HF UPGRADE PROJECT Y. Onel PM Report April 30, 2012 1.

Slides:



Advertisements
Similar presentations
CMS Hadronic Forward Calorimeter Restoration of Functionality Iowa, BU, FNAL severe descoping of HF in 2002 $$ for HB, tracker tail catcher for late developing.
Advertisements

Status of the ATLAS MM project
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
HF UPGRADE PROJECT Y. Onel PM Report May 14,
HF UPGRADE PROJECT Y. Onel PM Report March 19,
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
HF UPGRADE PROJECT Y. Onel PM Report March 5,
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
CMS HCAL Editorial Report 23 September 2010 Sub Editors Vasken Hagopian (Chair) Chris Tully and Anatoli Zarubin.
HF UPGRADE PROJECT Y. Onel PM Sept 17, Recent Highlights and News-I The PMT deliveries are now completed. The PMT and Base Boards System tests.
HF UPGRADE PROJECT Y. Onel PM July 9, OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
HF UPGRADE PROJECT Y. Onel PM Report April 2,
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
The ATLAS Tiles Hadronic Calorimeter
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
1 ZDCs in CMS Michael Murray,U Kansas pp Lum EMHad PMTs Lead/ plastic Fiber 1.5cm tungsten plates 2mm plates Beam LED Spare space for flow upgrade Light.
HF UPGRADE PROJECT Y. Onel PM October 1 st
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
HF I&C status Alexi Mestvirishvili, University of Iowa LS1 session, December CMS week1.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
CMS HF PMT SYSTEM By Y. ONEL U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,2001.
HF UPGRADE PROJECT Y. Onel PM Sept 3, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
HF UPGRADE PROJECT Y. Onel PM November 26,
HF - Fiber and PMT Purchases By Y. Onel U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,01.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
HF “Slice test box” installation
DT-LHCb coordination meeting 18 April 2016
The European DHCAL status
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
HF Test station at P5 A.Mestvirishvili.
CMS Area Working Group Meeting
HF “Slice test box” fabrication and installation
ROBOX modification plans
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
HF Test station at P5 A.Mestvirishvili.
Limited Streamer Tube Project Summary
Presentation transcript:

HF UPGRADE PROJECT Y. Onel PM Report April 30,

Recent Highlights and News-I We have now our detailed HF Internal schedule for Thru this internal schedule we have moved some of our delivery dates forward. Our DOE Project dates will remain the same Our Schedule starts with our PPP Final for the baseboards and follows a delivery sequence of “Test Stand” equipment, PMT’s and ROBOXes. Alexi is preparing the 904 and SX5 (alcove) Test System write-up detailing our equipment, procedures and measurements. Worked on the shipping plan of the PMT’s to CERN. The current plan is to ship the PMT’s from Iowa to CERN. The shipping will include full insurance directly from Iowa. In fact our latest estimates shows that this is the cheapest way to ship the PMT’s since the shipping from FERMI does not include any insurance (FERMI is self-insured). Requested a change- order for this cost. Achielle has allocated a new space to store delivered equipment safely at CERN. Contacts are Christian Joram and Thierry Gys, Didier Piedigrossi. The New HF Physics and Detector group is now organized (Jane Nachtman). This group have members from Baylor, Brazil Universities, Iowa, Mississippi and Turkey. They had their first meeting on April 6 th. Developing our “Project Org Chart” adding Brazilian Universities and ITU, Istanbul. 2

Recent Highlights and News-II The PMT deliveries are now completed. Testing is going well. We had a meeting with Hamamatsu regarding our reject tubes. We have shipped back about 10 PMT’s ( low gain, high dark current and black cover problems) to be tested by them. The Base Board production is also going well. Working on the New HV testing system and forming a committee to evaluate the RFP responses. Bulgarian new module testing started. Waiting report from German and Alexi. The HV RFP and decision committee is now formed. Members are: Germain, Alexi, Ianos, S.Los, M.Miller, D.Winn from HF and Magnus and S. Lusin from CMS Coordination. We have to decide on the shield length- 54 mm looks good. Gain Sorting Proposal by Ugur -A uniform gain distribution for one HF is outlined from the foist 900 PMT sample. Other than the fringes at the edge of the sample, we can get gain uniformity within2% -EM and HAD, and 4 Quadrant separation would work if we can deliver different HV for each group (total 24 groups). -As the operation gain is decided, we can develop sorting and HV distributions for each group. There is a push for a new cable purchases– Thanks Chris Tully, Jeremy Mans and Pawel De Barbaro for this. There is also a strong support from Austin and Magnus on this. 3

