LBT Q1 2009 Eng/SW Review CM – Configuration Management Stephen Hooper.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
School of Computing, Dublin Institute of Technology.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Test Design Techniques
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review TAL Telescope Alignment.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Software Quality Assurance
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE CHAPTER Types of Production Production Planning Planning.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Copyright 03/15/20021 CREATING A FOREST ONE GROVE AT A TIME Regenerative Reengineering©
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
MGT 437 Week 3 Learning Team Project Planning Technical Paper To purchase this material click below link
Project Name Company Name Presenter Name
Project Name | Company Name | Presenter Name
SCM Metrics Draw the Process.
I Have Decided To Follow Jesus
مفهوم الموازنة العامة المقدمة
Project Name Company Name Presenter Name
PCC Update 10/28/09 Planning Phase
Project Name Company Name Presenter Name
Project Name | Company Name | Presenter Name
Project Name Company Name Presenter Name
Presentation transcript:

LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper

Progress LBT Q Eng/SW Review

Open Issues. Technical Software still needs to be moved into Subversion: AGW. Procedures to bring development in-line with change management practices. Schedule None Budget None Resource Competition for human resources LBT Q Eng/SW Review

Planning (Q4/2008)‏ Automated building for changes in changes to configuration-item dependency tree. Develop best practices for configuration items to insure that builds are carried out to meet objectives LBT Q Eng/SW Review