DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.

Slides:



Advertisements
Similar presentations
1 Distributed Generation Task Force November 5, 2007.
Advertisements

1 Annual Validation and Settlement Load Allocation By Ernie Podraza Reliant Energy August 10, 2005 RMS Meeting Material.
ERCOT Analysis of 2005 Residential Annual Validation Using the Customer Survey Results ERCOT Load Profiling Presented to PWG - October 26, 2005.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Generation Task Force November 29, 2007 TAC Report.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
1 ERCOT LRS Precision Analysis PWG Presentation February 27, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
PWG Profiling Working Group March 20, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 20, 2003.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 UFE Workshop Sponsored by COPS October 19, 2004.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Distributed Renewable Generation Profile Implementation Plan.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
1 Profiling Working Group Update to COPS October 14, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Solar Profiling Interstate Renewable Energy Council presentation to the ERCOT Profiling Working Group Jan. 22, 2008.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
Profiling Working Group March 18, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting March 18, 2004.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group January 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 14, 2004.
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
Hypothetical Examples of How Residential Photovoltaic (PV) ESI IDs Could be Settled ERCOT Load Profiling.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
-- Presentation from PWG -- Profile ID Assignment and Annual Review Process November 17, 2005.
1 TX SET Update to RMS March 14, Drop to AREP Changes PUCT Project oOne of TX SET 2007 goal is to evaluate approved Rulemakings and determine.
Distributed Generation Task Force
Profiling Working Group
Presentation transcript:

DRG Slides for PWG Update to COPS

2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable provided a readily available profile has been accepted and validated by ERCOT –No consensus on specific methodology, but Excess generation should be profiled in a type-specific manner and The load profile should reflect solar output during daylight hours –Recommended assigning solar profile development to PWG

3 TAC Instructions to COPS/PWG At the January 3,2008 COPS reviewed the DGTF recommendations –TAC requested that PWG/COPs assess and further develop profiling options for consideration to address small distributed renewable generation –TAC members indicated that PWG should take into consideration the generation characteristics specific to the renewable technology

4 Settlement of Outflow Only Some possibilities for allocating the PV-generated outflows: 1. Spread the energy evenly over daylight hours 2. Spread the energy evenly over the peak PV generating hours 3. Spread the energy using a PV model 4. Spread the energy using both a PV model and the existing settlement load profile How can the outflow for residential photovoltaic (PV) arrays as measured at the point of interconnection be settled?

5 DGTF Attachment A

6 DGTF Attachment B

7 DGTF Attachment C

8 DGTF Attachment D

9 Distributed Renewable Generation (DRG) TDSPs responded to ERCOT’s request for information on premises that have DRG with a generation capacity < 50 kW. What is out there? Five of the ESI IDs included above have PV and wind generation. This means there are currently 87 unique ESI IDs known to have one or more type of DRG (< 50 kW).

10 How much energy will a PV array produce? Given the currently known average Residential PV generation capacity of 3.5 kW (AC), at 100% capacity factor there would be (3.5 * 24 =) 84 kWh generated per day. If we utilize the Interstate Renewable Energy Council’s irradiance estimate of 20% from its presentation to the DGTF on 12/04/07, the estimated yield would be 16.8 kWh per day. Applying the above to the average Business PV generation capacity of 8.9 kW (AC) yields an estimated 42.7 kWh per day. For simplicity, the energy produced by a PV array is presented in most of the slides as a sine wave spanning 9:00 AM to 5:00 PM.

11 –Represented using Sine function –Begin/End Times for PV Generation are day of year & weather zone specific 1 hour after sunrise 1 hour before sunset –Daily kWh Generation for Residential is based on 3.5 kW with a 20% capacity factor Average daily PV Generation is 16.8 kWh Average daily PV produces output for 10.2 hours (range: 7.9 – 12.4) Daily PV Generation is prorated based on hours of generation for the day compared to an average day Example day with 8 hours of Generation: PV Generation Assumptions

12 Residential PV Model assumptions – Standard Profile multiplied by to adjust to average usage level for PV ESIIDs – Subtract PV Generation from scaled up Profile – if result in an interval is negative, set to zero Business PV Model assumptions – Standard Profile multiplied by to adjust to average usage level for PV ESIIDs – Subtract PV Generation from scaled up Profile – if result in an interval is negative, set to zero Residential and Business Wind/Other Model assumption – Standard Profile used – the interaction between wind generation and load is unpredictable DRG - KWh Load Models