HF2012 Organization Chart 4

Milestones 2012 HF UPGRADE PROJECT MILESTONS PMT Testing 50% Complete 1/1/2012 Production Readiness Review 1/12/2012 New YETS 2012 ROBOX manufactured, tested and installed in CMS 2/17/2012 New cable purchase decision 2 or 4 channel 7/1/2012 Start of CMS 2012 Shutdown 12/5/12 Equip ROBOX test stands at SX5 11/23/12 Gather Miscellaneous Hardware/Equipment for in-situ HF Testing in Garages 11/23/12 Install Miscellaneous Hardware/Equipment for in-situ HF Testing in Garages 12/19/12 HF Plus Moved into Garages 12/21/12 HCAL INTERNAL MILESTONES New HV system purchase decision 8/15/2012 HF PMT characterization and testing 100% done 10/1/2012 HF PMT's are shipped to CERN 10/15/2012 HF PMT Boards QC testing 100% at Iowa 11/1/2012 Start of the HF ROBOXes shipping to CERN 11/1/2012 HF PMT's are shipped to CERN 10/15/2012 5

New Advanced Schedule 6

PCB production 12x Jumper base board production/checking jumper board testing PCB production Board assembly/testing Testing and QC at Iowa First shipment of PCB's to CERN 50% board production done All done, tested and delivered to CERN 3/1/ /15/12 4/15/ /15/12 5/15/12—6/15/12 6/15/12– 12/1/12 6/30/12 - 7/15/12 7/31/12 (Int. Milestone) 10/1/12 (Int. Milestone) 12/7/12 (Int. Milestone) SL SL, IS, AM SL MM, JC, DS, ZJ, GF, JK ZJ SL 7

PMT's Delivery dates at CERN Set 1 Set 2 Set 3 Set 4 Set 5 Set 6 Set 7 Set 8 05/15/12 06/01/12 06/15/12 07/01/12 08/01/12 08/14/12 09/01/12 09/14/12 8

9 Assembly and Testing Base board population learning/training Populate and test baseboards HF+ Q1 (27) HF+ Q2 (54) HF+ Q3 (81) HF+ Q4 (108) HF- Q1 (135) HF- Q2 (162) HF- Q3 (189) HF- Q4 (216) 07/31/ /21/12 08/22/ /07/12 09/07/ /22/12 09/22/ /07/12 10/07/ /22/12 10/22/ /07/12 11/07/ /22/12 11/22/ /07/12 12/07/ /22/12 AM, IS, DK, MK, OK AM, IS, DK, MK, OK, EE, OO, BU, MY, SD, YOz, HO, KD

Test stand setup Test new box ( set-up new ROB) Produce and assemble test equip Establish Testing Procedures Produce Test stand equipment AM Tests new Box New ROBOX at 904- operating New ROBOX at SX5- operating Test Stands at SX5—operating 4/23/12 - 5/15/12 3/31/12 - 6/30/12 4/23/12 - 7/31/12 4/15-6/30 5/15 - 6/7/12 7/31/12 - 8/31/12 7/31/12 12/23/12 IS, AM IS, MF, PD, TK AM, IS, AP IS, MF, PD, TK AM, HB, EB AM, IS, AP, GA, YG AM, IS, AP, GA, YG, SD, YOz, FO, SS, SC, NB Adding two students Marcos and Thiago from Brazil. 10

ROB mechanics Finalize Shield dimensions & All materials ordered QN + Iowa students pre-assembly Ship to CERN CERN Setup HF+ mechanics pre-assembly/cable prep. ROB Completion Dates 25% completion 50% completion 75% completion 100% completion Production contingency 04/01/ /14/12 06/01/ /01/12 09/01/12 09/14/ /01/12 10/01/ /01/13 05/01/ /31/12 07/01/ /31/12 09/01/ /31/12 11/01/ /21/12 12/22/ /28/13 PB, MT, IS, PD, TK ZJ, ET, GF, JC, JK, DS Olga, TK, PD, (+2 crews x2) 11

