1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Electrical Engineering Department
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENERGY CONVERSION ONE (Course 25741) CHAPTER SIX ……SYNCHRONOUS MOTORS.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Bob Green Garland Power and Light
Power System Fundamentals
FREQUENCY CONTROL DURING BLACK START OPERATIONS
POWER GRID CORPORATION OF INDIA LIMITED Presentation on ‘FREE GOVERNOR OPERATION” By D.K.Guru & S.P.Barnwal.
Active Power and Frequency Control
PRESENTATION FREQUENCY CONTROL
Output and the Exchange Rate in the Short Run. Introduction Long run models are useful when all prices of inputs and outputs have time to adjust. In the.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Ch. 21: Production and Costs Del Mar College John Daly ©2003 South-Western Publishing, A Division of Thomson Learning.
MICRO HYDROELECTRIC POWER PLANT WITH CHAIN TURBINE
AP Physics C Montwood High School R. Casao
Three-Phase ac Voltage Generation
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
ET2105 Electrical Power System Essentials
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Voltage and frequency control of the grid Minute Lectures A complex system In Europe, all electrical grids are interconnected This large international.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Unit 3 Aggregate Demand and Aggregate Supply: Fluctuations in Outputs and Prices.
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
11 OUTPUT AND COSTS © 2012 Pearson Addison-Wesley The Firm and Its Economic Problem A firm is an institution that hires factors of production and organizes.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
FREQUENCY-POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
GENERAL BACKGROUND AND SPEED GOVERNORS
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Power Plant Construction and QA/QC Section 5.3 – Turbine and Engine Governors Engineering Technology Division.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
SMJE 2103 Synchronous Generator. Scope of discussion 1)Construction 2)Rotation speed 3)Generated voltage 4)Equivalent circuit 5)Power and Torque 6)Testing.
1 Electric Utility Power Systems Generation of Electricity.
Parallel Operation of Synchronous Generators Based on Sections 5.9 of the Textbook.
J.PRAKASH.  The term power quality means different things to different people.  Power quality is the interaction of electronic equipment within the.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Monetary Policy.
Lesson 16: Asynchronous Generators/Induction Generators
Lesson 22: Active Power Division Between Alternators
Lesson 21: Alternator Capabilities and Mechanical Power Control
Economic Operation of Power Systems
Introduction To Reactive Power
Automatic Generation Control (AGC)
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
National Institute of Wind Energy(NIWE)
Presentation transcript:

-- Bhanu Bhushan -- < a3bhanu@gmail.com > (August, 2011) FREQUENCY CONTROL -- Bhanu Bhushan -- < a3bhanu@gmail.com > (August, 2011)

What is frequency ? How would you explain it to a layman ?

Number of times the voltage reverses in half a second.

From where does it come ? What governs the frequency ?

Speed at which the turbine - generators are running at that time. 3000 rpm = 50 rps = 50.0 Hz 2940 rpm = 49 rps = 49.0 Hz ( for 2 - pole generators )

Is it same all over a system ?

Yes. But, why ?

Because polarity of voltages produced by all generators must be same at a particular time, and must reverse together.

Is the frequency constant ?

No. Why not ? Why does frequency keep changing all the time ?

Because total consumer load keeps changing from time to time, and Because total generation is not changing in step with the change in total load.

12

In a single-machine system, MW sent out from the generator is decided by and is equal to the total consumer load at that time. Steam flow to the turbine is decided by the control valve opening. So, to stop frequency from going on increasing (decreasing), steam flow to the turbine has to be equalized with the MW, by reducing (increasing) the control valve opening. This is the job of the governor.

14

Governors have a drooping characteristic Governors have a drooping characteristic. If droop setting is 5%, it means that the control valve would be closed from 100% to 0% position when turbine speed rises by 5%, which would happen when the system frequency rises by 2.5 Hz (in a 50 Hz system). If frequency rises (falls) by 0.1 Hz, turbine-generator output would be reduced (increased) by 4% of MCR automatically.

