Role of Investor Owned Utility in Development of Wind Energy in Iowa from an Engineers perspective Jeff Bales June 2011.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization and Flowgate Allocations Equity Concerns of Non-Market Transmission Owners Equity Concerns of Non-Market Transmission Owners.
Advertisements

Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Session 7 Case studies and Solutions Nursery Management Understanding and Managing Finance.
Wind and Solar Integration in Colorado: Challenges and Solutions Colorado Rural Energy Agency Energy Innovations Summit Energy Storage for Intermittent.
Queue Reform at the Midwest ISO NARUC February, 2008.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
EIUG – Wheeling Methodologies
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Small Farm Profitability: Is Wind Energy the Answer? 1
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Nodal Pricing in an LMP Energy Market
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Melissa Seymour Midwest Market Structure Iberdrola Renewables June 7, 2010 Mid-America Regulatory Conference Kansas City, MO Integrating Renewables on.
Regulatory Flexibility Committee Strategies for Procuring New Generation September 18, 2013 INDIANA POWER OF WIND COALITION.
Network Customer Meeting Access Metric Update November 16, 2006.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
12/5/2003Global Energy Concepts, LLC1 of 11 Characteristics of Financeable Wind Energy Projects Northwest Power and Conservation Council Workshop on Wind.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
Discussion Forum 2004 APPA National Conference June 19 – 23, 2004 Seattle, Washington Issues for Green Power Programs Designing Marketing and Pricing.
2007 Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007 Tim Wilson, Planning and Operations Analyst.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
© 2002 J.D. Power and Associates. All Rights Reserved 2002 Electric Utility Residential Customer Satisfaction Study Cedar Rapids, Iowa August 7, 2002 Presented.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Illinois Wholesale Market Update December 10, 2003.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Management of Working Capital. Balance Sheet A financial statement that summarizes a company's assets, liabilities and shareholders' equity at a specific.
上海金融学院 1-1 Lecture 3 Investment Banking Basics: The Financial Statements.
Welcome to Cedar Ridge Wind Farm Alliant Energy’s first fully owned-and-operated wind facility.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Moving Forward – Maximizing Your Energy Management 2009 and 2010 Rate Issues WPSC Executive Team Barb Nick – SR Vice President Energy Delivery & Customer.
Wind Management at MISO
Wind Energy in Iowa Lori McDaniel
New Mexico Electricity An Industrial Perspective
Community Wind Development
Evolving Economic Dispatch in SPP
MRES Resource Operations in SPP
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Changing Market Dispatch
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
NERC Congestion Management
Presentation transcript:

Role of Investor Owned Utility in Development of Wind Energy in Iowa from an Engineers perspective Jeff Bales June 2011

2 Who are we? Alliant Energy Corporation is a public utility holding company headquartered in Madison, Wisconsin. Alliant Energy's two regulated utilities include Interstate Power and Light Company (IPL) and Wisconsin Power and Light Company (WPL). In addition it has several other non regulated entities. Two of those are RMT and CRANDIC. WPL generates, purchases and sells power in Wisconsin and has some ownership in the American Transmission Company who provides transmission service in Wisconsin IPL generates, purchases and sells power in Iowa and Minnesota. Its service territory serves the southern part of Minnesota and also is scattered throughout the state of Iowa. IPL sold their transmission system to ITC (Iowa Transmission Company)

3 Who are we ? Alliant Service Territory The IPL service territory is scattered due to the merging of several smaller utilities in the past 20 years named Iowa Electric, Iowa Southern, and Interstate Power and Light.

44 Energy Delivery Update Technology Confidential

5 Alliant Strategic Plan Alliant Energy Utilities Strategic Plan is built on three key elements:  Competitive Costs  Reliable Service  Balanced Generation

6 Our sources of electric power in 2007 were 54% coal, 6 % natural gas and 39% Purchased Power. The 39% purchased power leaves our customers to unpredictable fuel costs. These fuel cost can sometimes make up 50% of our customers bills. Due to state and federal legislation it is important that we have a balance mix of generation. Alliant now owns and operates a total of three wind farms  Cedar Ridge (68 MW near Fon Du Lac Wisconsin)  Whispering Willow (200MW near Iowa Falls Iowa)  Bent Tree (200MW near Albert Lea Minnesota) Thru second quarter of this year the owned wind farms and Purchase Power Agreements made up 6% of the generation in our service territory. We have several locations under development such that if it makes sense to add more wind to our fleet we will do so. Balanced Generation

