PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.

Slides:



Advertisements
Similar presentations
MicroKernel Pattern Presented by Sahibzada Sami ud din Kashif Khurshid.
Advertisements

©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 14 Slide 1 Object-oriented Design 1.
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
PACS SVR 38/9 Nov 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber, R. Vavrek.
Michel Denis, ExoMars Ground Segment Manager, HSO-OPM
The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
SWE Introduction to Software Engineering
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Network Management with JMX Thu Nguyen Oliver Argente CS158B.
SOLAR ORBITER SOC Test Plans Nana Bach SOWG#7 – 6-9 July 2015.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
EUSO-SODC status report M.C. Espírito Santo Huntsville, May 2003.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
Java SNMP Oplet Tal Lavian. Goals Portable across a range of devices Extensible Simple and convenient for client use Consistent with SNMP model Hide unnecessary.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
PACS CoP & PV Review21/22 Jan 2009 CoP Plan and Timeline1 CoP Preparation H. Feuchtgruber.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
PACS Page 1 NHSC Data Processing Workshop – Pasadena Aug 26-30, 2013 SPIRE Spectrometer Data Reduction: Mapping Observations Nanyao Lu NHSC/IPAC (On behalf.
08-Nov-2007 Ekkehard Wieprecht SVR III MPE PACS Photometer Pipeline.
1 Universities Space Research Association Martin Ruzek SSSC February 18, 2010 FIFI LS EOOP Extended Observing Opportunity Program Operating FIFI LS in.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Bruno Altieri Jan # 1 Parallel mode Bruno Altieri (HSC) PACS PV phase review MPE,
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Functional System Simulation in support of System (Design) Verification Harald Eisenmann Incose International Workshop 2013 ASTRIUM CONFIDENTIAL.
The road to the first E2E tests
Instrument Teams to SOC Test Specifications
11T Magnet Test Plan Guram Chlachidze
I&T&C Organization Chart
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
Solar Orbiter Instrument Testing by MOC-SOC
EIN 6133 Enterprise Engineering
Current SOC-Ground System Integration Schedule (Jan )
تكملة الوحدة الاولى الفصل الثاني بالكتاب للاطلاع ثم الفصل الثالث التخطيط لبناء الاختبارات التحصيلية الفصل الثالث من الكتاب (87-164)
Launch and On-orbit Checkout
LAT Operations Scenario Subsystem Meetings
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
DSDP - Target Management
Integration & Test Instrument Operations Coordination
Reportnet 3.0 Database Feasibility Study – Approach
Presentation transcript:

PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber

PACS SVR38/9 Nov 2007 System Testing2

PACS SVR38/9 Nov 2007 System Testing3 Layout of Integration Facility at EADS Astrium GmbH Friedrichshafen CCS

PACS SVR38/9 Nov 2007 System Testing4 Instrument EGSE Room during HIFISPIRE PACS S2K QLA CUS Remote Control for Air-conditioning Portable Phone

PACS SVR38/9 Nov 2007 System Testing5 Schedule

PACS SVR38/9 Nov 2007 System Testing6 System Test Elements (1) SFT warm (1 st run on 19-Oct) (PACS-ME-TP-017)1-2x SFT HeI & HeII (PACS-ME-TP-017)5-7x IST program incl. RMS (PACS-ME-TP-021) TB/TV Tests (PACS-ME-TP-021) X

PACS SVR38/9 Nov 2007 System Testing7 System Test Elements (2) SVT-1 System Validation Test (PT-HMOC-OPS-PL-6204-OPS-OAH): “The purpose of the System Validation Tests is to test and validate the external interfaces from the MOC to the satellite, in closed loop, and to validate the satellite TM and TC database definition. The contents of the SVTs are designed to test these interfaces and the database with an increasing level of realism and complexity from one SVT to the next, making use of the satellite nominal and contingency flight operations procedures in the performance of the tests. Replacement or additional SVT specific procedures may also be required.”  consists for PACS at present of all manual procedures from the IUM, however it is unlikely that the “to-be-translated” mechanism and SFT procedures can make it into SVT-1 (is expected to be run be run at HeI, will require ICC participation)

PACS SVR38/9 Nov 2007 System Testing8 System Test Elements (3) EMC Tests (PACS-ME-TP-032) SOVT-1 System Operational Validation Test (PT-CMOC-OPS-PL-6212-OPS- OAH, draft 0.1) : This will be a spacecraft End-to-End test of routine operations. It will involve the entire PACS ICC. Observations will be similar as for RMS test, but extended by selected AORs (RV & BA). Requires and MTL-ODValidityUpload DTCPContents MTL-0D1/06:00 - D1/18:00 DTCP-0 (D1/06:00) Leading to DTCP-1 MTL-1D1/18:00 - D2/18:00 DTCP-1 (D1/12:00) PACS photometer (50%) and spectrometer (50%) MTL-2D2/18:00 - D3/18:00 DTCP-1 (D1/12:00) HIFI operations MTL-3D3/18:00 - D4/18:00 DTCP-2 (D2/12:00) SPIRE/ PACS scenarios (PACS photometer, SPIRE photometer, parallel mode) MTL-4D4/18:00 - D5/18:00 DTCP-3 (D3/12:00) SPIRE/ PACS scenarios (PACS photometer, SPIRE photometer, parallel mode)

PACS SVR38/9 Nov 2007 System Testing9 System Test Elements (4) SVT-2 will be similar to SVT-1, but with lessons learnt, possible extensions and/or new procedures: Emphasis on “Extended Instrument Interface Validation and Extended Database Validation” SOVT-2 will include eventually also more non-routine operations and eventually also more delivery processes. Launch Campaign  content and PACS contribution TBD (i.e. just SFT like or more IST like ?)