16

The basic functions of a governor on a prime mover To vary the power input to match the power output, and thereby contain the speed change. Additionally, in case of grid-connected generating units, to enable stable parallel operation by equitable sharing of system load changes. To prevent dangerous over-speeding in case of a load throw-off; it is an essential safety device. Must always be in operation.

Frequency changes (magnitude of fluctuations) are much higher when governors are not in normal operation.

19

20

21

22

What happens if the frequency deviates from the rated value of 50.0 Hz ? What are the adverse effects of high and low frequency ?

Motors & driven equipment : over-loading / reduced output Transformers : --- / over-fluxing Capacitors : --- / effectiveness falls Reactors : effectiveness falls / --- Transmission lines : parameters change Steam turbines : resonance of LP blades Generating stations : --- / MW capability falls Power system : effect on voltage profile.

Permissible band of frequency ? Obligation to consumers Requirement of power plants Requirement of system operation Electric clocks.

Indian Electricity Rules, 1956 : +/- 3% IEC for Steam turbines : + 1%, - 2% IEGC ? England :

How is the frequency stabilized and controlled ? Established practice in developed countries In India

(G1+G2+G3) = (L1+L2+L3) REGION REGION y=L3-G3 x=L1-G1 L1 L2 L3 x y GI

Suppose L1 increases to L1’ Suppose L1 increases to L1’. Frequency would decline to a new level at which (G1’+G2’+G3’) = (L1’+L2’+L3’) Then x’ = L1’ – G1’; y’ = L3’ – G3’ x’ may not be = x; y’ may not be = y Such fluctuations keep happening all the time. Let us assume that L2 & L3 remain unchanged when frequency declines. Then (G1’+G2’+G3’-G1-G2-G3) = L1’-L1.

If all generating units are on FGMO with an equal droop, (G1’-G1)/G1 = (G2’-G2)/G2 = (G3’-G3)/G3 = (L1’-L1)/(L1+L2+L3). In Western countries, it is mandatory to continuously regulate G1 such that x’’ = x within 10-15 minutes, assuming x was = interchange schedule for the State to begin with. This is possible only if (G1’’-G1) = (L1’-L1). This requires that every constituent has adequate spinning reserves and AFC. (Self-sufficiency) No concept of region-wide merit-order.

Steps in frequency control Change of total generation in the system to match the new total system load, through FGMO, without any time delay. Change the total generation in affected area to absorb the change in area load. Change the generation in affected area to restore merit-order. May be combined with the previous step. Additional sale / purchase for economy.

Frequency and all tie-line flows automatically return to the previous level, without any corrective action in other control areas. The latter’s generation also returns to previous level, without any change in governor settings. Frequency = 50.0 Hz and x = schedule, to start with. Frequency = 50.0 Hz and x’’ = schedule, after the third step. Can this conventional scheme work after vertical unbundling of power utilities? How would a Discom keep to its import schedule?

In our case, x generally is above / below schedule, to start with, and frequency may not = 50.0 Hz. Each State has notified entitlements in Central generating stations Suppose it is ‘a’ MW on a day Then, (x – a) = over-drawal, for which the State has to pay UI charges into the regional pool account. ‘x’ is metered in 15 minute wise energy. UI rate is determined for each 15-minute period according to average frequency during the period.

Each State system is a ‘notional’ control area Each State system is a ‘notional’ control area. Schedules serve as commercial and operational datum, and deviations are allowed as long as system is not endangered and UI charges are paid. Concept of frequency-linked load dispatch, to achieve system-wide merit-order. No need for Steps 2 & 3. Step 4 is optional. Governor settings are required to be adjusted in all control areas, to bring the generating units back to desired MW.

35

36

When frequency is low (because of a general deficit), UI rate would be high and the State should plan to curtail its over-drawal, by -- Harnessing all generation within the State -- Procuring additional power. Load - shedding only when no additional power is available at a price that the State utilities can pay, and UI rate is not affordable or frequency has come down to a level which endangers the grid.