© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are registered.

Slides:



Advertisements
Similar presentations
Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
Advertisements

Generalized Multiprotocol Label Switching: An Overview of Signaling Enhancements and Recovery Techniques IEEE Communications Magazine July 2001.
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
1. 2 Branch Office Network Performance Caches content downloaded from file and Web servers Users in the branch can quickly open files stored in the cache.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Levetidsforlengelse av Existerende felt Oppgradering av kontrollsystemer subsea Erfaringer og losninger fra Tordis og Vigdis February 8 th 2012.
© 2012 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Don McAuley Senior Optical Pre-Sales Engineer Interoute Barnard’s Inn London R ESEARCH N ETWORKING FROM AN O PERATOR’S PERSPECTIVE.
Optical Networking and Communications Market Analysis, Market Size, Analysis 2014 To 2020 Grand View Research has announced the addition of " Global Optical.
© 2010 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are registered.
© 2007 Pearson Education Inc., Upper Saddle River, NJ. All rights reserved.1 Computer Networks and Internets with Internet Applications, 4e By Douglas.
© 2007 Verizon. All Rights Reserved. PTE /07 FCC Workshop Global Broadband Connects the World Jacquelynn Ruff Vice President, International Public.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Carlsbad, CA | Washington, DC | Exeter, UK | Singapore | | The Flat Earth Theory: Convergence of Prices Around.
BJARNI THORVARDARSON CEO May 2015 Hibernia Express Providing Direct Access from Cork, Ireland to North America and Europe Hibernia Networks 2015 Private.
Broadband Communications via Satellite Presented by Eric Zucker.
1 © 2004, Cisco Systems, Inc. All rights reserved. Wireless LAN bridge.
Educause Tempe, Arizona, February 4 th Agenda Evolution of Transoceanic internet capacity demand and supply Impact of the Telecom recession Future.
4G LTE GOES MAINSTREAM Applications for State Government Matt Hensler, Wireless Solutions Engineer, Sprint
BROCADE FASTIRON WS SALES PROMOTION BRC0029 © 2013 Brocade Communications Systems, Inc. CONFIDENTIAL— Company Proprietary Information. 1.
Measuring DANE TLSA Deployment Liang Zhu 1, Duane Wessels 2, Allison Mankin 2, John Heidemann 1 1. USC ISI 2. Verisign Labs 1.
Introduction to MS ® Access for SCT Banner ® Users Evaluation Code 607 Sarah Lawrence and Malinda Richbourg University of North Carolina at Greensboro.
The Optical Communications Market
Carlsbad, CA | Washington, DC | Exeter, UK | Singapore | | The Flat Earth Theory: Convergence of Prices Around.
Defence and Communications Systems EADS Secure Networks The role of TETRA in Homeland Security.PPT /HVi The Role of TETRA in a Holistic Homeland.
Review of Power Blackout on Telecom P. J
Claire Gibson, Wave Hub General Manager 19 February 2013
© 2013 VCE Company, LLC. All rights reserved. CDCA SBIOI April 18, 2013 VCE: A FOUNDATION FOR IT TRANSFORMATION.
© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are service.
Built by Developers for Developers…. © 2009 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names.
May 25, 2015 Cork at a Crossroads. What is Arctic Fibre Subsea cable project that provides both transoceanic and domestic connectivity International:
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
1 Interconnecting the Cyberinfrastructure Robert Feuerstein, Ph.D.
Overview What is a weak system? Useful metric to identify weak systems: SCR What could possibly go wrong? Is a weak system so bad? What can you do? Risk.
© 2012 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or.
© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are service.
Communication Networks Fourth Meeting. Types of Networks  What is a circuit network?  Two people are connected and allocated them their own physical.
© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets, the (3) mark and the Level 3 Communications.
Redundancy in High Performance Networks Fall 2005 Internet2 Member Meeting.
1 xG® and xMax® are registered trademarks of xG Technology, Inc. Copyright 2011, All Rights Reserved. Sept 2012 Cognitive Radio Policy.
Feature: Customer Combiner and Modifier © 2013 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are.
What is Bandwidth on Demand ? Bandwidth on Demand (BoD) is based on a technology that employs a new way of managing and controlling SONET-based equipment.
 2007 Level 3 Communications, Inc. All Rights Reserved. 1 Business Markets Group: Reliable and Responsive Prepared for CUSTOMER NAME PRESENTER’S NAME.
The transition from live to file – How it’s changing video transmission networks? Keith Goldberg, VP, Transmission Operations, Fox Networks Ryan Korte,
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Project Portfolio Management Business Priorities Presentation.
customer.
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
Interoperability. Session Objectives and Takeaways This is a largely a non-technical discussion Session Objective(s): – Share my learning's from the delivery.
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Simplifying Cloud Connectivity for Your Clients Presenter: Tom SharkeyTom Sharkey December 8,
Development Authority of the North Country 317 Washington Street, Suite 414 Watertown, NY An Economic Development Initiative.
June 2010 The Compelling Proposition of Belfast TransAtlantic Opportunities Thursday, June 9, 2010 Bjarni Thorvardarson, CEO.
Security through diversity. Hibernia Atlantic Overview Launched in 2001 as the 360networks transatlantic cable system Purchased by Columbia Ventures Corporation.
    PRODUCT PRESENTATION ON :   INCREASING REVENUE BY USING GLO 3G NETWORK TO SUPPORT REMOTE AUTO DIAGNOSIS AND MANAGEMENT (GLO VEHICLE DIAGNOSIS AND MANAGEMENT)
ExpressRoute for Office 365 Training
Phase 4: Compelling Case for Change
ExpressRoute for Office 365 Training
Windows Server 2003 Migration
Avanade Trade Organization Structure
Data Center Colocation Services.
Data Center Colocation Services.
Matías Heinrich VP Operations Latam October 2011
Business Continuity Program Overview
AT&T Network Based Firewall with NetBond® for Cloud
Direct International Connectivity Project Kelvin
Microsoft Virtual Academy
Utilizing the Network Edge
Presentation transcript:

© 2009 Level 3 Communications, LLC. All Rights Reserved. Level 3 Communications, Level 3, the red 3D brackets and the Level 3 Communications logo are registered service marks of Level 3 Communications, LLC in the United States and/or other countries. Level 3 services are provided by wholly owned subsidiaries of Level 3 Communications, Inc. Any other service, product or company names recited herein may be trademarks or service marks of their respective owners. Level 3 ® Transoceanic and EU Network Services

2  2010 Level 3 Communications, LLC. All Rights Reserved. 2 Meeting Objective Brief history in time Sub-sea design and reliability Network; sub-sea and terrestrial Risks and how to mitigate them Future technologies

3  2010 Level 3 Communications, LLC. All Rights Reserved. 3 TA History 1998  Fully redundant, three ring SDH networks deployed – i.e Gemini  Gemini network sliced in two – TA went unprotected.  Yellow, Level 3 built cable RFS  TAT-14 RFS 2001 onwards  Large number of private TA systems deployment, Flag Atlantic, TATA Communications (Tyco), and Hibernia  Apollo, latest transatlantic went into service  Designed for the unprotected 10G wavelength market and served a need to avoid Manhattan with its direct connection to Washington  Technology advances meant additional capacity and new products available; 10Ge wavelengths 2009  Product enhancements 40Gbit/s trial, protected waves, Gige over wave 2010  40G waves deployed on TA systems for capacity benefit.

4  2010 Level 3 Communications, LLC. All Rights Reserved. 4

5 5 Cable routing and design… Inherently reliable Improvements in route selection, survey and installation. New cable design also enhanced the reliability of TA systems. Fault rates low, combination of improvements in deployment, after installation management and fishing trends.

6  2010 Level 3 Communications, LLC. All Rights Reserved. 6 What on earth could go wrong?

7  2010 Level 3 Communications, LLC. All Rights Reserved. 7 Marine Environment

8  2010 Level 3 Communications, LLC. All Rights Reserved. 8 …and Repairs

9  2010 Level 3 Communications, LLC. All Rights Reserved. 9 Resiliency and Priority Modern TA systems can potentially carry over 1 Terabit – per fiber pair Faults vary in the type and required repair duration - operators will assess traffic on the effected cable and restore as appropriate Terrestrial faults more frequent; important to know the diversity and precise routes utilised. Operators do not know what is contained within the wavelengths; advice required FCC recently undertook a review of sub-sea systems “Voluntary Request for Cable Status Information” – early warning and situation awareness Level 3 fully complies with FCC requirements and provides information regarding the submarine cable integrity of Yellow.

10  2010 Level 3 Communications, LLC. All Rights Reserved. 10 Expected Latency (rtd) Transatlantic Network Diversity and Latency CableCommentNew York-LondonNew York-FrankfurtChicago-London *Chicago-Frankfurt * YellowLevel 3 built68 ms83 ms87 ms101 ms AC1Limited wave capacity68 ms82 ms86 ms100 ms Apollo North68 ms82 ms86 ms100 ms HiberniaCan avoid NY81 ms95 ms97 ms111 ms FLAG North68 ms82 ms86 ms100 ms Apollo SouthCan avoid NY, London84 ms**86 ms**98 ms101 ms Utilizes Liquidity Express Route **10 Gig only. 2.5 Gig latency is higher

11  2010 Level 3 Communications, LLC. All Rights Reserved. 11 Caltech Network Design

12  2010 Level 3 Communications, LLC. All Rights Reserved. 12 The future Strong demand for 10G and 10Ge continues. To date, 40G terrestrially and sub-sea wise market not commercially viable owing to interface costs; signs that this is changing. Question mark over 40G; is this a transient technology? Market now appears to be solidifying but 40G and 10G can run side by side. 100G sub-sea wise some way off still; but developments in the 40G equipment giving positive indications on the ability to transmit 100G on transoceanic distances. Technology advances has delayed to build of a new TA cable and may continue to do so.

13  2010 Level 3 Communications, LLC. All Rights Reserved. 13 Thank you and Q&A.