7 Role of Investor Owned Utility in Development of Wind Investor owned utilities are able to see the entire process from beginning to end. Have key roles in the paradigm shift as significant milestones occur. Contracts for Purchase Power Agreements Owning Wind Farms Operating Wind Farms

8 Role of Investor Owned Utility in Development of Wind Owning Wind Farms  Forecasting the output of wind farms  Impact is to Production Tax Credits that are forecasted in our financials on a quarterly basis.  Impact to our fuels forecast  Impact to the remaining fleet of generation in the area

9 Development Process – Long Term Forecast (LTF)

10

11 Development Process (LTF)- Wind Source The P50 number represents the probability of that level of generation being met. Probability numbers are used for different circumstances relative to bank loans and in some instances negotiations around a purchase power agreement. This number only takes into account the assumed losses and the statistics around long term data. One forecasting vendor is presently challenging some of the historical information coming out of these reports (nationally) based on poor data sets from the different ways of collecting long term data and comparisons to actual data. Part of due diligence is the comparison of a utility wind owned facility to a purchase power agreement. Bottom Line- When comparing different alternatives understand which P value you are comparing to.

12 Development Process (LTF)- Transmission Midwest Independent System Operations is the controlling entity for the state of Iowa at the Regional level Two transmission utilities presently provide the majority of services for MISO Our two owned wind farms are located in the Iowa Transmission Company footprint of service. Currently each of our 200MW wind farms are working within a provisional Generator Interconnect Agreement. MISO continues to do studies to accommodate customer base however timing of such studies and implementation seem to be in the 5-7 year time frame and not in the current two to three year cycle. Optional Studies have been completed by MISO for Alliant under, at that time, current conditions and also with certain assumptions by the customer. Under these conditions a Provisional Generator Interconnect Agreement can be pursued with implementation in the 14 month timeframe while larger studies continue.

13 Example of Optional Study Result (LTF)

14 Development (LTF)- Bringing them together Previous number represents the Provisional Limit and is posted by MISO quarterly. In some instances this can change which will effect your forecasted outputs. How do Purchase Power Agreements handle Provisional status ? Internally owned Wind farms

15

16

17 Development Process (LTF)-Internal

18

19 Development Process (LTF) What makes up the other curtailments?  Two buckets  Operations Curtailment  Economic Curtailment

20 Development Process(LTF)-Operations Curtailment (MISO document June 2010) Wind Farm that is registered Intermittent Resource or (IR) cannot be dispatched as part of the real-time dispatch software at MISO Result of this necessitates manual curtailment by MISO to relieve transmission constraints LMP node under this condition does not reflect congestion Results of these conditions were that until April of this year 90% of curtailments were operational in nature and not economically based.

21

22 Development Process(LTF)- Economic Curtailments Beginning in April Alliant Energy wind farms began seeing much more volatility in LMP prices at the wind farms. Result of this necessitated manual curtailment by Alliant GDC to relieve economic concerns over negative LMP prices Due to timing issues Alliant GDC could not keep up with the changing 5 minute LMP pricing. Results of these conditions were that a large shift in curtailments between operations and economic began to change on a percentage basis. As a result Alliant has signed up Wind Farms for Dispatchable Intermittent Resource so it can take advantage of automatic control to maximize efficiency. Two of our Three wind farms will implement this feature in September.

23 Forecasting- Economic Curtailments

24 Development Process (LTF)-Economic Existing Purchase Power Agreements do not have language to address issues around negative LMP. When new PPA are negotiated this will definitely be taken into account. Will have impact on developers ability to execute on loans and quality of their forecast Present PPA did not have scrutiny around producing at negative rates. Impacts operations as well with most contract services being driven off availability. Present take is on shoulder months where load vs generation has base units backed off to minimum will be the months where forecasts will be impacted. No longer can assume the best wind months are the best for wind farm output presently at Alliant.

25 Summary Long Term Forecasting Investor owned utilities are learning that the wind forecast is just one component of the forecast. As wind generation continues to make penetration expect local congestion issues to continue. Investor own utilities will need to understand all conditions as the wind becomes more of a segment of the generation on how there fleet of generation will be dispatched. Wind farms must develop a y=f(x) concept to ensure they manage each component of the forecast well to understand the dynamics moving forward and are able to report to their customer base. Vendors and suppliers of forecasting services will need to get into the operation segment of wind farms to understand controls and maintenance to provide turn key services. Signals from turbines as it relates to local conditions will become next generation of improvement in short term forecasting