Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Neutrino Factories and Muon Colliders Leo Jenner.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
RF Cavity / Coupling Coil Module
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Harold G. Kirk Brookhaven National Laboratory Summary MUTAC Review Brookhaven National Laboratory April 19, 2007.
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
F Fermilab’s Muon Collider Task Force: Overview, Status and Plans Vladimir Shiltsev Fermilab AAC, August 08, 2007.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MAP Overview Steve Geer Accelerator Physics Center Fermi National Accelerator Laboratory MAP Winter Meeting JLab, February 28, 2011  
MCTF Neutrino Factory and Muon Collider Collaboration R&D Alan Bross Accelerator Physics Center Fermilab AAC Meeting May 6, 2008.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Neutrino Factory and Muon Collider Collaboration Introduction MUTAC Review April 2007 Alan Bross.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Neutrino Factory and Muon Collider Collaboration Meeting Introduction Fermilab March, 2007 Alan Bross.
Report of Project Manager Michael S. Zisman NFMCC Project Manager Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting–LBNL January.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
NFMCC 5-year Plan Update Michael S. Zisman NFMCC Project Manager Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review–LBNL April.
Muon Accelerator Program Overview Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Report of Project Manager Michael S. Zisman NFMCC Project Manager Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting–Fermilab.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Harold G. Kirk Brookhaven National Laboratory Accelerator and Beams Working Group 3 NUFACT06 Irvine, Ca. August 24-30, 2006 Conveners: R. Garoby, H. Kirk.
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Neutrino Factory and Muon Collider R&D Muon Production, Capture and Acceleration R&D directed at Physics with Intense Muon Beams The Neutrino Factory and.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Neutrino Factory and Muon Collider Collaboration DOE Briefing Meeting Alan Bross.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Muon Accelerator Program Review Highlights Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Muon Collaboration Status 1.Collaboration Goals 2.HEPAP sub-panel recommendation 3.Physics evolution (since sub-panel presentations) 4.Technical progress.
Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
Fermilab’s Muon Collider Task Force: Status and Plans Vladimir Shiltsev Fermilab NFMCC CM - ShiltsevMarch 17-20,
Neutrino Factory and Muon Collider Collaboration Meeting UCLA January, 2007 Alan Bross.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Muon Accelerators for Particle Physics Working Group Summary Conveners: Jaroslaw Pasternak Imperial College/RAL STFC Mark Palmer Fermilab Proton Accelerators.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
R&D towards a Multi-TeV Muon Collider Steve Geer 1.Introduction 2.Muon Collider Ingredients 3.Muon Collider / Neutrino Factory R&D 4.Muon Collider Specific.
Fundamental aspects of muon beams submitted to Accelerator R&D panel for GARD funding consideration by J.P.Delahaye/SLAC & Robert D. Ryne/LBNL.
August 24-26, 2010MAP ProgMgmt - Zisman 1 August 24-26, Program Management Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research.
Comments on the February DOE Review
Accelerator R&D for Future Neutrino Projects
m+ m- n MAP Overview Steve Geer Accelerator Physics Center
MICE Project in the US: Completion of Efforts
Muon Accelerator Program - MAP
m+ m- n Muon Collider R&D MUON COLLIDER & NEUTRINO FACTORY R&D
Final Remarks Michael S. Zisman Center for Beam Physics
Presentation transcript:

Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 NFMCC Organization R&D Tasks DOE/NSF Laboratories/MCOG S. Holmes, J. Siegrist, S. Vigdor MUTAC R. Kephart Collaboration Spokespersons A. Bross, H. Kirk Project Manager M. Zisman Simul.  COOL TargetMICE Executive Board Technical Board Collaborating Institutions Neutrino Factory and Muon Collider Collaboration (NFMCC) Other C. Adolphsen J. Byrd D. Finley S. Henderson M. Lindner V. Litvinenko P. McIntosh L. Merminga D. Rubin M. Shaevitz

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Collaborating Institutions National Labs ANL BNL FNAL LBNL ORNL TJNAF Universities Chicago Cornell Illinois IIT Indiana Iowa Michigan State Mississippi Northern Illinois Princeton UC-Berkeley UC-Davis UC-Los Angeles UC-Riverside Wisconsin National Labs Budker CERN DESY INFN JINR, Dubna KEK RAL TRIUMF Universities Karlsruhe Imperial College Lancaster Max Planck Osaka Oxford Pohang Harbin Tel Aviv USInternational Corporate Partners Muons Inc. Particle Beams Lasers, Inc Tech-X Corp.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The NFMCC Mission Extensive simulation and experimental program To study and develop the theoretical tools, the software simulation tools, and to carry out R&D on the hardware that is unique to the design of Neutrino Factories and Muon Colliders

