Purpose 1 28.01.2015 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.

Slides:



Advertisements
Similar presentations
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
Advertisements

DSPS Safety, Prevention & Health Domain EMERGENCIES / Emergency procedure Immediately activate the building fire.
Monitor a Safe Workplace BSBOHS407A By Amorntip IM-UM ID : C62151.
A Guide to Fire Alarm Service and Maintenance Requirements.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Emergency Action Plans/Fire Prevention Plans
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Emergency Action Plans
Employee Emergency Action Plans and Exit Routes Training Program.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
© Palaniappan R Kannan PMP.,CFSE 1 IEC Standard – What is it? IEC is a Standard for the functional safety of Electric / Electronic / Programmable.

© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Planning, Prevention and Maintenance: Passive Fire Protection and Evacuation Presented by - Peter Barker.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
This presentation is for educational purpose only – Copyrights 2014 © Dr Ahmed Jaheen.
Emergency Action Plans
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
Transport need for SPS external dump to the new dump cavern area LIU-SPS external beam dump JL GRENARD EN-HE
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
OCCUPATIONAL SAFETY AND HEALTH Do you remember those school fire drills ? Well, here you go again !
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Safety Documentation Formerly an exotic unknown, today part of the work!
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Emergency Preparedness & Response
Fire Risk Assessment Judith Evans BEng(HONS) CMIOSH
Together with our strategic partners, Secura held a survey for discovering the current challenges, trends and information needs that companies face today.
Safety and Prevention of Typical Fire Plan
MEDICIS Safety Alarms Systems
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Some arrangements for personnel safety 1- Procedures for access
Strategy for conformity of non-standard cryogenic equipment
FCC lifts Layout, characteristics etc.
HSE rules & regulations
East Area Renovation Project team #6 Launch safety agreement
Quality Assurance applied to Accelerator Safety
EP Experiments safety validation process Safety Permits
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
29 CFR NFPA Life Safety Code
EMERGENCY In case of an emergency DO THIS EVACUATION FIRE
SAFE WORK INSTRUCTIONS
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Safety in the East Area Renovation Project
CR-GR-HSE-419 Safety of excavation works
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional aspects EDMS

Introduction Description of the Project Information provided by the Project Leader/PSO/EXSO LIU-SPS external beam dump meeting - C. Colloca DGS/SEE NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

Description of the Project LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Schedule and organization NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

Safety domains identification LIU-SPS external beam dump meeting - C. Colloca DGS/SEE NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

Safety (conventional) Clearance LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Safety requirements & Safety documentation contents per domain NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Safety requirements Safety documentation (part of Safety file/folder) contents NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 7 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 1/3 The project shall comply with the following CERN Safety rules: CERN Safety Code E - Fire protection. The following Swiss legislation applies, if not differently stated in CERN Safety Code E: Swiss Directives on Fire prevention, AEAI For fire prevention requirements on material, cables, etc. please refer to ch. 6.2 and ch A fire detection system has to be foreseen (contact GS/ASE). Its design, installation, commissioning, disabling, maintenance, and periodical inspections have to be done according to the Safety Instruction IS 37 - Alarms and alarm systems.IS 37

LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 8 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 2/ Fire compartments A fire compartmentalization shall be implemented. Typically, the volume of fire compartments should be as small as possible. However, taking into account the low value of fire load density (except for the dump cavern and in the alcove) and the low occupation in the different areas (for maintenance and only during shutdown phases), 4 fire-rated separations equipped with fire doors shall be installed in order to create 3 fire compartments. A separation is to be foreseen between the ECX5 and the connection tunnel, a second separation at the junction cavern, a third one upstream the zone “dump cavern + evacuation tunnel” to the SPS and a last one in the evacuation tunnel that separates the dump tunnel from the SPS. In this way, new compartments “connection tunnel”, “dump tunnel” and “alcove + dump cavern” are created.

LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 9 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 3/ Evacuation Evacuation of occupants in case of emergency will be via a tunnel (escape tunnel) connecting the dump tunnel to the SPS. Ideally, from the point of view of fire safety, the tunnel should be at a maximum of 10 m from the exit of the dump cavern, while respecting the constraints of the machine to the outlet in the SPS. To allow for safe evacuation, bridges will be provided where necessary for occupants to move beyond or below the beam pipe.