National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.

Slides:



Advertisements
Similar presentations
The complete solution to managing real budgets and SUS validation.
Advertisements

Telework Training for Employees State Personnel Administration.
Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
Health Care Society Kidney Dialysis Project Preparation for Dialysis Session.
Hazard Management Dr. G. B. Soni. The Air Act RIARIA The Water Cess Act The Environment Protection Act The Water Act Environmental.
Considering the segmented community databases that are used to store each individuals data The Neighbourhood Alert network: A fresh and unique approach.
Biogeochemical Cycles Mr. Skirbst Life Science Topic 19.
Huntsville Fire & Rescue. To Save Life and Property Prepare for Large and Small Emergencies Maintain 24/7 readiness.
WFM 6204: Hydrologic Statistics © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM-6204: Hydrologic Statistics Akm Saiful Islam Lecture-1: Characteristics.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
Litho Area Centre for Nano Science and Engineering Indian Institute of Science, Bangaluru  Laser Writer  EVG double side mask aligner  EVG Bonder.
M ERCER E NGINEERING M ERCER E NGINEERING Different by Design Dr. Donald Ekong, PE
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
Calculating & Reporting Healthcare Statistics
Health Hazards in Construction. Regulations for construction health hazards  29 CFR 1926 Subpart H 1a.
School of something FACULTY OF OTHER FACULTY OF MATHEMATICS and PHYSICAL SCIENCES FACULTY OF ENVIRONMENT FACULTY OF ENGINEERING Skills training and development.
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Prevention of filaments with aluminium or ozone at Klagshamn WWTP? Marika Wennberg*, Ulf Nyberg* and Karin Jönsson** * VA SYD **Lund University.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
 Methods of abortion  Statistics  Possible solutions.
MAINTENANCE & OPERATIONS LEVY Spokane Valley Fire Departments.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Water Services Trust Fund Accounting and Reporting Clarine Bowa and Charles Kang’ethe 1 Accounting and Reporting.
Sl.NoItemOwnerStatus 1a. To get the cost estimate of having a centralized compressor for all the labs at CeNSE. b. Estimate the cost of running a new pipeline.
11 A Natural Gas to Petrochemical Complex Union Industrial Estate, La Brea Presented on August 29th, 2013 NESC, La Brea.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Designing a Budget Making it work without working too hard 1.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
Huntsville User Administration Training. Huntsville User Administration Training: Other Products – Teacher Administrated.
Micro and Nano Characterization Facility Girish Kunte January 29 th 2013.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
Engineering Hydrology (ECIV 4323)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
Micro and Nano Characterization Facility Girish Kunte July 1 st 2014.
Exit Routes and Fire Protection
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
ByBy: Gh. Pouryaghoub. MD Center for Research on Occupational Diseases (CROD) Tehran University of Medical Sciences (TUMS)
New Hampshire State fish hatchery effluent discharge and EPA/NPDES permit story.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
The School of Mechanical and Mining Engineering All of School OH&S Meeting October 2014.
Chapter 1 - Title Week 2: Laboratory Data and Techniques Tel:
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
Recovery Operations.
CEITEC Nano Research Infrastructure
Respiratory Protection Program
WELCOME.
Promotional Gender Discrimination
Mixtures 8.P.1.1.
Water Supply (Fire Fighter II)
Corporate Services Group
Land, Water, and Air Resources Chapter 4
انواع اواپراتورها.
مفهوم الموازنة العامة المقدمة
Pmp training in bangalore.
Data science online training.
Family and Consumer Sciences
Digital Marketing training in bangalore.
Occupational HEARING LOSS
Purchasing daily office supplies process
Data science course in Bangalore.
Family and Consumer Sciences
Jones Island Water Reclamation Facility
Internet Banking ARS Registration
Presentation transcript:

National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee Meeting

TUMS MURTHY Feb 25, 2014 Action Items Sl.NoItemOwner 1To sign acceptance certificate for RTP.Dr. Murthy 2To find solution for Medical InsuranceProf. Rudra Pratap 3Record of consumables issued to each userDr. Murthy 4 To check the quality of liquid discharge after effluent treatment and air quality after scrubbers every six months Mr. Arun Kumar 5To investigate water mist fire extinguishersMr. Arun Kumar 6 Steps to reduce queue time on laser writer Steps to reduce training time for Raith Dr. Hegde 7To estimate annual Budget of MNCF.Dr. Girish Kunte

TUMS MURTHY User statistics Feb 25, 2014 Reports

TUMS MURTHY Feb 25, 2014 SWIFT Watermist Technology Self -activated Watermist Instant Flooding Technology

TUMS MURTHY Feb 25, 2014 SWIFT Watermist Technology

TUMS MURTHY Feb 25, 2014 Estimated Annual Budget

TUMS MURTHY Feb 25, 2014 NNfC Consumables Item descriptionCost/year(Lakhs) MOS chemicals30.0 Local Chemicals6.0 Lithography -chemicals40.0 Cleanroom supplies19.0 Wafers50.0 Sputter Targets22.0 Evaporation Materials0.0 Bulk Gases Liq N233.3 O217.2 H23.5 Ar1.1 Specialty Gases Replacement only17.0 Specialty Chemicals POCl32.6 TEOS1.5 Total estimate243.1