rocky Lai 10/05/2015. High-level radioactive waste management in Sweden 10 operating nuclear reactors that produce about 45% of its.
The Swiss geological programme and the role of storage Jürg Schneider National Cooperative for the Disposal of Radioactive Waste International Workshop.
IAEA International Conference on Management of Spent Fuel
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
Regional Strategies Concerning Nuclear Fuel Cycle and HLRW in Central and Eastern European Countries Z. Hózer (AEKI, Hungary), S. Borovitskiy (FCNRS, Russia),
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
USE OF THE AXIAL BURNUP PROFILE AT THE NUCLEAR SAFETY ANALYSIS OF THE VVER-1000 SPENT FUEL STORAGE FACILITY IN UKRAINE Olena Dudka, Yevgen Bilodid, Iurii.
Nuclear Energy and 21st Century Environmentalism June 4, 2014.
US-DPRK Next Steps Workshop January 27, 2003Washington, D.C. Yongbyon Spent Fuel Experience Presented by Mark Mohr
Legal challenges in reviewing application for final disposal of spent fuel Tomas Löfgren.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
How sustainable is North America's energy future? What role could/will nuclear power play in North America?
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
1 António Pereira Fysikum The backend of the nuclear fuel cycle in Sweden.
Massimo Garribba Director, Nuclear Energy, Safety and ITER
Air Transport of Commercial Spent Nuclear Fuel (SNF) Assemblies
BRIEFING OF THE PARLIAMENTARY PORTFOLIO COMMITTEE
Nuclear Waste.
Back-end options for a small country with long term nuclear program
NRC’s LLW Regulatory Program: Update of Emerging Issues
Japan’s Nuclear Energy Program
Summary Resources are naturally occurring substances of use to humans.
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
RCF Plenary Session 21 September 2018
FULL-SCALE DEMONSTRATION OF PLUGS AND SEALS
Jiří Slovák, Vítězslav Duda
Radioactive Waste and Spent Fuel Management in Hungary
Disposal Facilities for Countries without Nuclear Programme
Anni Podimata, Vice President ITRE
By Daveed Ransome and a little bit of work done by Charles Cramer
A never-ending source of energy
Research, Development and Demonstration Projects at the Josef Underground Laboratory J. Stastka, J. Pacovsky, Czech Technical University in Prague, Prague,
Handling of Future Human Actions in the safety assessment SR-Site
Approaches to Evaluation of Spent Nuclear
Presentation transcript:

EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER

Background Operating time of NPP Krško (* †2023) Long term management of radioactive waste and spent nuclear fuel from NPP Krško Agreement between Croatia and Slovenia Necesarry to find technically acceptable and safe permanent solution – DISPOSAL IN DEEP GEOLOGICAL FORMATIONS

Model used Concept of SF was never devloped in Slovenia or Croatia Swedish concept has been taken as a reference The most devloped waste disposal concept Has been allready adopted by Finland Very avanced cost assessment methodology Model is devloped on next persumptions: Operating of NPP will end in 2023 Only disposal – no reprocessing of SF Respository in hard rock enviroment (depth 500m) Storage capacity of respository will be /- 20 fuel assemblies (620 tons)

Respository (description) Buildigns which creates a respository: Operations building Storage building Garage building maintenance and service building ventilation building production building for high- pressure compacting of bentonite and preparation of backfill materials office and workshop building information center rock stockpiles.

Ways to undergroun level For personal: SERVICE SHAFT (5m in light profile – 2 elevators) For waste and other cargo: SPIRAL RAMP (15m curve radius and 10% slope)

Canister Disposal Deposited into 1.8 m diameter disposal bareholes Sorrounded by 35cm of betonite Spacing defined on the basis of thermal analysis Disposal of canisters will start in second year after the start of operation When disposal tunnel is full, it’ll be backfilled with compound of sand and betonite 34 or 20 disposal tunnels

Cost Estimate Investment costs: mio € Backfilling/Decommissioning: 28.2 mio € Operating costs: 99.0 mio € Other costs: mio € TOTAL: MIO €

Alternatives Export of spent fuel to Russia (storage/reprocessing) – possibility opened in 2001 Areas to be solved before considering acceptable: Agreement on peaceful use of nuclear energy Get permmision from USA to export it (for ex-Yugoslavian countries)

We will see ;) Thank You! CONCLUSION