13 PV Gen PV Profile Standard Profile Residential HIWR North PV

14 Excess generation is the energy flowing into ERCOT from the premise PRR756 - Credit for excess generation handled as an adjustment to load in settlement process – PV assumption: Flat line from 11am to 3pm – Wind/Other assumption: Flat line for entire day Settlement adjustment is triggered by a DRG Profile ID assignment Profiling Excess Generation

15 Residential PV – Applying the Profile

16 Breakdown of Proposed DRG Models 8 Models per Profile Type to represent Weather Zones BUSIDRRG and RESIDRRG are not generation type specific:  Profile ID assignment is used to trigger settlement adjustment for excess generation  KWh Load and kWh Gen are settled with actual interval data

17 DRG Profile ID Assignment TDSPs submit documentation to ERCOT to initiate a change to a DRG Profile ID assignment. ERCOT validates requests within 5 Business Days and notifies to initiate the Information required from TDSP Affirmation of Interconnection Agreement with customer and effective date Generation Type, and characteristics Metering configuration Inverter information if applicable (DC Generation)

Guidelines for Development of Load Profiles In developing Load Profiles, ERCOT shall strive to achieve an optimal combination of the following: (1)Give no unfair advantage to any Entity; (2)Maximize usability by minimizing the total number of Load Profiles without compromising accuracy and cost effectiveness; (3)Minimize the Load Profiles’ contribution to UFE over all Settlement Intervals, paying particular attention to higher cost periods; (4)Reflect reasonably homogenous groups, with respect to load shape and likely supply costs; (5)Develop Load Profiles that are distinctly different; (6)Develop Load Profiles for areas with incomplete load data utilizing data from other sources, taking into account similarities and differences in load; (8)Use the most accurate load research data available; and (9)Develop Load Profiles based on readily identifiable parameters that are not subject to frequent change.

19 Distributed Renewable Generation Modifications LPGRR030 Pros: Incorporates kWh load modifications resulting from PV Generation behind the meter PV and Non-PV DRG Profile ID assignments results in specific settlement cuts, and supports the reporting of load by Profile ID DRG Profile ID assignments trigger settlement for kWh Gen specific to the DRG type Allows forecasting systems to track customers by their DRG Profile ID to better forecast the balancing market schedules Shadow settlement systems perform the same basic evaluation as present Cons: Large (128) increase in the number of Profile IDs used in ERCOT and Market Participants settlement and forecast systems

20 Alternatives for DRG - LPGRR030 Concerns were raised at the March 26, 2008 PWG meeting about the large number of new Profile IDs being introduced for DRG Several alternatives were discussed and then narrowed to three options: 1.LPGRR030 as drafted new Profile IDs 2.DRG Profile IDs only for PV - 72 new Profile IDs 3.RESPV, BUSPV, RESWD, BUSWD, RESIDR, BUSIDR * 8 WZones – 48 new Profile IDs PWG did not have consensus on a single option

21 DRG Profile IDs only for PV Option 2: Pros: 72 Profile IDs instead of 128 – eliminated the requirement for Non-PV DRG Profile IDs DRG Profile ID assignments trigger settlement for kWh Gen specific to PV Cons: No settlement cuts for Non-PV ESIIDs with DRG; increases the difficulty to report NonPV DRG metrics No trigger for settlement for kWh Gen specific to Non-PV (requires an assumption that data in the meter-loop for ESIIDs with standard profiles are for Non-PV DRG) Increases the difficulty to perform required quarterly and annual validations for Non-PV ESIIDs Requires continuing manual validation of usage records with meter-loop information to confirm they are correctly associated with DRG ESIIDs and use of MarkeTrak to resolves discrepancies Increases the difficulty for forecasting systems to track customers by their DRG Profile ID Does not support Protocols Section 18 PRR756 will need to be amended

22 RESPV, BUSPV, RESWD, BUSWD, RESIDR, BUSIDR Option 3: Pros: 48 Profile IDs instead of 128 DRG Profile ID assignments trigger settlement for kWh Gen specific to DRG type Settlement cuts with DRG Profile IDs will be created Cons: For some PV and Wind ESIIDs the Load shape will be inconsistent with the ESIIDs usage pattern (e.g. RESLOWR settled with RESHIPV) Increases possibility of gaming (e.g. Adoption of DRG to obtain a more advantageous settlement shape) Does not support Protocols Section 18 Creates disincentives for some categories of ESIIDs to adopt DRG (e.g. Adoption of DRG would result in a less advantageous settlement shape)