Mackenzie Valley Environmental Impact Review Board Presentation of Technical Submission Avalon Rare Metals Inc. Thor Lake Rare Earth Element Project February.

Slides:



Advertisements
Similar presentations
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
1. Globally Harmonized System of Classification and Labelling of Chemicals (GHS) Presentation to RCC Stakeholders - Webinar Session January 14 th, 2014.
Plantemoran.com JANUARY 27, (r) Final Regulations.
POLICE PATROL AND THE FOURTH AMENDMENT Bladensburg Police Department Training Division Instructional Design Presentation of Management Plan by Ryan Vierheller.
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
1. Construction/Safety Standards for Small Craft Webinar Presentation January 2014 Transport Canada Associate Assistant Deputy Minister Safety and Security.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
1 - Issuing regulations Governmental, Legal and Regulatory Framework for Safety (GSR – Part 1) Requirement 1: National policy and strategy for safety The.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Autonomous Vehicle Regulations Development New Motor Vehicle Board 10 th Industry Roundtable March 14,
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Ministry of the Environment Certificates of Approval Anaerobic Digestion Facility Pre-Construction DIGGING INTO BIOGAS DETAIL WORKSHOP April 5, 2008.
CEAA REGULATIONS AND PROCESS OPTIONS SEPTEMBER 24, 2012.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
ENVIRONMENTAL ASSESSMENT UNDER ABORIGINAL LAND CLAIM AGREEMENTS FEBRUARY 23, 2012.
Is an environmental assessment required? November 15, 2012.
12Introducing Geographical Zones in the Mekong River and related Technical and Operational Requirements for Tankers Objective To assess, identify, define.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
INTERTANKO’s proposal for an Interim Strategy on Ship Recycling EMSA Workshop Lisbon, 21 st September 2006
Michigan Department of Education Office of Field Services Consolidated Application Schedule.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
ENVIRONMENTAL ASSESSMENT AND ABORIGINAL LANDS AND PEOPLES NOVEMBER 5, 2012.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Presentation to the HELLENIC MEDITERRANEAN PANEL HELLENIC MEDITERRANEAN PANEL (Athens, Greece - 23 October 2008)On US DISCHARGE STANDARDS -The NPDES Program-
1. Marine Transportation Security Regulations Work Plan Webinar presentation January 2014 Transport Canada Donald Roussel
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
Cecilia Tellis, Law Librarian Brian Dickson Law Library Principles of Legal Research Fall 2008 Week 10: Nov Cecilia Tellis, Law Librarian Brian.
Fisheries Protection Program: An overview November
Federal agency for medicines and health products EC REGULATION 1901/2006 ON MEDICINAL PRODUCTS FOR PAEDIATRIC USE AND HOMEOPATHIC MEDICINAL PRODUCTS Marie-Anne.
Environmental Impact Assessment in the Slovak republic.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1. Regulatory Oversight Regime on the Great Lakes & St. Lawrence Seaway Webinar presentation January 2014 Transport Canada Donald Roussel
CHAPTER 14 – OCCUPATIONAL SAFETY AND HEALTH
2011 Update: Ballast Water Treatment Technologies for Use in California Waters N. Dobroski, C. Scianni, and L. Takata Marine Invasive Species Program Marine.
Nunavut Impact Review Board Final Hearing Agnico Eagle Mines Limited – Meliadine Gold Project August 21 – 27, 2014 Rankin Inlet, Nunavut Transport Canada.
Public Lands begin at Claridge Nursery (Green Dots) 1 st Wayne County Courthouse.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
A PRESENTATION TO THE SELECT COMMITTEE OF PUBLIC SERVICES 13 FEBRUARY 2008 BY KAREN NAIDOO DIRECTOR: MARITIME INDUSTRY DEVELOPMENT, MULTILATERALS AND ENVIRONMENT.
Bulgarian Geology and Mining Ministry of Environment and Water.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
2013 Assessment of the Efficacy, Availability, and Environmental Impacts of Ballast Water Treatment Systems for Use in California Waters Nicole Dobroski.
1 Briefing on the Draft Call for Projects and Schedule for the Air Quality Conformity Assessment for the 2011 CLRP and FY TIP Technical Committee.
Turning our Action Plan into Action. Acronyms: FACA – Federal Advisory Committee Act WRDA 1996 – Water Resources Development Act of 1996.
Canadian Environmental Legislative David Hunter B.A., LL.B., LL.M. Bennett Jones LLP Presentation to: Fachbereich 1 Architektur, Bauingenieurwesen, Geomatik.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
IMPLICATIONS OF THE HIGH COURT JUDGMENT IN THE MATTER BETWEEN EARTHLIFE AFRICA JOHANNESBURG V MINISTER OF ENVIRONMENTAL AFFAIRS AND OTHERS IN RESPECT OF.
RATIFICATION OF THE 1991 FAL AMENDMENTS TO THE CONVENTION ON THE INTERNATIONAL MARITIME ORGANIZATION, 1948 A PRESENTATION TO THE PORTFOLIO COMMITTEE OF.
Municipal Class Environmental Assessment
New Environmental Science-based Regulations on Pleasure Craft
Phase 2 Hope Bay Belt Project
Drought in Texas Texas Division of Emergency Management
Standards and Certification Training
Canadian Navigable Waters Act
National Environmental Policy Act (NEPA)
Insolvency regime for further education and sixth form colleges
Julie Woosley, Division of Waste Management
INTRODUCTION OF MINIMUM ENERGY PERFORMANCE STANDARDS (MEPS) & SAFETY REQUIREMENTS FOR ELECTRIC LAMPS 25 OCTOBER 2018 LW JELE.
EMC – Air Quality Committee March 9, 2016
15A NCAC 2D Start-up, Shut-down, Malfunction SSM SIP Call
Presidential Permits Implementing EO 13337
Julie Woosley, Division of Waste Management
Presentation transcript:

Mackenzie Valley Environmental Impact Review Board Presentation of Technical Submission Avalon Rare Metals Inc. Thor Lake Rare Earth Element Project February 2013 Transport Canada

Overview of Presentation Summary of TC Recommendations 1.Stream Crossings 2.Water Intake 3.Docks 4.Ring Lake, Ball Lake & Buck Lake: Tailings Management Facility 5.Barging 6.Transportation of Dangerous Goods Closing Remarks 2

1. Stream Crossings Avalon has assessed and deemed the Fred Lake outlet stream to fall under the class of minor navigable waters established in the Minor Works and Waters (Navigable Waters Protection Act (NWPA) Order. Consequently, works conducted in minor navigable waters are exempt from the NWPA application process. Avalon must ensure that all criteria established in the Order under each class and referenced in the Minor Works and Waters (NWPA) Order must be fully met in order for the navigable water to be considered “minor” under the provisions of the Act. 3

2. Water Intake TC recommends that Avalon consult the TC Navigable Waters Protection Program pamphlets for Minor Works, Water Intakes and Temporary Works. If all the conditions outlined are met, an application(s) for approval under the NWPA will not be required for the construction of and/or the water intake on Thor Lake. 4

3. Docks Avalon must submit formal applications as early as possible to TC in order to obtain approval for each specific work. Avalon must also inform TC of any design, construction, or operational changes. TC will require final detailed design drawings for each proposed work to determine applicability of the NWPA. 5

4. Ring Lake, Ball Lake & Buck Lake: Tailings Management Facility (TMF) TC has determined that Ring Lake, Ball Lake, and Buck Lake are navigable and considers the depositing of tailings into these lakes to be subject to Section 22 of the NWPA. Section 23 of the NWPA provides that the Governor in Council, when it is shown to its satisfaction that the public interest would not be injuriously affected, may, by proclamation, declare any rivers, streams or waters in respect of which Section 22 of the NWPA applies, or any parts thereof, exempt in whole or in part from the operation of Section 22. 6

4. Ring Lake, Ball Lake & Buck Lake: Tailings Management Facility (TMF) Therefore, in order to deposit tailings into Ring Lake, Ball Lake, and Buck Lake or to proceed with any undertaking that would allow the depositing of tailings, it is necessary for Avalon to first obtain a Proclamation of Exemption by the Governor in Council under Section 23 of the NWPA. On November 13, 2012, Avalon submitted an application to Transport Canada seeking a Proclamation of Exemption under Section 23 of the NWPA. 7

5. Barging Transport Canada has advised Avalon that due to the project’s location and cold weather environment in which they will be operating, they should make sure that barge(s) and all systems are designed for the anticipated ice conditions and comply with the provisions and regulations of the Canada Shipping Act,

6. Transportation of Dangerous Goods TC recommends that Avalon consult the Transportation of Dangerous Goods Act and Regulations as they relate to the Thor Lake Rare Earth Element Project, to ensure operations comply with all applicable requirements. Avalon and its shippers should consult the list of substances that require an Emergency Response Assistance Plan (ERAP) to determine if there are any requirements for an ERAP. 9

Closing Remarks The Navigation Protection Act (NPA) is the new name for the NWPA, and was granted Royal Assent on December 14, The NPA has not yet come into force. TC is analyzing the transitional requirements and will propose a date for entry into force to Governor-in Council – likely in the Spring of Until the NPA enters into force, TC will assess proposals in accordance with the NWPA. 10

Closing Remarks Transport Canada will continue to work with the MVEIRB, other federal and territorial government agencies, stakeholders and Avalon in the environmental assessment review of the Thor Lake Rare Earth Element Project. 11