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 MUTAC07 Recommendations 1. Give highest priority to acquisition of a coupling coil for MUCOOL. 2. Continue participation in MICE and MERIT as much as possible. 3. Continue to grow ties with IDS for a neutrino factory. 4. Take advantage of newly established efforts on a design of a Muon Collider (MCTF). 5. Leverage resources within the MCTF and UKNF collaborations, and Muons, Inc. to increase the manpower directed towards simulations of the acceleration system and storage ring.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 MUTAC07 Recommendations (2) Recommendation Coordination of MCTF with NFMCC is essential to ensure that the muon collider effort makes best use of limited resources, avoids duplication, and shares infrastructure, codes, and results. Although coordination is important, we recommend that the NFMCC remain independent, so that initiatives are not restricted by local (FNAL) preferences and constraints.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Design and Simulations The Simulations Effort l Targetry l Capture and Collection l Initial Cooling l 6D cooling l Acceleration l Storage Rings l Collider Rings Talks by J.S. Berg, R. Fernow, R. Johnson, and A. Jansson Charge: Review and comment on Simulation Group accomplishments and plans and on FFAG acceleration system activities.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Machine Scenarios IDS – Neutrino Factory Muon Collider Charge: Assess and comment on goals, strategy, and progress in the Muon Collider design. Charge: Assess participation in the International Design Study. Talks by K. Long and R. Palmer

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The MICE Experiment First Beam! March 30, 2008 Charge: Assess program and comment on first results from the international MICE experiment. Talks by M. Ellis and D. Kaplan

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The EMMA Experiment Experiment Scheduled— Dec’09 to Sept’10 Talk by S. Koscielniak

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The MERIT Experiment Experiment Run—Oct.21-Nov.11, 2007 Charge: Assess program and comment on results and possible follow up to the international MERIT experiment. Talks by I. Efthymiopoulos and K. McDonald/H. Kirk

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The MUCOOL Program 201 and 805 MHz RF Testing ProgramThe MTA Beam Line (MCTF) Talks by M. Green, D. Huang, C. Johnstone, and D. Li

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Absorbers and Windows LH 2 Absorber LiH Absorber Window Development Charge: Assess and comment on the MUCOOL R&D Program Talk by A. Bross

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 High Field Solenoids Achieving a final transverse emittance of 25 π μm-rad Requires use of High Temperature Superconductors Talks by R. Palmer, A. Zlobin and A. Tollestrup Charge: Assess and comment on Muon Collider technology development programs.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 PURPOSE: (S. Holmes) To co-ordinate the NFMCC and MCTF proposed and ongoing R&D activities to maximize their joint effectiveness and facilitate cross-participation in these activities where it makes sense. NFMCC LEADERSHIP MCTF LEADERSHIP MUON COLLIDER R&D CO-ORD COMMITTEE + NFMCC MANAGED MC R&D SUBACTIVITIES MCTF MANAGED MC R&D SUBACTIVITIES MUON COLLIDER R&D PROGRAM The NFMCC & MCTF Steering Group Charge: Review and comment on the R&D progress achieved since the last MUTAC review, including both NFMCC and MCTF activities. Talks by A. Bross, S. Geer, and V. Shiltsev

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 The Long-Term Vision Charge: Offer comments/advice as appropriate, on longer range strategies for the NFMCC and MCTF. Talk by V. Shiltsev

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Palmer’s P5 Presentaion Funding request includes that for Neutrino Factory R&D Funding increase (~3X) is needed if Muon Collider is to be a credible option by 2012

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Charge to MUTAC08 1. Review and comment on the R&D progress achieved since the last MUTAC review, including both NFMCC and MCTF activities. 1a. Assess and comment on results and possible followup to the international MERIT experiment. 1b. Assess and comment on the MUCOOL R&D program 1c. Assess program and comment on first results from the international MICE experiment. 1d. Review and comment on Simulation Group accomplishments and plans, including Neutrino Factory design optimization, FFAG acceleration system activities, Muon Collider studies, and participation in the International Design Study. 1e. Review and comment on goals, strategy, and progress in the Muon Collider design and technology development programs. 2. Review and give advice on the R&D plans and corresponding budgets for FY08 and directions for FY Offer comments/advice as appropriate, on longer range strategies for the NFMCC and MCTF.

Harold G. Kirk MUTAC Review, LBNL April 8-10, 2008 Summary Great Progress since MUTAC07! Experimental Program l MERIT run successful l MICE experiment has started l MUCOOL program progressing l EMMA experiment being fabricated Simulation Program l 6D cooling simulations l Neutrino Factory design work with IDS l Muon Collider design effort with MCTF Both NF and MC program has been presented to P5 MUTAC07 recommendations have been satisfied We look forward to the MUTAC08 recommendations