Shield Simulations 46 and 54 mm 12

Shield Simulations 46 and 54 mm 13

HF Simulation Plans Goal: study implications of HF upgrade scenarios – 2 vs 4-anode readout – Timing – Trigger Examples: CMS physics channels – VBF Higgs – forward jet tagging – MET-based channels, SUSY,etc : HF provides coverage for Missing ET measurement Who is working on this effort: – Ken Hatakeyama (Baylor) + student – New collaborators from Brazil : Alberto Santo, Gilvan Alves, Jorge Molina – Rob Kroeger and Rahmat Rahmat (Mississippi) – Mete Yucel and Esra Barlas (ITU) – Iowa group 14

HF simulation – 2 and 4-anode readout ITU grad students (Mete Yucel and Esra Barlas) are working on simulation of 2- and 4-channel readout options of new PMTs. have made a new shower library in CMSSW -- Geant4 application based on the Quantum Efficiency of new tubes. Use new shower library to tune GFlash for any other HF-based simulations with Taylan Yetkin, developed simulation code to adapt the current RecHits to 2-channel and 4-channel RecHits, based on findings from test beam. Distributions from CMSSW data match test beam distributions. 15

Status of code Working out technical issues in private release, will go into cvs soon which includes new quantum efficiency for upgrade PMT’s. Currently single-channel readout, needs expanded RecHit collection for 2- and 4-anode readout. Rahmat will use for Gflash tuning as soon as is available 16

Back-up 17

PMT test in 2012-I Iowa is planning is to have all PMT's at CERN sometime in Sept All of the PMT's and base boards will be tested in 2012 at CERN We are in process of defining all test-stand setups and needed equipment to handle the testing of the base boards and PMT's. WE plan on having setups to test the equivalent of two boxes worth of PMT's at a time. The funding request is made- but the funding is not in place. Burn in HF Plus Side ROBOXs in Garages 210 days Mon 3/12/13 - Mon 1/14/14 and Burn in HF Minus Side ROBOXs in Garages 9/21/13 (as defined by the HF Project Schedule). 18

PMT test in 2012-II Functionality test – All base boards will be equipped with PMT’s and PMT + base board assembly will be tested at CERN. Primary readout is with HCAL DAQ and HF QIE etc. We will have four light distribution boxes (three in addition to existing one).  Number augmented to allow base board + PMT testing in parallel with new ROB test development. Two will be set up for testing of PMT’s + base boards (6 base boards tested at a time).  In addition to light distribution unit, setups will have: “Dark box” cover Signal and HV cables ( At the moment we only have cables for the one upgraded box.) Support for Base boards + PMT’s (using production ROB parts) All the necessary equipment components are designed currently at Iowa. 19

PMT test in 2012-III Before majority of PMT’s will be shipped, we will have 24 m-anode PMT’s + three baseboards at CERN to assemble and test one more “upgraded” ROBOX for test- stand/testing development  Most mechanics already assembled at CERN.  Needs cables from Fermi box.  Will be assembled and ready for use by May. This ROBOX will be used to define all the test procedures –LED and PED runs, SPE runs. We will define what info goes to database, traveler runs etc. 20

PCB Production- N 21

PMT’s New 22

Assembly&Testing -N 23

PROJECT FILE-N 24

PMT Shipping Cost All estimates based on 12 x 9 x 6 box Weight at 6.0lbs Total quantity to ship 1800 The maximum shipment value via both carriers to Switzerland is $50,000 USD * The cost of 25PMT’s shipped at CERN insured at $1000./each was $244.- Value per PMTQuantity of PMT per boxTotal Value of shipmentFed ExUPS Account# Account #678E35 $0500$1International Economy- $70Worldwide expedited- $165 $50500$25,000International Economy- $244Worldwide expedited- $365 $100500$50,000International Economy- $421Worldwide expedited- $565 $1,00050$50,000International Economy- $421Worldwide expedited- $565 25