“Detector activities” after the IB upgrade Michele Punturo.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Plans for Advanced Virgo
Commissioning work on the low temperature interferometer 5/17/2010 GWADW at Kyoto Osamu Miyakawa (ICRR, U-Tokyo) and CLIO collaboration 5/17/2010 GWADW.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 ILIAS Birmingham, 10/07/2008 H. Heitmann The Virgo+ shutdown.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Virgo Upgrades Toward Virgo+ Michele Punturo Virgo Collaboration INFN Perugia.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Francesco Cottone INFN & Physics Departments of Perugia, Pisa, Florence (Collaboration Work under VIRGO Project) Thermomechanical properties of silicon.
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
Virgo-Material “macro” group M.Punturo. VIRGO-MAT2 VIRGO-MAT components Virgo-MAT is composed by three INFN groups –Firenze/Urbino M.Lorenzini, G.Losurdo,
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 PAY & OSD Piero Rapagnani 26/02/ Fatal interference with current geometry: deep redesign of the payload needed Positioning another payload close.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Alessio Rocchi INFN Roma Tor Vergata Thermal Compensation System for Virgo+
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 1 SUPERATTENUATOR - IP BASELINE: VIRGO DESIGN with STIFFER IP LEGS TILTMETER.
New MC mirror M.Punturo. New MC mirror? Scattering in the end mirror of the IMC is the first cause of the ISYS upgrade –Poor quality of the substrate.
New Coil Drivers Time Line Alberto Gennai I.N.F.N. Pisa.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
1 Phase Camera CRE S. Bigotta, L. Bonelli, A. Di Lieto, A. Toncelli, M.Tonelli INFN – Pisa University P. La Penna EGO.
Michele Punturo WP3 meeting, Cascina 9-July-2004
Upgrade activities at Clermont-Ferrand
Back-scattered light noise in Virgo 2nd Science Run data
VIRGO–KAGRA Meeting about bottom filter damping
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
The Superattenuator upgrades and the SAFE Project
Virgo – Injection SYStem
Frequency Noise in Virgo
3rd generation ITF sensitivity curve
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
Presentation transcript:

“Detector activities” after the IB upgrade Michele Punturo

What we must do 0 priority: – commissioning 1 priority: –Items to be implemented Acoustic shielding in the laser lab Improvement of the cleanliness procedure in the towers New coil drivers … (MC LC windows?) … –Items to be investigated: MC end mirror –Better substrate –Heavier payload BS mirror –Larger mirror »Reduce scattered light Eddy current dissipation New electronics Thermal compensation & Phase camera New quadrant centering devices (galvanometers) …

Virgo+ Activities New high power laser –N. Mann FS monolithic suspension activities –M.Punturo

Acoustic Shielding in the LL Reduce the cross talk between the acoustic channel and the dark fringe All the racks with fans displaced during the shutdown A coverage of the laser table and of the external injection bench is under design –Two offers received: 30 k€ 16 k€ –A third company contacted Offer in few days –Implementation: End of winter, beginning of spring As soon as an executive design will be available it will be shown in a detector meeting

Cleanliness improvement in the tower Wednesday, past week: When the NI problem occurred I prepared (16/04/2003) this list of rules: –Keep the mirror clean –Remove the dust particles through an ionized air jet after the integration and tuning procedures –Inject, during the venting only dray air –Warm up the mirror, to reduce the probability of condensation on it Some of them haven’t been respected –Need to patch the problem now (cleaning intervention) –Need to solve the problem in the future Control of the moisture Ionized warm air flux (need of infrastructure upgrade, already indicated in the urgent purchases in the October 2005 Detector Meeting in Naples)

Actuation Noise G.Losurdo

New coil drivers Full production of new coil drivers in one year –Prototypes already installed in the end towers (EM contamination) –Simplified solution in the input towers (switch+resistor) –Simplified solution in the BS tower New coil drivers have been designed by INFN Pisa + EGO support to solve the actuation noise problem –Two different sections High power section for lock acquisition Low noise section for linear regime –The two sections are driven by two independent DACs

NEW end MC mirror The losses in the MC are 846 ppm (F.Bondu) instead of 115 ppm Defects and contamination in the curved MC mirror This mirror must be replaced

Small or large MC mirror? Two new small substrates have been sent to GS Lumonics (Raffaele, could you confirm?) The possibility to use a large substrate must be investigated –Better control of the payload –“almost” standard geometry –Herasil substrate available –Movement mechanics complicated –Optics + Mechanics studies must be started now

New BS? Stray light is evident in the BS IB WA NI wedge With the higher injected power the problem should be enhanced –Larger BS needed New substrate (wedge) to be realized

Eddy current FUTURE problem Virgo design –M=0.017 A m 2 –Stainless Steel RM  RM =1.4×10 6 W -1 m -1 –Q eddy =1.8×10 8 Current design –M=0.05 A m 2 –Aluminum RM  RM =3.2×10 7 W -1 m -1 –Q eddy =9.4×10 5 Experimental test: (VIR-NOT-PER (1996), VIR-NOT-PER (1997), Rev.Sci.Instr. 69, 2777 (1998))

Magnetic Field Now mirror post magnet coil Macor support steel support Aluminum RM

With Iron Hat

Test in Clean Room

Conclusions In parallel to the commissioning activities many “detector activities” are foreseen (and many more are needed) Man power is an issue: –Many persons are involved in both commissioning and “detector”