Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Jim McElwain College Architect SETTING UP A LABORATORY.
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Spring 2009 Bedroom Project Welcome to the Workshop.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Overview - Title Slide An Overview of The United States National CAD Standard.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
Foundations of Real Estate Management TM BOMA International ® Module 2: The Well-Versed Real Estate Manager Tenant Improvements and Capital Projects.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Who Put that Column into the Middle of the Room? Designing Functional, Flexible, and Forgiving Spaces for Library Instruction Paul Glassman Hofstra University.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
The Australian Owner Builders Planning Kit. What is the Australian Owner Builders Planning Kit?  The planning kit is an essential tool for people looking.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
Conceptual Cost Estimating
1 Construction Planning and Management: Tanya Vartivarian Director of School Services IFF June 2010.
Design & Layout of Foodservice Facilities
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Interior Construction
Facility Design. Overall Design Process Planning committee Needs assessment Select construction process model Select architect Develop schematics Secure.
Construction Contracts and Project Delivery Methods
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
The Hamptons Interior Design Course A Introduction to Interior Design.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
INTERIOR DESIGN BY DIANA LA. INTERIOR DESIGN ACTIVITIES Search for and bid on new projects Determine the client’s goals and requirements of the project.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Chapter 2 Introduction to Construction Procedures
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Preliminary Project Descriptions/Outline Specifications
Main Idea Interior designers make interior spaces functional, safe and beautiful for almost any type of building. Such as offices, homes, shopping malls,
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
A few different things… ID 206 construction + materials II.
Chapter 9 ID 234 Building Codes Fall 2012 Finish and Furniture Selection.
INTERIOR DESIGN STAR EVENT. MEET YOUR CLIENTS The home is laid out similarly to this ranch home. THE SPACE.
Allowances, Unit Prices, and Alternates ACT
Programming id 475 advanced issues. total programmed square footage = total project square footage total programmed square footage = total project square.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Introduction to Building Trades Denver High School.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Construction Planning
Finished Basement - Your Basement Deserves More
Planning and Scheduling a SIMPLIFIED Construction Project
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Best Interior Designers in Udaipur Kapil Jain Architects
INTD 405 Modern Practices in Interior Design PLANS
Facilities Modernization Program
House Construction Budget Plan
TCU-PROJECT: 7TH Semester Course
Carleton College Facilities Management
PULSE Building Renovation
FIVE PROJECT PHASES.
“Intro to Blueprint Reading”
Presentation transcript:

pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references to book (or not) outside information or experiences outside information or experiences body language, eye contact, voice body language, eye contact, voice how to present a chapter?

Chapter 1 learning about materials for interiors

Review materials for each chapter as we cover it Review materials for each chapter as we cover it Discusses the “Health Club” project – we will use the Endicott ID Classroom Wing instead Discusses the “Health Club” project – we will use the Endicott ID Classroom Wing instead Thus the CD information for chapter 1 isn’t really pertinent Thus the CD information for chapter 1 isn’t really pertinent Take a look at chapter 2, though Take a look at chapter 2, though using the CD

201: Graduate Students (lot’s of seminars and presentations) 201: Graduate Students (lot’s of seminars and presentations) 202: Drafting room (dirty; model making) 202: Drafting room (dirty; model making) 203: Office (private, comfortable) 203: Office (private, comfortable) 204: Materials Room (high density storage) 204: Materials Room (high density storage) 205: Computer Lab (tables, glare) 205: Computer Lab (tables, glare) 206: Lighting Lab (window treatments; lots of switches) 206: Lighting Lab (window treatments; lots of switches) project program

welcome to Excel welcome to Excel columns for location, finish key, material, description, area, and notes columns for location, finish key, material, description, area, and notes rows for floor, walls, ceiling, and trim in each space (often more than one) rows for floor, walls, ceiling, and trim in each space (often more than one) the material schedule

Chapter 2 parties to the project

Finishes Finishes Furnishings Furnishings Equipment Equipment Non-structural interventions Non-structural interventions Structural interventions Structural interventions Area (or volume or dollar value) of project Area (or volume or dollar value) of project scope indicates how big a party

design-bid-build design-bid-build design-negotiate-build design-negotiate-build design-build design-build owner-build owner-build construction manager-advisor construction manager-advisor types of contracts

client client architect architect interior designer interior designer engineers engineers building and fire department officials building and fire department officials other design specialists other design specialists acoustic, lighting, hardware, furnishings, health care, etc. general contractor general contractor demolition crew electricianplumbercarpenter the typical players

Allowance Allowance Bid Bid Change order Change order Contractor Contractor Estimate Estimate Fixed price contract Fixed price contract Payment schedule Payment schedule Permit Permit Punch list Punch list Retentions Retentions Stop order Stop order Time and materials contract Time and materials contract Zoning Zoning glossary from Chapter 2

divide into five groups of four divide into five groups of four Owner: wants project done in two months, for $50/sf Contractor: can do project in five months, for $100/sf Building official: need to approve plans, issue demolition and construction permits, and inspect work Interior Designer: must help parties compromise, and then produce a design that meets their time frame and budget discuss the upcoming project with each other discuss the upcoming project with each other each write an to the other three outlining the schedule and what your responsibilities are each write an to the other three outlining the schedule and what your responsibilities are communication must be clear

deadline for the completion of construction payment procedures date for permit set (and time until review is complete) when inspections will be required time for demolition time for rough carpentry, electrical, plumbing, finish work, and equipment/furniture installation cost for the project (total, and per square foot) what to negotiate

read Ch. 3, Costing (including the information on the CD) read Ch. 3, Costing (including the information on the CD) Fill out chart: choose materials for each surface of each room Fill out chart: choose materials for each surface of each room Estimate square footage of each room, and ceiling heights Estimate square footage of each room, and ceiling heights Include area of individual materials Include area of individual materials for Monday: